Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Statistical Methods Applied to the Analysis of Blasting Vibrations in a Diabase Quarry in the City of Campinas, (SP) - BrazilBy Milton Barbosa Landim, Denise de La Corte Bacci
Statistical methods of multiple regression analysis, trend surface analysis and principal components analysis were applied to seismographic data recorded during production blasting at a diabase quarry
Jan 1, 2002
-
Presplit Design Based on Borehole PressuresBy Dr. Calvin J. Konya, Anthony Konya
Beginning on the Niagara Power Project, presplitting became a widely used blasting technique to obtain smooth walls in mining and construction projects reducing scaling, creating more stable pits, all
-
Presplit Design Based on Borehole PressuresBy Anthony Konya, Calvin J. Konya
This paper will present this research which correlates the borehole pressure to variables such as the Young's Modulus and Tensile Strength of various rock types giving blast designers the ability to d
Feb 1, 2020
-
Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal MineBy Ajoy Singh
A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex
Jan 1, 2012
-
Vibration Data Analysis to Optimize the Blast Design and Improve Shovel ProductivityBy Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira
The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a
-
Vibration Data Analysis to Optimize the Blast Design and Improve Shovel ProductivityBy Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira
The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a
Feb 1, 2020
-
Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage BuildingBy M V. Van Bers, A L. McAnuff, A Curic
During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca
Jan 1, 1999
-
Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical SimulationBy A. Vishwakarma, V. Himanshu, K. Dey
Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method
Jan 1, 2024
-
Comparison of International Vibration Standards for Quarry Blasting Close-in to a Residential StructureBy Johan Gjødvad, Catherine Aimone-Martin, Charles Dowding, Mathias Jern
A residential structure adjacent to a quarry in Ohio was instrumented to record structure motions, resulting wall strains and existing crack displacements in response to close-in blasting within 82 m
Jan 21, 2025
-
JKVBOC Blast Movement Model Applications for Ore Control at Open Pit MinesBy Constanza Bujes, Mark Jones, Graham Crook, Yansan Jamyanbaatar, Sedat Esen
Tracking ore characteristics such as grade and hardness from its original position into the material handling and processing stages remains one of the key challenges in open pit mining of hard rock de
-
Vibration Control at Long HarbourBy Michael Burrell
This project involved the protection of an historic landfill located on the site. Construction blasting was for a permanent access road to carry traffic to and from a new metal processing plant being
Jan 1, 2012
-
Tunneling in Thinly Foliated Rockmass ConditionsBy G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
-
Non-Electric Shock Tube and Optimizer Initiation Systems, Applications and HookupsBy Tom Treleaven
This guide presents numerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide quick reference by number of decks or bunch
Jan 1, 1997
-
The Effects of Various Wet-Hole Loading Methods on Powder FactorBy Neal Lee
Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,
Jan 1, 2011
-
Fewer Surprises When You Measure the SizesBy Tom C. Palangio
Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co
Jan 1, 2016
-
Burden Profiling: Do You Measure What You Think You Do?By Greg Shapiro, Paul Dr. Worsey
Mining, quarry, and construction blasts are becoming more and more dependent on bench profiling. The use of accurate profiling gives the blaster better data for the most efficient blast results. So,
Jan 1, 2019
-
Demolition of Churchill House in Belfast, IrelandBy Dick Green
During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of
Jan 1, 2006
-
Comparison of Compliance Measures for Blasting near an Industrial Structure Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part IIIBy C. Aimone-Martin, C. Dowding, M. Jern, J. Gjødvad
This article compares percentages of compliance for six national standards to demonstrate how these standards vary on-site in a real project. This, to the best of the authors' knowledge, has not been
Jan 1, 2024
-
A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves
The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t
Jan 21, 2025