Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)
By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques
By Huw Williams
"Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi
Jan 1, 2005
-
Seven Mile Dam Retrofit - A Global Challenge
By Arvindh Gupta
BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally
Jan 1, 2004
-
Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, California
By Todd W. Armstrong, Michael D. Reader
"INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate
Jan 1, 2005
-
PSC Piles Overcome Challenges for $650m Power Plant
By Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Recovery Efforts At The World Trade Center "Bathtub"
By George J. Tamaro
In 1967 the Port Authority of New York and New Jersey undertook the construction of the World Trade Center (WTC) diaphragm walls, installation of the lateral support system and the excavation of the s
Jan 1, 2002
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)
By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2015
-
Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well Technology
By Paul Suver
The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co
-
The Stiffening Effect of a Caliche Layer on Pile Foundations
By Richard Stone, Rouzbeh Afsharhasani, Moses Karakouzian
"Caliche, a hardened sedimentary deposit of calcium carbonate that occurs worldwide, generally in arid or semiarid regions, is frequently encountered in Las Vegas, Nevada. The presence of a caliche la
Jan 1, 2015
-
Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications
By Michael E. Ameel
The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co
Jan 1, 2010
-
Helical Piers/ Anchors in the Chicago Building Code
By Gary L. Seider, Dana A. Wesolek, Fred C. Schmednecht
"A new condominium project, The Atelier, developed by Pickus Companies located at the corner of Bryn Mawr and Sheridan in Chicago, IL required an earth retention system to protect the surrounding road
Jan 1, 2005
-
Jacked Tunnel Construction
"Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in
Jan 1, 2003
-
The Quality Control Of Deep Foundation ? The New Approach By Non-Destructive Techniques ? Synopsis
By K. S. Ho
With the aid of the advanced electronic devices and micro-processors, the quality control of deep foundations can be carried out by Non-Destructive Tests (NDT). Three methods are presented here: the S
Jan 1, 2010
-
Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity Piles
By W. G. K. Fleming
Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m
Jan 1, 1991
-
Augered Cast-In-Place Pile Installation, Grand Forks, North Dakota
By Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Investigation Of Bearing Behavior Of Pile Raft Foundation Using Numerical Modeling
By A. Ghorbani
The analysis of Combined Pile Raft Foundation (CPRF) is very complex due to involved interactions among components of CPRF system. Many researchers made efforts to develop sufficient methods including
Jan 1, 2007
-
Hybrid Energy System Installed on Deep Mixing Barge
By Kento Miyamoto, Kazuki Imamura, Takayuki Tanaka
"Global economic development has drastically increased energy consumption in various fields, and CO2 emissions, which are a prime cause of global warming, have continued to increase. Therefore, measur
Jan 1, 2015
-
CFA Secant Piling In California
By Philip Derbyshire, Dale J. Scheffler
"Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form
Jan 1, 2005
-
A Comparative Study on Behavior of Bucket Pile in Sand According to Installation Methods
By Jinung Do, Sung-Ryul Kim, Juhyung Lee
"Model tests have been performed to investigate the vertical, horizontal and cone tip resistances of bucket pile embedded in sand by different installation methods; suction force by pump and jacking f
Jan 1, 2016
-
Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to Inundation
By Adel M. Hanna, Ibrahim M. Mashhour
"Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou
Jan 1, 2015