Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Computer-Aided Design & High-Precision Systems in Drilling & Blasting

    By William Wilkinson, Vladisla Kecojevic

    Current three-dimensional (3D) computer design technology leveraged into drill and blast planning and operations is changing the way engineers and operations approach drill and blast design. Additiona

    Jan 1, 2004

  • ISEE
    Running a Drill Program that Supports the Mission of Blasting

    By William D. Hissem

    While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.

    Jan 1, 1997

  • ISEE
    Challenges for Mining Explosion Identification Under a Comprehensive Test Ban Treaty

    By Brian W. Stump

    Seismic networks provide the primary technology for monitoring compliance with a comprehensive test ban treaty. The design goal of the network is the identification of possible clandestine explosions

    Jan 1, 1995

  • ISEE
    Instruments and Available Internet-Based Data for Documenting Weather Conditions

    By Donna Kliche, Charles Kliche

    It has been previously documented that various weather conditions such as wind direction and speed, cloud cover and, especially, temperature inversions can significantly affect the overpressure genera

    Jan 1, 2011

  • ISEE
    Security and Control (476c288e-1831-4c21-a747-ee41961667e9)

    By Jim Mikelait

    Overview ?? Why do we need security? ?? Needs assessment ?? Elements to any security system ?? Protect, Detect, Alert, esponse ?? Electronic Security System Criteria ?? Advantages and Limitations of

    Jan 1, 2006

  • ISEE
    Response of Manufactured Houses to Blast Vibrations

    By Michael Mann

    Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl

    Jan 1, 2000

  • ISEE
    The Construction and Testing of a Polycarbonate Safe Haven Wall

    By Braden T. Lusk, Rex A. Meyr, Kyle A. Perry

    Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by MSHA and required every underground coal mine to install refuge alternatives to help prevent future fatalities of t

    Jan 1, 2014

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • ISEE
    Overburden Blast Cast Designs, Factors Affecting Results and Economics

    By Connie Postupack

    The purpose of the workshop is to show the effect of various blasting factors on the overall results.

    Jan 1, 1994

  • ISEE
    Improving Safety of Drill Steel Diameter Changes on Rotary Drills

    By Zach Ellis, Dusty Fisher

    The Office of Surface Mining, Reclamation, and Enforcement (OSM) cited a large surface coal mine for a series of flyrock incidents that occurred when blasting close to the mining lease perimeter. The

    Jan 1, 2015

  • ISEE
    Computer and Centrifuge Modeling of Decoupled Explosions in Civilian Tunnels

    By Neil T. Davie, Thomas K. Blanchat, Thomas C. Togami, Joe R. Weatherby, Dale S. Preece, Robert A. Benham, James J. Calderone

    "Geotechnical structures ,such as underground bunkers, tunnels, and building foundations aresubjected to stress fields produced by..the gravity load on the structure and/or any overlyingstrata. These

    Jan 1, 1998

  • ISEE
    Concepts and Case Study for Regular Rhythmic Timing and Sequence

    By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks

    "Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw

    Jan 1, 2016

  • ISEE
    The Safety of Explosives Handling and Blasting in the Mining Industry

    By Kerina Taylor

    Due to their high amount of stored energy, explosives have been the cause of many serious injuries and fatalities over the last centuries. Despite safety advances and awareness in the last decades, in

    Jan 1, 2011

  • ISEE
    Mine Blasting Safety: Decades of Progress

    By Harry Verakis, Thomas Lobb

    Blasting accident data over a 30-year period (1980-2010) are summarized and presented for all types of surface and underground mining operations in the USA. The historical record of injuries from blas

    Jan 1, 2012

  • ISEE
    Methods to Quantify Drilling Accuracy

    By Tristan Worsey, Nathan Rouse, Kyle Hall

    Drilling accuracy is the foundation to any successful blast operation. Even the best blasting practices cannot overcome poor drilling and still obtain desired results. Inaccuracies in boreholes can re

    Jan 1, 2018

  • ISEE
    Impact-Induced Fragmentation of Rock and Size Distribution Analysis

    By Bibhu Mohanty, Sheng Huang

    Accurate measure of fragment size distribution is a key objective in all blasting and crushing operations. Several generic distribution functions have been devised to describe the degree of fragmentat

    Jan 1, 2016

  • ISEE
    It Felt like an Earthquake

    By David Ziegler, John Babcock, Gregory Poole

    On December 9, 2003 at 3:59 PM EST an earthquake with a 4.5 magnitude occurred in central Virginia. According to a survey on the US Geological Survey website, this quake was felt as far away as Bridge

    Jan 1, 2005

  • ISEE
    Small Scale Testing to Investigate Air Blast Loading on Plates

    By H Ulrich Leiste, Leslie Talor

    This paper describes a series of small scale tests conducted to investigate the loading applied to a flat plate by the detonation of a cylindrical charge very close (between two and three charge radii

    Jan 1, 2009

  • ISEE
    The Mechanisms of Rock Damage in Blasthole Open Stope Mining: Blast Induced Versus Stress Induced

    By Qian (Ken) Liu, Remi Proulx

    A large scale blast damage project was carried out over the past two years at INCO Ltd Manitoba Division co-funded by the Canada/Manitoba Mineral Development Agreement. The experiment was conducted at

    Jan 1, 1995

  • ISEE
    Field Application of Destructive Wave Interference

    By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Scott Crabtree, Randy Wheeler

    Theoretical description of destructive wave interference and the use of sacrifi cial holes is included and is supported by data collected at Springfi eld Underground. Finally, the process by which the

    Jan 1, 2008