Rock Sockets
By D. E. Sherwood
Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern
Jan 1, 1991
-
Design Of Augered Cast In Place (ACIP) Piles - Introduction
By Michael McVay
The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven
Jan 1, 1997
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2
By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
Foundation Retrofit Design and Construction for the Benicia-Martinez Bridge, Martinez, California - 1998 DFI Annual Conference October 7th-9th, 1998 Seattle, Washington
By Roy A. Imbsen
Following the 1989 Loma Prieta earthquake, California Department of Transportation (Caltrans) expedited an effort to evaluate and retrofit important state-owned toll bridges to enhance performance of
Jan 1, 1998
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques
By Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
Formation Of Interlocking Jet Grout Columns At Large Depth
By Chu E. Ho
Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl
Jan 1, 2008
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - Synopsis
By A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Construction Of Large Underground Openings And Use Of Grouts ? Synopsis
By E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
Business Benefits Of An Integrated CFA Rig Instrumentation System
By Jason N. Scott
CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi
Jan 1, 2006
-
Deterministic Analysis for Liquefaction and its Mitigation by Suitable Foundation Type in Bangladesh
By Arpit Parikh
"Ground Water or Pore water pressure development in Sandy Soil formation is Critical situation in foundation analysis and design.Moreover it become severe while associated with higher liquefaction pro
Jan 1, 2017
-
Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary
By Roy A. Bell
A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet
Jan 1, 1997
-
Diaphragm Walls Acting As Anchor Curtains Of Laterally Loaded Structures - Synopsis
By J. Matos e Silva
The paper refers two examples of structures located in seismic areas (Cases 1 and 2). The first one (Case 1) is the Torroal Bridge, located about 100 Km South of Lisbon, in the road Troia-Grandola
Jan 1, 1996
-
State Of The Art In Double Rotary Drilling - Experience Gained From Practice
By Markus Schönit
Double rotary drilling combines continuous flight auger drilling with a casing for producing a cast-in-place pile. When producing a pile an outer casing and an auger (hollow auger) rotating inside
Jan 1, 2011
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles
By John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - Summary
By Edmund J. Cardoza
The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is
Jan 1, 1992
-
Innovative Design At Lake Lenexa
By Jacques Moraille
The public is asking for more aesthetic designs if they can be proven cost-effective at providing an appealing element to new dams. Lake Lenexa was designed and built around the idea of providing for
Jan 1, 2009
-
Operator Independent Installation Of Lime Cement (L/C) Columns
By Tobias Hansson
The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva
Jan 1, 2000
-
Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho
By Dean E. Harris
The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of
Jan 1, 2003
-
Interlocking H-Sections For Cofferdams Resist High Pressure
By Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Approach Wall Foundations Olmsted Locks And Dam Project ? Summary
By Jeffrey A. Schaefer
The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe