Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Doyle Drive - Extreme Pile Installation

    By Peter Faust

    The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha

    Jan 1, 2011

  • DFI
    Threading Piles Past Underground Assets In Central London

    By Alexander Nikolic

    The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra

    Jan 1, 2011

  • DFI
    Concrete Piles Driven In A Coral Sand

    By L. D. Johnson

    12 groups of 12 precast prestressed (PCPS) piles were driven in the lagoon of Kwajalein Island to support a dry dock. Pre-construction investigation of the calcareous coral sands and static pile loeid

    Jan 1, 1993

  • DFI
    Influence Of Urbanization And Geology On Deep Foundation Design And Construction

    By Hiren J. Shah

    The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his

    Jan 1, 2011

  • DFI
    Copenhagen – Denmark Cityringen Metro Project: Innovative Solution for Deep Excavation in Complex Urban Areas

    By Paolo Cavalcoli, Marco Ziller

    "ABSTRACT: In the year 2010 the State of Denmark together with the Municipality of Copenhagen, launched a very important and complex Project : the complete construction of a new double Subway Line :th

    Jan 1, 2014

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • DFI
    EFFC/DFI Best Practice Guide to Tremie Concrete for Deep Foundations, Edition 1

    By EFFC/DFI Concrete Task Group

    Concrete technology continues to advance rapidly and modern mixes with five components – cement, additions, aggregates, (chemical) admixtures and water – often have characteristics which differ signif

    Jan 1, 2016

  • DFI
    Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge Rehabilitation

    By Jeffrey R. Hill

    To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a

    Jan 1, 2006

  • DFI
    Specialized Slurry Wall Equipment - The Hydromill - Summary

    By Mario Mauro

    The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l

    Jan 1, 1994

  • DFI
    Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case History

    By Aly M. Mohammad

    State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,

    Jan 1, 2006

  • DFI
    Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - Introduction

    By John P. Turner

    The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback

    Jan 1, 1990

  • DFI
    Low Strain Integrity Testing Of Deep Foundations ? Introduction

    By Jay A. Berger

    Nondestructive testing of deep foundations for integrity problems made great strides in the late 1980's. Inexpensive portable computers have allowed the immediate and rapid processing of field me

    Jan 1, 1990

  • DFI
    Plastic Piling

    By Magued G. Iskander

    The deterioration of concrete, steel, and timber is a serious hindrance to construction in marine and corrosive environments. Composite materials such as fiber-reinforced polymers (FRP) can offer perf

    Jan 1, 2002

  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • DFI
    Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult Conditions

    By J. C. W. M. de Wit

    An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the

    Jan 1, 2006

  • DFI
    Local Use And Design Of Augered, Cast-In-Place Piles In The Southern Piedmont Province ? Introduction

    By Geoffrey C. Hebner

    Augered, cast-in-place piles (ACIP) have become a very common foundation type in Atlanta and the Southern Piedmont Province as well as much of the United States in the past 20 years. Prior to the intr

    Jan 1, 2003

  • DFI
    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • DFI
    The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

    By Li Keqiang

    Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on

    Jan 1, 1991