Development Of The Osterberg Load CellBy Charles L. Guild
I will add a few facts about the use and development of the Osterberg Test Load Cell and my association with Jorj. I first met Jorj in 1965 when the Guild Construction Co. drove 12" diameter cast-in-p
Jan 1, 1989
-
Underwater Concrete - Mix Design And Construction PracticesBy Sam X. Yao
The underwater concrete technology has historically evolved largely through a trial-and-error process of constructing marine works. Many outstanding examples exist of high quality concrete placed unde
Jan 1, 2013
-
Fundamental Tests On The Performance Of High Capacity Pin PilesSMBy Donald A. Bruce
Pin Piles are small diameter, bored, cast-in-place piles used to underpin structures. They were first employed over 40 years ago in Italy, and have been used in the U.S. since the late 1970's. Ho
Jan 1, 1993
-
The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed TunnelBy J. S. Lee, R. K. Massarsch
"A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o
Jan 1, 2015
-
Building The High-Pressure Jet-Grouting Curtains For Deep Foundation Ditch In The Seaside AreaBy Lin Daoyi
In this paper, we have adopted the high pressure jet-grouting curtains to seal the sea-water, and to consolidate the wall of the well for deep foundation diteh, make a pladge of building and construct
Jan 1, 1991
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - IntroductionBy Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? SynopsisBy Y. G. Qin
In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i
Jan 1, 2010
-
Skirt Suction Foundation - Application To Strait Crossings -By Takashi Saito
Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon
Jan 1, 2013
-
Reliability Of Pile Prediction Methods - SummaryBy M. T. Davisson
Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)
Jan 1, 1991
-
Augered Pile World Record Depth within a Soil Mix BasementBy Andres M. Baquerizo, Jeremiah J. Filjones, Nicholas Feldt
The Estates at Acqualina located in Sunny Isles Beach, FL, is comprised of two, ocean-front, 50-story, luxury towers with podiums and villas. With city regulations now requesting that above-grade floo
Jan 1, 2019
-
Piling The Gateway To EuropeBy Howard Roscoe
Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su
Jan 1, 2002
-
Piling Projects Constructed With Vinyl Polymer Support Fluid In Glasgow, ScotlandBy Derek J. Lennon
Ground conditions in central Glasgow generally comprise loose granular deposits overlying stiffer soils. CFA piling would normally be preferred for urban sites in these ground conditions, but flightin
Jan 1, 2006
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022
-
A Fully Connected Jobsite is a Must for the FutureBy Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019
-
Deep Excavation Retaining Systems In Unsaturated SoilsBy Tariq B. Hamid
Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav
Jan 1, 2006
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? SynopsisBy S. X. Liang
In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput
Jan 1, 2010
-
Behavior Of Grouted Shaft Helical Anchors In ClayBy Alan J. Lutenegger
Some years ago, a method was developed to incorporate a grout column around square-shaft helical screw-piles and anchors to increase shaft buckling resistance under compression loading. An additional
Jan 1, 2011
-
Construction And Instrumentation Of A Deep Foundation ? SynopsisBy Y. K. Wong
This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment
Jan 1, 2010
-
A Unique Solution To Mitigate Movement At The Jefferson Memorial SeawallBy Jesús E. Gómez
In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North
Jan 1, 2011