Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Review and Estimation of the Hydraulic Conductivity of the Overburden above Longwall Panels. Experience from AustraliaBy Winton Gale
"The aim of this paper is to summarise the results and conclusions of Australian Coal Association Research Project (ACARP) Report Cl3013 which relate to water inflows into a mine which occur through t
Jan 1, 2010
-
The Duncan Method of Partial Pillar Extraction at Tasman MineBy Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
Yielding Cement Roof Supports for Longwall MiningBy Alan A. Campoli
Fosroc continues as a leader in the development of cementitious technology for the mining industry. The considerable expertise accumulated in the development of the Fm cement line has been employed in
Jan 1, 1997
-
Longwall Moves At Twentymile Recovery Mesh SystemBy Michael A. Berdine
In early 1997, Twentymile Coal Company took a dramatic departure from traditional longwall recovery methods. Previously, Twentymile's standard longwall meshing procedure included the use of chain
Jan 1, 2001
-
In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock MassBy Andrew J. Hyett
The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not
Jan 1, 1989
-
Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois MineBy Kenny D. Basnett
An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with
Jan 1, 2011
-
Safety and Productivity Innovations in Mechanized BoltingBy Gregory Hinshaw
Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change
Jan 1, 1998
-
A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element ModellingBy A. K. Bhattacharyya
The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar
Jan 1, 1992
-
Control Technology For Roof Drill OperatorsBy Bob Thomas
The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont
Jan 1, 1999
-
Rehabilitation of Underground Surge Bunker Following Massive Rib Wall FailureBy Rob Robinson
Following a massive rib wall failure along the reclaim belt of the large underground surge bunker at CONSOL?s Bailey Mine, a multifaceted, cleanup and rehabilitation effort was initiated to rapidly st
Jan 1, 2007
-
Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving MiningBy Wenbing Guo
Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and
Jan 1, 2011
-
Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata ZonesBy Martin Bolesta
The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination
Jan 1, 2001
-
The Effects of Longwall Coal Mining on the Hydrogeology of Southwestern PennsylvaniaBy Megan N. Witkowski
The purpose of this study is to investigate the susceptibility characteristics of domestic and agricultural water supplies that may be vulnerable to diminution or total loss of supply when active long
Jan 1, 2011
-
Application Of Time Domain Reflectometry To Ground ControlBy Kevin M. Connor, O&apos
An example application is presented in which Time Domain Reflectometry (TDR) was utilized to monitor roof strata movements during pillar extraction in a potash mine. The study was initiated when Weste
Jan 1, 1990
-
Influence Of Bolts On Discontinuities And Yielding Rock - Conceptual Developments (76baa342-4034-40cb-bc1f-e7c7c132e40f)By Buddhima Indraratna
The paper highlights the conceptual developments in rock mechanics applied to quantify the effect of bolts in the stabilization of joints and yielding soft rocks.
Jan 1, 1992
-
Application of Regional Subspace Detection to Identify Mining Related SeismicityBy Keith D. Koper, Kris L. Pankow, Derrick J. A. Chambers, Michael K. McCarter
"In a mining environment, high quality seismic event catalogs are often useful in interpreting local stress states and identifying areas with elevated ground control risk. Installation, operation, and
Jan 1, 2015
-
A Method For Establishing Site Specific Coal Pillar Design GuidelinesBy Winton J. Gale
Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,
Jan 1, 1992
-
Dynamic Failure in Coal Seams: Implications of Coal Composition for Bump SusceptibilityBy Arthur Miller, Andrew Weakley, Heather E. Lawson
"IntroductionDynamic failure events in an underground coal mine, or “bumps,” are defined as “the sudden, violent bursts of coal from a pillar or pillars or a block of coal, resulting in a section, the
Jan 1, 2015
-
Introducing the New Windows ARMPS-LAM ProgramBy Keith Heasley, Christopher Newman, Zach Agioutantis
"Previously, in 2013, a laboratory version of the computer code ARMPS-LAM, introduced at the 32""d International Conference of Ground Control in Mining, successfully integrated the laminated overburde
Jan 1, 2016
-
The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)By Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011