Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Spherical charge cratering-plane and angle geometry involving small-scale single and row tests

    By D. E. Salman, R. R. Maclachlan, R. J. Barclay

    "There is a considerable resource of data for spherical charge cratering, both as single charges and in row-of-charge geometr(1). The data are. however, based on cratering performance to a single free

    Jan 1, 1981

  • CIM
    3-D modelling of underground mine structures with backfill

    "A 3-dimensional finite element model for stress/stability analysis of rock excavations in underground mines is presented. Developed for use on personal computer under OS/2 operating system, the model

    Jan 1, 1992

  • CIM
    Geology and geochronometry of tin mineralization associated with the Seagull batholith, south-central Yukon Territory

    By Gonzalo Mato, Colin Godwin, G. Ditson

    "The mid-Cretaceous Seagull batholith intruded Mississippian sedimentary and volcanic rocks and Jurassic(?) granitic and ultramafic rocks within the Omineca Crystalline Belt in the Yuk on Territory ne

    Jan 1, 1983

  • CIM
    Co-products and by-products of base metal mining in Canada: facts and implications

    By L. S. Jen

    Canadian copper, nickel, zinc, lead and molybdenum mines are characterized by the mining of ores from which more than one metal is recovered. During the 1980s, approximately 15% of the gold, 25% of th

    Jan 1, 1992

  • CIM
    Development of a 70-ton capacity automated underground trolley truck

    By L. C. Kitchener, K. Vollenwyoer

    "This paper describes the development of an automated, 70-ton capacity, underground electric trolley truck at Inco Ltd. The purpose of the project is to provide a high capacity and high productivity h

    Jan 1, 1988

  • CIM
    Exploring Saskatchewan?s Vast Potash Resource

    By A. Dave Mackintosh

    The Current demand for potash has pushed world prices to record levels and allowed Saskatchewan producers to operate at maximum capacity. Several years of strong demand has resulted in a permitting ru

    May 1, 2008

  • CIM
    Feasibility of iron recovery from Mount Wright tailing material

    By John A. Meech

    "Oleic acid flotation of Mount Wright thickener underflow tailing material has been shown to be capable of increasing plant recovery by 3%. High levels of oleic acid addition (1.5 kg/t) are required,

    Jan 1, 1981

  • CIM
    Stepping Stone Toward Sustainable Development: Improving Environmental Assessment of Mineral Aggregate Resources

    By Heather Budney

    Objectives 1. Evaluate the effectiveness of ON?s EA processes using criteria from the EA and policy sciences literature. 2. Recommend improvements to the EA processes and draw lessons from the ON ca

    May 1, 2008

  • CIM
    Treatment of Gold Mill Effluents for Removal and Recovery or Destruction of Cyanide -A Summary of the Joint Project with Six Gold Mills

    By G. M. Ritcey, V. M. McNamara

    "In the processing of gold ores by the cyanidation route, effluents which are discharged to the tailings areas can contain up to several hundred parts per million of cyanide in complex combination wit

    Jan 1, 1978

  • CIM
    Computer-aided short-term mine planning

    By Peter J. Franklin

    "Short-term mine planning of open pits is an activity that has historically been carried out by hand. Typically, the use of computers has played little part in this type of mine planning. This paper d

    Jan 1, 1985

  • CIM
    La Mine Doyon mill expansion

    By G. H. Hope, A. R. Maycock

    "La Mine Doyon is a gold mining operation located in northwestern Quebec, approximately 35 km east of Rouyn-Noranda and 85 km west of Val d'Or. The mine is jointly owned by Lac Minerals Ltd. and

    Jan 1, 1988

  • CIM
    Progress in the Flash Roasting of Sulphide Ores

    By Horace Freeman

    Introduction This paper is an amplification of the paper presented by the writer at the last (1930) Annual Meeting of the Institute (1), and is somewhat in the nature of a progress report upon the in

    Jan 1, 1931

  • CIM
    Radium removal from Canadian uranium mining effluents by a radium-selective ion exchange complexer

    By L. A. Mells

    "A laboratory test program was initiated by the Department of Energy, Mines and Resources as part of the National Uranium Tailings Program to investigate the applicability of a radium selective ion ex

    Jan 1, 1985

  • CIM
    Simulation of a grinding circuit change to reduce lead sliming

    By J. Ramirez-Castro, J. A. Finch

    "Galena is the finest component of the product of a closed-circuit grind treating a lead-zinc ore, largely due to preferential recycling of this high-density mineral by the cyclone. For example, at th

    Jan 1, 1980

  • CIM
    Geochemical profile of till from Longlac, Ontario to Somerset Island

    By William W. Shilts

    "In carrying out a geotechnical survey of a proposed gas pipeline route from the Arctic Islands south to Longlac, Ontario, the Polar Gas Consortium contracted the drilling of several hundred 2- to 2D-

    Jan 1, 1980

  • CIM
    The Kidd copper smelter and refinery description and early operation

    By C. J. Newman, D. J. Kemp, R. M. Sweetin

    "The smelter is described by area; feed preparation, continuous furnace line, gas handling and auxiliary systems, blister refining, Hazelett casting of thin anodes, and scrap remelting. Early smelter

    Jan 1, 1984

  • CIM
    Development of the System for Furnace Integrity Monitoring Based on Real-Time Continuous Acoustic Emission Data Acquisition and Analysis

    By A. Saki, P. Gebski, W. Ying

    Industrial smelting furnaces are subjected to significant structural changes and deterioration caused by the conditions under which they operate. The current methods for the structural assessment of f

    Jan 1, 2011

  • CIM
    Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machine

    By R. Lovat, J. A. Hunter

    "The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica

    Jan 1, 1984

  • CIM
    National Instrument 43-101, Form 43-101F1 - Technical Report

    "The technical report form provides the headings to be used and content required when a completing a technical report to be filed in accordance with NI 43-101. The technical report is meant to be a su

    Jan 1, 2003

  • CIM
    The Performance of a Lamella Thickener at Inco's Copper Cliff Nickel Refinery

    By B. R. Bowerman, W. J. Thoburn, M. J. Humphris

    "Nickel granules are produced for carbonylation by pouring a molten stream into a path of high pressure water. Granules and water are separated in dewatering bins. The overflow, which contains up to 0

    Jan 1, 1977