Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance
By Gustavo Armijo
Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha
Jan 1, 2006
-
Behavior Of PCC Pile Under Lateral Load
By Zhitao Ma
The Cast-in-place Concrete thin-wall Pipe pile, referred to as PCC pile, is a new kind of pile for soft ground improvement. In this paper, firstly, the general introductions of the new pile technique,
Jan 1, 2006
-
Ultimate Uplift Capacity Of Piles And Pile Groups In Granular Soil
By B. M. Das
Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,
Jan 1, 1989
-
Ultimate Uplift Capacity Of Single And Group Piles In Clay ? Synopsis
By B. M. Das
Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes
Jan 1, 2010
-
Lower Risks With ECR®/EFT®-Measurements In Underground Constructions
By Patrick P. A. Wolfs
In the summer of 2000, the ECR®/EFT® was first introduced in the Netherlands. After the first project a field test was performed together with other geophysical methods to prove the liability of these
Jan 1, 2006
-
Resistance Factors For Lateral Design Of Drilled Shafts Supporting Sound Walls
By Ke Yang
Drilled shafts are widely used as foundation system for sound walls to resist lateral loads. The design method based on the ultimate lateral capacity, such as Broms method, is often used for sound wal
Jan 1, 2007
-
Evaluation Of Pile Foundation Design Methods Using Load Tests
By SungWon Park
The efficiency of the current design methods for computing pile resistances is evaluated using field load-settlement tests results. Twelve load-settlement test data for drilled shafts and bored piles
Jan 1, 2009
-
Predicting The End Bearing Capacity Of Rock Socketed Shafts
By Lianyang Zhang
For optimal design of rock socketed shafts used to support axial loading, it is important to predict the end bearing capacity. The existing empirical methods for determining the end bearing capacity o
Jan 1, 2008
-
Analysis Of Static And Dynamic Horizontal Load Tests On Steel Pipe Piles
By Pastsakom Kitiyodom
In order to estimate the deformation and load distribution of a single pile subjected to dynamic horizontal load as well as vertical load, a simplified method of three-dimensional numerical analysis,
Jan 1, 2006
-
The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling Fluid (cdc8479e-b761-4427-8d26-4088be3d5ab5)
By Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Reduction Of Local Scour Around Cylindrical Bridge Piers Using Upstream Protective Piles
By A. K. Bhattacharya
Cylindrical bridge piers are widely used and equations exist that can predict the maximum depth of local scour around such piers. Scour around piers is an undesirable phenomenon, as it requires the fo
Jan 1, 2009
-
Jetting-Assisted Sheet Pile Driving
By Marie-Pierre Bourdouxhe-Barnich
Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d
Jan 1, 2002
-
A Contribution To Studies Of Piles Under Dynamic Loads - Synopsis
By R. J. Folic
Investigations of the vibrations of a pile in soil are performed on a dynamic model in the form of a prismatic bar of finite axial and flexural stifnesses with a discrete mass at its free end represen
Jan 1, 2010
-
An Innovative Approach To Load Testing Of High Capacity Piles
By P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Performance Of A Large Diameter Drilled Pier
By A. J. Partos
One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan
Jan 1, 1989
-
Drilled Pier Foundations In Expansive Soils ? Synopsis
By F. H. Chen
the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri
Jan 1, 2010
-
Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project Description
By Daniel J. Rider
In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from
Jan 1, 1987
-
To Protect Pit-Wall By Means Of Chemical Grouting In Excavation Work Of Deep Foundation Pit
By Xiong Houjin
In the excavation works of some deep foundation pits within the boundaries of Guangdong Province of China, though some measures, such as steel sheet piles, diaphragm walls, etc. were taken to protect
Jan 1, 1991
-
Thermal Integrity Profiling Of Drilled Shafts
By Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction
By Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994