Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Anfo Versus 100% Emulsion: Quantitative Assessment of Performance With Constant Drilling and Blasting CostsBy Neal Lee, Braden Lusk, John Silva Castro
One of the most common assumptions regarding the use of ANFO versus utilizing 100% sensitized emulsion is that ANFO “turns over” the muck-pile better, due to the “higher gas volume” supposedly inheren
Jan 1, 2012
-
Status of International Standards on BlastingBy Gerald R. Coonan
I'm really here to talk about my pet subject of government relations. I've been in Peabody's Environmental Quality Department, working on regulations, for over five years, and I have seen a number of
Jan 1, 1980
-
Underground Airblast Monitoring for Blast Performance Diagnosis and Detailed Attenuation ModellingBy Jon Hurt, Brent Meins, David Vardiman
"Two test blasts were conducted at the Sanford Underground Research Facility to establish optimum blast designs and to limit blast effects on existing research rooms and equipment in preparation for t
Jan 1, 2017
-
Modelling Complex Shock Tunnel for Shock Interaction and Transfer TestingBy Catherine Johnson, Barbara Rutter
The shock tunnel located at the Missouri University of Science and Technology Experimental Mine is 65 feet 9 inches (20.0406 m) in length. The tests performed inside of this tunnel are either arena te
Jan 1, 2018
-
The Application of Ammonium Nitrate as an Improvised Explosive PrecursorBy Kirk Yeager
During the last several years the FBI has been involved with a detailed study of explosives designed to replicate formulations utilized world-wide by terrorists. In addition, numerous formulations , b
Jan 1, 2001
-
Blast Control for the Hydroelectric Project "El Cajón" in the State of Nayarit in MexicoBy David Yanez
The hydroelectric project "El Cajón" is currently under construction in the state of Nayarit, on the Santiago River, in western Mexico. This project is comprised of a Concrete Face Rockfill Dam (CFRD)
Jan 1, 2006
-
Blasting Specifications and Guidelines for Protective and High-Profile BlastingBy Brian Lewis, Reinhold Daykin Schnell
Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger
Feb 6, 2023
-
Blasting Optimization Strategies for Enhanced Productivity at Mont-Wright MineBy Joe Atalla, Jesse Desrochers, Rodrigo Hayashida, Joseph Mukendi Kabuya
The Mont-Wright mine stands as a prominent open-pit operation in Canada, renowned for its vast iron-ore reserves. However, the efficacy of its blasting operations, crucial for efficient production, ha
Jan 21, 2025
-
Borehole Deviation Study in a Long-Hole StopeBy Paul Miller, Rene Laprade
Does a 76 mm Ø hole drilled over 45 m deep remain straight? This is the question asked by the Engineering department at Placer Dome's Dome Mine in Timmins, Ontario before they could lay out the initia
Jan 1, 1998
-
Cumberland Gap Tunnels; Controlled Excavation With Complex GeologyBy Tom Short
The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V
Jan 1, 1993
-
Burden and Spacing Effect on Underground Limestone Fragmentation using Quantitative 3D ModelingBy Mark Spaniel
Computer 3D modeling to evaluate the potential underground blasting fragmentation performance based on rock within calculated damage radii along drillholes, as well as the burden distance from explosi
Feb 1, 2020
-
Trial Study--Self Consuming Detonators to Reduce Ore ContaminationBy Kurt B. Oakes, Brian M. Fortelka
Unimin Corporation operates an underground Silica Sand mine at Guion, AR located in North Central Arkansas. The Silica Sand deposit at Guion is part of the St. Peter Sandstone Formation, which is over
Jan 1, 1999
-
Lessons Learned from Blasting in Highly Weathered SandstoneBy Tyler Rockley, Greg Bailey
This paper is an engineering case study of a blast performed on a highly weathered sandstone isthmus in an area sensitive to vibration and airblast, the challenges associated with such a blast, the me
-
Instrumentation for Blast Monitoring in Underground MinesBy Francis Otuonye
Rock fragmentation by blasting still remains the most common and cost-effective method of excavating hard rock in mining and tunneling operations. During blasting, the dynamic stresses induced by the
Jan 1, 1992
-
Gas and Dust Explosion Research at the UKERT LabBy Jaco van den Berg, Dr. Todor Petrov, Dr. Josh Calnan, Dr. Jhon Silva
This paper shows and reviews the similitudes and differences in explosions generated by high explosives and gas explosions, the reasons why gas explosions are difficult to replicate using high explosi
Feb 1, 2020
-
Factors Affecting Anfo Fumes ProductionBy Richard Mainiero, James H. Rowland III
For many years there have been small scale tests available for evaluating the toxic fumes production by capsensitive explosives (DOT Class 1. l), but these could not be used with blasting agents due t
Jan 1, 2000
-
An Energy Equality Approach to BlastingBy Daniel Scott
Mines have used explosives for economical fragmentation for many years. It can therefore be expected that the mining industry has thoroughly researched how to achieve the most efficient blast. However
Jan 1, 2012
-
Deltadet System from Delta CapBy Kevin Dunfield
The Deltadet System is composed of: The Deltadet II electronic Detonator. A Field Terminal to create, modify or simply execute an existing blasting sequence. The radio remote controlled option is comp
Jan 1, 2004
-
A New Way of Looking at Risk and QD ComplianceBy Lon Santis, Michael Swisdak, John Tatom
The Institute of Makers of Explosives (IME) and A-P-T Research, Inc. (APT) have developed a quantitative risk assessment tool called IMESAFR (IME Safety Analysis for Risk) for managing risk from vario
Jan 1, 2013
-
Non-Electric Sequential Blasting for Open Pit Mining ApplicationBy C A. "Hawk" Hanger
"The paper that will be presented is an in-depth study of sequential blasting using standardnon-electric shock tube down hole timing along with surface M.S. connector timing.Included also will be a di
Jan 1, 1993