Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Influence Of Freeze–Thaw Cycles On Strength And Heavy Mental Leaching Performance Of Petroleum Drilling Mud Stabilized By Waste

    By Tian Miaomiao, Cheng Yin, Shen Jun, Yu Hao, Li Yafei

    Vast amounts of waste drilling mud containing heavy metals is produced during oil drilling process, which causes great pollution to the environment. Therefore, it needs to be treated until it is harml

    Nov 1, 2022

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case Study

    By Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu

    Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi

    Nov 1, 2022

  • DFI
    Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project

    By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews

    "The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re

    Jan 1, 2016

  • DFI
    New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure Foundations

    By Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer

    Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct

    Sep 8, 2021

  • DFI
    Sustainability Considerations in Deep Mixing Applications, With Examples from LPV 111 in New Orleans, LA

    By Craig M. Shillaber, Joseph E. Dove, James K. Mitchell

    "This paper addresses two primary factors affecting the sustainability of Deep Mixing Methods (DMMs): construction materials and handling of the spoil from wet mixing methods. We examine these factors

    Jan 1, 2015

  • DFI
    Controlling Thermal Stresses in Barrier Walls

    By Karsten Beckhaus

    Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee

    Sep 8, 2021

  • DFI
    Integrity Testing of Drilled Displacement Piles at a Major Campus

    By Mark D. Fuhriman, Parham Khoshkbari, Robert Fosse

    Drilled displacement piles are becoming an increasingly common deep foundation choice for their relatively simple installation methods, applicability to a wide range of subsurface conditions, and vers

    Sep 8, 2021

  • DFI
    Execution of Pile Installation in Environmentally Challenging Sites

    By Dena Morgan, Emre Biringen

    "Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t

    Jan 1, 2014

  • DFI
    Sharing of Lateral Loads and Moments in Pile Foundations

    By Andrea Gambi, Giancarlo Olivucci, Maurizio Lenzi

    "In the paper a criterion for the evaluation of the sharing of the lateral loads in a piled foundation is presented. It relies on the the compatibility condition between the rotation of the rigid pile

    Jan 1, 2005

  • DFI
    2022 OPA Winner: Mosul Dam Rehabilitation Project

    By Raffaella Granta

    Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo

    Oct 1, 2022

  • DFI
    Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building

    By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros

    "This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p

    Jan 1, 2016

  • DFI
    Discussion of Differences in Design Methodology between Granular and Grouted Inclusions

    By Brandon Buschmeier, Frederic Masse

    "Inclusions are a type of ground improvement that provide an improvement of a soil mass by insertion of a material with better characteristics than the surrounding soils. There are primarily two types

    Jan 1, 2015

  • DFI
    New Findings on the Capacity of Connections between Micropiles and Existing Footings

    By João Veludo, Eduardo Júlio, Helen D. Robinson, Jesús E. Gómez

    "Utilization of micropiles for structural retrofit requires connection of the micropiles to the footings of the existing structure. Almost ten years ago, an experimental research effort was carried ou

    Jan 1, 2015

  • DFI
    Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li

    "Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu

    Jan 1, 2015

  • DFI
    Mobilizing CIDH Pile Base Resistance on the Gerald Desmond Bridge Replacement Project with Tip Grouting

    By Adam Zagorski, Rusty Lucido, Curt Scheyhing

    "The current California Department of Transportation (Caltrans) practice based on AASHTO LRFD Bridge Design Specifications is to use the O’Neill and Reese method (FHWA, 1999) for calculating the side

    Jan 1, 2017

  • DFI
    130 M Deep Bored Piles – A New Superlative

    By Vijay Kumar, Serhat Baycan, Karsten Beckhans

    For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep

    Nov 1, 2022

  • DFI
    Laboratory Mixing and Testing for Controlled Waste Disposal Site

    By Tomohiro Yamasaki

    "At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand

    Jan 1, 2015

  • DFI
    Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale Effects

    By Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami

    "Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha

    Jan 1, 2015

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f

    Jan 1, 2013

  • DFI
    Site Specific Study for Foundation Design of Iswar Gupta Bridge

    By Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath

    "Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig

    Jan 1, 2015