Estimating mine planning software utilization for decision-making strategies in the South African gold mining sectorBy T. Celik, B. Genc, C. Musingwini
"This paper discusses a new methodology for defining and measuring mine planning software utilization in the South African gold mining sector within an evolving data-set framework. An initial data-set
Jan 1, 2015
-
Cansolv® SO2 Scrubbing System: Review Of Commercial Applications For Smelter SO2 Emissions ControlBy Valérie Léveillé
As new legislation drives to lower SO2 emissions from metallurgical plants, plant managers face the challenge of keeping their costs under control. The Cansolv® SO2 Scrubbing System has been broadly a
Jan 1, 2009
-
The Influence of Niobium Content on Austenite Grain Growth in Microalloyed SteelsBy C. W. Siyasiya, K. A. Annan, W. E. Stumpf
"SynopsisThe relationship between niobium content and austenite grain growth has been investigated through hot rolling simulation on a Bähr dilatometer. The effect of delay time between passes during
Jan 1, 2015
-
The grate-kiln induration machine - history, advantages, and drawbacks, and outline for the futureBy J. C. Ion, O. Isaksson, J. Stjernberg
Iron ore pellets are a preferred feedstock for ironmaking. One method used for pelletizing is the grate-kiln process, first established in 1960.During the past decade, the establishment of new grate-k
Jan 1, 2015
-
Electrometallurgical Relationships In Electric Smelting FurnacesBy J. Persson, N. G. Bliss
Electric furnaces used for smelting and those used for scrap melting exhibit different performance profiles in terms of electrical characteristics. However, the underlying principles are the same f
Jan 1, 2004
-
Low-Cement Chrome-Oxide-Free Castable For Use In Ironmaking Rotary KilnsBy D. Tsweleng
In the Evraz Highveld production process, iron ore is prereduced in rotary kilns prior to charging into submerged arc furnaces (SAFs). Owing to the highly aggressive slags that are formed within the c
Aug 1, 2013
-
Analysis of the Dispersion Variance Using Geostatistical Simulation and Blending PilesThe additive property of dispersion variances was found experimentally by D.G. Krige using data from the gold deposits of the Witwatersrand. In this property, called ?Krige?s relationship?, the disper
Jan 1, 2014
-
Seismology And Slope Stability In Open Pit MinesBy R A. Lynch, D A. Malovichko
The implementation of routine real-time micro-seismic monitoring of open pit mine slopes has been discussed. Some examples of seismic arrays have been given, and a recommendation of suitable seismic
Jan 1, 2006
-
Development Of A Process For Dephosphorisation Of High Carbon FerromanganeseBy R. P. Goel, P. N. Chaudhary, R. K. Minj
The bulk of high carbon ferromanganese produced in India continue to have more than 0.35% phosphorus since they are produced by carbothermic reduction process. The low phosphorus manganese ores are de
Jan 1, 2007
-
Mine seismicity: prediction or forecasting? - SynopsisBy S. M. Spottiswoode
Much as one hopes to predict whether damaging seismicity might occur somewhere in the next shift, this is not possible at present. Recently, an analysis of seismicity at two mines has shown that a sma
Jan 1, 2010
-
Engineering application of thrust block analysis in slope stability problems in open pit mines - SynopsisBy K. N. Karparov
The classical limit equilibrium methods are suspected to be ineffective in predicting the potential for highwall failure in many instances in coal mines around the world. Slope engineers have for many
Jan 1, 2009
-
Prediction Of Pressures Losses In Straight-Through Diaphragm Valves - NomenclatureBy V. G. Pienaar, B. M. Mbiya, P. T. Slatter
[a constant b constant cc onstant c' constant D pipe diameter (m) Dshear shear diameter (m) E error function fth theoretical friction factor F function F' function K fluid consiste
Jan 1, 2007
-
Crush pillar support - designing for controlled pillar failureBy M. du Plessis, D. F. Malan
"The aim of any mine design is to ensure that the excavations remain stable for the period they will be in use. Various pillar systems are used to ensure that underground stopes remain stable and that
Jan 1, 2015
-
The Use Of Titanium Hydride In Blending And Mechanical Alloying Of Ti-Al Alloys - SynopsisBy I. A. Mwamba
Titanium sponge, which is almost pure titanium, is extremely ductile and not easily processed into titanium powder. One method of producing powder is the hydride-dehydride (HDH) process, where titaniu
Jan 1, 2011
-
The Road To NPV+By R. Hummel
When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with
Jan 1, 2001
-
Witwatersrand Gold Reef Evaluation: The ?Variancegram? ToolBy C. Lemmer
The resolution with which the different categories of resources are forecast for Witwatersrand gold reefs should ideally tie in with block sizes that are optimal in terms of the variability structures
Jan 1, 2014
-
Air drying of fine coal in a fluidized bedBy E. S. Peters, M. J. van Rensburg, M. Le Roux, Q. P. Campbell
"The demand for energy has continued to rise worldwide in line with population growth. The majority of South Africa’s electricity is supplied by coal-fired power stations. The amount of fine coal (-2
Jan 1, 2015
-
Investigation of stress in an earthmover bucket using finite element analysis: a generic model for draglinesBy N. Demirel, O. Gölbasi
Draglines are massive machines extensively utilized in opencast mines for overburden stripping. The demanding working environment induces fractures, wear and tear, and fatigue failures in dragline com
Jan 1, 2015
-
Surface Tension Of Cu-O Alloys At 1400 KBy C. Nexhip, S. Sun
Critical to understanding and controlling phase mixing and separation in metallurgical processes, is the development of reliable experimental techniques to measure interfacial properties of melt syste
Jan 1, 2004
-
The Rehabilitation Of Impala No. 1 A Ventilation Shaft - IntroductionBy A. Bothma
The Impala No. 1A ventilation shaft is located approximately 15 kms north of Rustenburg and is accessed via the R510road from Rustenburg to Northam/Thabazimbi. This situation is shown on the location
Jan 1, 2001