Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Bridge Demolition without Disruption of Railroad Traffic: A Case StudyBy Calvin Konya, Janos Foldesi
A bridge over a main line railroad system was scheduled for demolition. The bridge was made of reinforced concrete and spanned three mainline railroad tracks which could not be shut down due to blasti
Jan 1, 1992
-
Daveytronic Digital Blasting SystemBy Advanced Initiation Systems Inc
10 years in R&D Last 5 years available commercially Worldwide Met strict approvals for manufacturing and use
Jan 1, 2004
-
The Effects of Rock Mass Characteristics on Fragmentation in Controlled Blasting Experiments in Small Development HeadingsBy Chantale Doucet, Yves Lizotte, Alan Cameron
A joint Federal Government-Industry research project on the effect of geology on the fragmentation of rock excavated by blasting in underground developments was conducted at the CANMET Experimental Mi
Jan 1, 1996
-
Laboratory Study of Cracking in Model Block Masonry WallsBy Jeffrey N. Deisher, H Y. Fang, Richard P. Scheller, Robert M. Koerner
The need to adequately quantify cracking in structures in the vicinity of blasting activity becomes more important each year. This urgency comes about through a growing number of complaints and lawsui
Jan 1, 1977
-
Blasting Design and High-Energy Explosive Strategies to Achieve Fines Targets for Mill PerformanceBy Jorge Cardenas, Diego Sanchez
Maximizing SAG mill throughput and metallurgical recovery in hard rock operations requires achieving target fragmentation, particularly a sufficient proportion of fines (<25.4 mm). These fines thresho
Jan 26, 2026
-
Advanced Analysis of Airblast and Vibration Signals for Optimizing Blast DesignBy Frank Sames
Blast vibration and airblast overpressure signals are generally rated and compared only by their maximum amplitude and the principal frequency associated with the peak pulse. The scaled distance conce
Jan 1, 1997
-
South African Blasting Practice in Shaft SinkingBy Rodney C. Espley-Jones, John C. B Wilson
South Africa is well known for its shaft sinking exploits, and many of the world's biggest and deepest shafts are to be found there. Blasting practice differs in a number of respects from that followe
Jan 1, 1979
-
Geomechanical differentiation of cratering mechanisms with two degrees of freedom and burden dependency investigated through single hole blast tests.By J. D. Aubertin
Rock blasting is a complex engineering process that requires in-depth knowledge of operations and geomechanical conditions. Acknowledged design precepts are based on cratering behavior associated with
Jan 1, 2024
-
Bulk Loading of Emulsion Explosives in Shaft SinkingBy R J. Roach, D Roy
After months of discussion on ways and means to improve productivity in the shaft sinking process, it was decided to look at those areas where, historically, methods have been stagnant for many years.
Jan 1, 1997
-
Blasting 250 Feet from a Historic StructureA case history is presented where a variance was permitted by the court to change a 500 foot limit to 250 feet for blasting overburden at a surface coal mine in the proximity of a historic structure.
Jan 1, 1991
-
Using Uniformly-Sequenced MS Delay Periods To Reduce Vibration from Quarry BlastingBy A B. Jr Nunn, W C. Gould
Good community relations is a major concern at this central Virginia aggregate quarry. In this paper, the authors describe the use of a new electric millisecond delay initiation system that has reduce
Jan 1, 1986
-
The Waiting Time Recovery TestBy John T. Aler
The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified
Jan 1, 1991
-
Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill &Blast Engineering Focused ProjectsBy Manuel Calderón
Chile is responsible for 30% of the global copper production; the world ́s largest. However, significant challenges are faced in this industry; declining grades (1.13% in 2002 to 0.61% in 2015), high
-
A Novel Initiating System for Blasting ExplosivesBy R Fox, R Watt
On behalf of ICI's group of explosives companies around the world, a research programme is being undertaken to develop a new electrical shotfiring system which will have markedly improved safety featu
Jan 1, 1981
-
Reduction of Air Blast and FlyrockBy Don Rapp, Rufus Flinchum
Air blast and flyrock are two of the most critical concerns facing the blaster of today. This paper will provide the blaster with proven procedures for recognizing open face and bench surface problems
Jan 1, 1993
-
The Optimum DelayBy J Foklesi, G Bohus, D Benedek
The breakage process in blasting takes place in space and in time and the latter will determine the degree of fragmentation, shape of the muckpile and the extent of displacement. The shock wave travel
Jan 1, 1986
-
Improved Techniques for Reactive Ground, Density and Performance Testing of Bulk ExplosivesBy Italo Onederra, Gary Cavanough, Ewan Sellers
Reactivity of ammonium nitrate based explosives is associated with the presence of iron sulfides in the ground reacting with explosive products and in some instances causing spontaneous reactions whic
Jan 1, 2018
-
Journal: 19th Annual Photo and Art Contest - Honorable Mention "Bear Lake Hydro Project"By Corry Goumans
The job location is at Bear Lake Hydro Project located north of the town of Sechelt, British Columbia, Canada
Jan 1, 2013
-
Rock Mass Identification Prior To Blasting: Reasons And MethodBy Anne Charline Sauvage
Blast designers and blasters need to know the rock mass influence on blast to increase explosive effi-ciency and to optimize costs, but also to succeed in limiting blast emissions (vibration, overpres
Jan 1, 2013
-
Environmental Effects of Marine Blasting in Canadian Game RiversBy A Lance McAnuff, Marcus V. van Bers, Andrew Curic
During the summers of 1992 and 1993, blasting operations were carried out to effect the crossing of two of Canada's better known game rivers, the Nipigon and Winnipeg, in connection with the completio
Jan 1, 1994