Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachBy M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
Installation Effects of Drilled Screw Pile In Soft ClayBy Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen
"Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h
Jan 1, 2015
-
Construction Of Cast-In-Place Piles With Enlarged BasesBy H. Mori
Construction of cast-in-place piles with enlarged bases has become popular in the cities in Japan facing to the sea coast, where the subground soil is soft alluvium deposited to depths often exceeding
Jan 1, 1989
-
Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, TurkeyBy Carlandrea Albonico, Salvatore Miranda
The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc
Nov 1, 2022
-
Micropile Transmission Foundations In Environmentally Sensitive, Challenging TerrainBy Esam Abraham
A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo
Jan 1, 2010
-
Evaluation Of Causes Of Bleeding Of Free Water From A Bentonite SlurryBy Tony P. Suckling
This paper describes an investigation into the bleeding behaviour of bentonite slurry observed on a trial diaphragm wall panel. The bleeding is thought to be due to the bentonite experiencing a chemi
Jan 1, 2011
-
Driven Pile Foundation Design and Construction Issues for a Highrise Building in ManhattanBy Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer
"This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,
Jan 1, 2016
-
Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case HistoryBy Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet
"Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat
Jan 1, 2016
-
Approximate Assessment Of Basement Wall Effects On Foundation PerformanceBy Helen S. W. Chow, Harry G. Poulos
Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl
Nov 1, 2022
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Jet Grout For Soil Mass Stabilisation To Support Power Plant FoundationBy Vishal Pathak, Shailesh A. Godhuly
Ground Modification System in terms of Jet Grouting for soil strengthening and mass stabilization was engaged for a power plant project in an international power project, engineered by L&T-S&L. The si
Sep 1, 2022
-
Interpretation and Evaluation of Thermal Integrity Profiling MeasurementsBy Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021
-
Investigation Of Recycled Plastic Piles For Support Of Structures In Expansive Shale EnvironmentsBy Eric Brandner
Expansive soil formations can be found throughout the United States. When subjected to wetting, many of these formations have the potential to swell and exert large uplift forces which can significan
Jan 1, 2009
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct ComparisonBy Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
Pile Set-Up to Optimize High-Rise Bridge DesignBy Charles Winter
The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a
May 1, 2022
-
Jet Grouting for Echo Dam Seismic RehabilitationBy Tara Schenk-McFarland, Mark Bliss
Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s
Jan 1, 2017
-
In-Situ Ground Reinforcement TechniquesBy P. J. Nicholson
The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement
Jan 1, 2010
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Experience-Based Value Engineering of Foundations & Deep Excavation Support SystemsBy Abdulazeez Rotimi, Barry Sheppard, Abid Adekunte
Good engineering practice is a function of sound theoretical knowledge, first-hand experience on previous projects of similar scope and scale, good acquaintance with case histories of similar projects
Sep 8, 2021