Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Support selection of mine roadways by means of a computer program

    By Erdal Ünal

    The computer program introduced in this paper is based on design guidelines developed for selection of support systems used in mine roadways. The support types considered include rock bolts as well as

    Jan 1, 1989

  • SME-ICGCM
    A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application

    By Deren Zhu

    Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by

    Jan 1, 1989

  • SME-ICGCM
    CISPM - A subsidence prediction model

    By Y. Luo

    A PC based computer model has been developed by the authors for predicting the surface subsidence due to underground coal mining. Its reliability, comprehensiveness and user friendliness demonstrate t

    Jan 1, 1989

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • SME-ICGCM
    DEPOWS - A Powered Support Selection Model

    By Y. M. Jiang

    A users friendly PC Computer Program has been developed to implement a systematic design of the powered support. The required input data are: (1) thickness, RQD, and compressive strength of the immedi

    Jan 1, 1989

  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME-ICGCM
    The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian Coalfield

    By John A. Owsiany

    The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid

    Jan 1, 2001

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United State

    By Yoginder P. Chugh

    Subsidence may be observed above partial extraction shallow room-and-pillar mines where the coal seam(s) is associated with weak and thick claystone in the floor. This paper presents results of subsid

    Jan 1, 1989

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME-ICGCM
    Direct Laboratory Tensile Testing Of Select Yielding Rock Bolt Systems

    By John D. VandeKraats

    Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling

    Jan 1, 1996

  • SME-ICGCM
    Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PC

    By D. A. Donato

    It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi

    Jan 1, 1996

  • SME-ICGCM
    In-Situ Performance Analysis Of Immediate Forward Support (IFS) Systems In Thin-Medium Seam Sections In The United Kingdom

    By Paul N. Freeman

    This paper describes the in-situ performance of two IFS powered support installations at Betws and Penallta Collieries in the South Wales Coalfield, United Kingdom. Intensive monitoring of all powe

    Jan 1, 1992

  • SME-ICGCM
    A Pipeliner's Perspective on Longwall Mining

    By Robert B. Francini

    Longwall mining and pipelines have coexisted since longwall mining was introduced into the United States. How the pipeline operator reacts to longwall mining under their line depends on many factors.

    Jan 1, 2011

  • SME-ICGCM
    Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, Utah

    By J. R. Koehler

    Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie

    Jan 1, 1996

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    Analysis Of Entry Roof Failure And Falls At Springvale Colliery

    By Wm. Mark Hart

    High horizontal stresses and shear failure have been considered the major reasons that cause entry roof failure and falls for underground mining. Therefore, reorientation of the current mining systems

    Jan 1, 1996

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • SME-ICGCM
    Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois

    By G. C. Marino

    The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e

    Jan 1, 1990

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995