Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geology And Mineralization Of The Jones Hill Massive Sulfide Prospect, Santa Fe County, New MexicoBy Ward Sumner
The Jones Hill prospect is a Proterozoic age, volcanogenic, semi-massive to massive sulfide deposit. The deposit is located on the western edge of the Pecos greenstone belt in the southern Sangre de C
Jan 1, 2013
-
Renovation of the Inland SystemBy Thomas P. Kwiatkowski, Len Cobb, Christopher D. Orlandi, Judith H. Jones
The Inland System supplies raw water to the industrial and domestic users in the City of Birmingham, Alabama. The Inland System, which is nearly 60 years old, consists of an approximately 57.9m (190
Jan 1, 1997
-
Mining at the lowest cost per ton: Innovations for large shovelsBy William Gleason
With its 2011 acquisition of rival equipment company Bucyrus International, Caterpillar added underground mining and large shovels to its line of products and further solidified its standing as the le
Dec 1, 2013
-
Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022By Justin Kolster, Donald Benjamin, Kyle White
Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re
Dec 1, 2022
-
Mini Symposium ? Quality Assurance - A Casting Supplier's View - IntroductionBy Robert C. Maxton
The foundry industry is a basic source of structural component for all industry. Millions of tons of castings are produced annually in both ferrous and nonferrous alloys. These castings are subjected
Jan 1, 1982
-
Use Of Scientific Systems For Developing Surface MinesBy Khosrow Badiozamani
Depletion of easily accessible coal reserves and stringent competition in coal marketing has led to the coal industries' need to more accurately assess alternate development scenarios and to deve
Jan 1, 1985
-
Electrochemical Processing Of Ocean Manganese Nodules With Microbial Enhancement To Recover Valuable MetalsBy K. A. Natarajan, Abha Kumari
In this paper, electroleaching and electrobioleaching of ocean manganese nodules are discussed along with the role of galvanic interactions in bioleaching. Polarization studies using a manganese nodul
Jan 1, 2003
-
Methods To Increase The Gas Penetration In Sinter LayerBy Werner Wenzel
Methods to increase the gas penetration through sinter layers. In the field of agglomeration, sintering has gained importance, specially in Europe; in Best-Europe this trend will continue till th
Jan 1, 1971
-
An Official Approach To Investment In Argentine Mining Sector - The Gold Case -By Juan Eduardo Barrera
SUNNARY AND CONCLUSIONS Argentina presents to the foreign and local investors a mineral wealth that is largely unexplored, untested, underdeveloped and therefore incompletely evaluated. In vie
Jan 1, 1988
-
Wireless Technology Offers Mining Operations ImprovementsBy Ed Schodowski
Wireless technology is a hot topic for anyone involved in the design, operation, maintenance or upgrading of mines or mineral processing plants because wireless technologies overcome barriers that hav
Jan 1, 2009
-
A Computer System For Metallurgical Plant Optimisation - IntroductionBy S. Kesler
Rössing Uranium Limited has operated since 1976 a large open pit uranium mine and extraction plant at a remote site in the Namib desert, South West Africa/Namibia. The geology (Berning, I., et al. Eco
Jan 1, 1986
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
Natural Ventilation Pressure In A Deep Salt Mine - A Case StudyBy J. R. Stoltz, E. Thompson, S. Pattee
On May 15 and 16, 1999, a mine ventilation survey was performed in the 705-m- (2,312-ft-) deep Cayuga Mine, Cargill Salt Division, Lansing, NY. The purpose of the survey was to develop a numerical mod
Jan 1, 2003
-
The Antler Chlorite Mine, Southwestern Montana: Rediscovery, Geology, And ClosureBy Richard B. Berg
Until its closure in 1999, the Antler was North America's only active chlorite mine. The mine is located 25 miles (40 km) southeast of Butte in the Silver Star district - an old Montana gold mini
Jan 1, 2001
-
Secondary Lead Recovery from Spent SLI BatteriesBy J. E. Hoffman, T. J. Keefe, Michael E. Stout, O&apos
M.A. Industries, Inc. has developed and is now offering on a commercially available basis, complete systems to recover and recycle lead from spent SLI batteries. The system begins with the breaking an
Jan 1, 1993
-
Improving Reliability, Cost & Safety with Fluid Power SystemsBy T. R. Ley
"RELIABILITY & SAFETY – TOGETHER. REALLY? I was starkly reminded of the challenges facing by the coal industry while talking with a number of senior mining executives. One said to me: “Safety is the #
Jan 1, 2016
-
Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick
The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept
Dec 1, 2022
-
Meeting Environmental Requirements for New Tunnels in Washington, D.C.By Brian H. Zelenko, Patricia M. Perry
INTRODUCTION The environmental requirements of the next section of Washington, D.C. METRO subway tunnels present unique challenges to the Contractor. The 14th Street Tunnels contract includes twin
Jan 1, 1995
-
Well integrity testing system for in situ leach mining wellsBy J. K. Ahlness
The US Bureau of Mines investigated technologies for determining the integrity of in situ leach mining wells. A self-contained trailer-mounted well integrity testing system (WITS) was designed and bui
Jan 1, 1988
-
Tunnels - The Owners' ProblemsBy T. J. Jr. Corwin
This paper will cover the problems confronting an owner when planning and estimating the cost of a proposed tunnel. Three factors are known: the length, size and the time allocated for the completion
Jan 1, 1974