Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Determination Of The Rock Strength From Portable Rock Tester
By K. F. Unrug
A new testing technique for the determination of the rock strength from portable rock tester is proposed. It is a quick and economical method that can determine the rock strength with reasonable accur
Jan 1, 1990
-
Salt Pillar Design Equation
By Leo L. Van Sambeek
Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th
Jan 1, 1997
-
Intersection Stability and Tensioned Bolting
By Yunqing Zhang
Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt
Jan 1, 2003
-
Effects Of Bedding Plane Sliding And Separation And Tensioned Bolt In Layered Roof
3-D finite element modeling was performed to study the effect of bedding plane sliding and separation and tensioned bolt in layered root It was found that the major influence zones of a tensioned bolt
Jan 1, 2001
-
The Evolution of Pre-Driven Recovery Roadways at Crinum Mine
By Adam Mackenzie, Dan Payne, Yass-Marie Rutty
"Historically, the Crinum mine has experienced significant falls of ground when longwall production slowed to prepare for recovery in weak roof areas. These conditions continue through the recovery pr
Jan 1, 2016
-
International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels
By J. D. Cole
In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C
Jan 1, 1990
-
Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining
By Qiang Fu
ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element
Jan 1, 2002
-
Key Technologies of Integration of Coal Mining–Gangue Washing–Gob Backfilling
By Wei Yin, Yu Wu, Xiexing Miao
"For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in
Jan 1, 2015
-
Detection and Monitoring of Surface Subsidence Associated with Mining Activities in the Witbank Coalfields Using Differential Radar Interferometry
By Gift Makusha
Surface subsidence associated with coal mining activities in the Mpumalanga Province of South Africa changes the natural environment in several ways, and current challenges for mining companies includ
Jan 1, 2011
-
Evaluation Of The Strength Behaviour Of Monolithic Packs (af92f0dd-9b80-4922-891e-7d098de9b5e7)
By S. I. Al-Ameen
Monolithic packing systems have gained in popularity as a gate side packing method, However, there has been no detailed investigation to assess their underground strength behaviour. This work includes
Jan 1, 1992
-
RYBAD Empirical Field Model For Prediction Of Maximum Land Subsidence Associated With Longwall Coal Mining
By Thomas Rymer
Mathematical modelling of mine subsidence measured at 21 locations in Pennsylvania and northern West Virginia allows for the refinement of current methods of predicting maximum land subsidence associa
Jan 1, 1988
-
Seepage and Reinforcement Behavior of Grouting Into Slaking-Prone Mine Tunnel Floor
By Hideki Shimada
In underground coal mines, grouting method is employed in order to reinforce the floor and to control the movement of groundwater into the roadway. However, the seepage and the reinforcement behavior
Jan 1, 2002
-
Numerical Modeling of Standing Support Performance in Entries between Longwall Gobs
By Benjamin Mirabile
"Current and emerging practices to ventilate longwall gobs are prompting increased design and analysis of standing support requirements related to longwall mining. Specifically, additional design meth
Jan 1, 2015
-
Method Of Selecting Suitable Types Of Powered Supports At Longwall Faces
By S. M. Hsiung
A model (support selection model) for the selection of suitable types of powered supports under various geological conditions is proposed. This model is developed by evaluating the support, performanc
Jan 1, 1988
-
Time Dependent Strength Of Coal Strata For Long-Term Pillar Stability
By Z. T. Bieniawski
A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest
Jan 1, 1994
-
Modelling Of Pillar Stability In Room And Pillar Mines
By Douglas Morrison
By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o
Jan 1, 2003
-
New Approach to Evaluate the Stability of Yield Pillars
By Khaled Morsy
In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica
Jan 1, 2003
-
Shear Bond Characteristics in Grouted Cable Bolts
By Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Transversely Elasto-Plastic Analysis of Surface Subsidence Arising from Longwall Mining of Inclined Coal Seams
By M. Afsari Nejad
A Transversely Elasto-Plastic Model was configured in FLAC (Fact Lagrangian Analysis of Continua) as a more realistic simulation of stratified and inclined strata behaviour examining surface subsidenc
Jan 1, 1998
-
3D FEM Simulation For Fully Grouted Bolts
By Khaled Morsy
Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh
Jan 1, 2004