Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Brunswick peat resources and their utilizationBy D. KEYS, D. E. Gemmell
The portion of the earth's surface covered by peatlands has been conservatively estimated at over 420 million ha (Kivinen and Pakarinen 1980). It is estimated that there are about 170 million ha of pe
Jan 1, 1984
-
The Heavy Oil Situation in Western CanadaBy J. C. Gilbert
"IntroductionTHE PURPOSE of this paper is to discuss in a general way the heavy oil situation in Western Canada, and particularly to acquaint those in the oil industry who have not participated in the
Jan 1, 1952
-
Hidden Creek MineBy N. E. Nelson
"The Hidden Creek mine is about l~ miles north of the north end of Granby bay; a nearly landlocked body of water on the west side of Observatory inlet; 90 miles north of Prince Rupert; British Columbi
Jan 1, 1954
-
Kearl Oil Sands Project OverviewBy Scott Hommema
? Bitumen in the oil sand averages Bitumen 12 wt%; water makes up 4 wt% ? Imperial Oil (operator) and ExxonMobil developing Kearl Leases #6, 36, 87 (~200 sq. km) ? Target resource > 4 Billion Bar
May 1, 2008
-
An investigation into the relationship between the expiosibility and mineralogy of sulphide ore dustsBy J. P. Sairrlon, K. G. Wheeland, K. J. Mintz, B. J. Kiener
Iwenty-one ore dusts of varying mineralogy, sulphur content and reputed in-mine explosibility were selected from eight mines. After chemical and mineralogical analysis and sieving into two size fracti
May 11, 1988
-
Nature & Usefulness of Simulation as it Applies to Equipment Selection at an Open-Pit MineBy D. R. Jolley
"The selection of equipment for open-pit mining is an important decision which results in a considerable capital expenditure by the operator. The decision is complicated by the wide product range on t
Jan 1, 1970
-
Development and Evaluation of a New Bubble Generating Device Based on Impinging Jetting for Column FlotationBy P. Ramirez
"To achieve an optimal metallurgical performance in the flotation process the bubble diameter should be between 0.5 and 2.5 mm. To control bubble size, frothers are added, reducing bubble size and con
Jan 1, 2016
-
South Main Shaft at Flin FionBy J. P. Caulfield
THE Hudson Bay Mining and Smelting Company's underground mine at Flin Flon, Manitoba, has in the past been serviced by two working shafts-the North Main shaft, and the No. 3 shaft. The North Ma
Jan 1, 1941
-
Hydrometallurgical Processing of Mongolian Lanthanide OreBy A. Pawelczyk, D. Hreniak, E. Zych, W. Strek, K. Grabas, A. Ostrowski
"Mongolia is a country rich in rare earth resources. In the experiments carried out samples of the Mongolian ore were processed to obtain a lanthanide concentrate. The concentrate underwent hydrometal
Jan 1, 2012
-
Novel Process of Nh3-N Removal and Recovery in Rare Earth and Non-Ferrous Industry Wastewater: Fundamental, Simulation and Commercial ProjectsBy Chenming Liu, Xiao Lin, Bo Wang, Hongbin Cao, Xingang Li
Over 2 million tons of NH3-N were discharged in China per year recently, rare earth industry contributed 7.03% of NH3-N pollutant from industrial wastewater in 2007. Wastewater containing NH3-N and he
Jan 1, 2016
-
Troubleshooting Lonmin Rom Mill Treating Ores Produced by two Mining MethodsLonmin RoM ball mills are treating two types of feed ore produced by conventional mining and mechanised mining methods. It was reported that reduction in mill throughput was observed when treating the
Jan 1, 2012
-
Kinross Paracatu, Start-Up and Optimization of Sag CircuitBy Junior Santos
Kinross Paracatu started the operation of the new gold processing plant in the end of 2008, being composed by one SAG mill and two ball mills. During the first year of operation the plant had several
Jan 1, 2012
-
Investigation of Method of Addition of Surfactant to the Pressure Leaching of Nickel-Containing Pyrrhotite ConcentratesBy E. M. Timoshenko, A. V. Tarasov
The results of laboratory, bench-scale and semi-commercial investigations of a method for adding surfactant (technical-grade lignosulphonate) to the process of pressure leaching of nickel-containing p
Jan 1, 2004
-
Coal Mining in Poland After World War IIBy T. W. Wlodek, Zygmunt Kowalczyk
In the period from 1946 to 1964, the annual output of co al from Polish mines increased from 4 7.3 to 117.35 million tons. In this paper, the methods of bringing about this increase in productivity th
Jan 1, 1967
-
Hydrotransportation System of Tailings Dam ?Benkovski 2? ? New Technological Solutions to Prolong the Operational Lifetime and Raise the Final Filling Contour of the Hydraulic StructureBy S. K. Dimitrov
?Ellatzite Med? is one of the biggest mining companies in Bulgaria, processing about 12,000,000 t of ore per year. Waste materials left after extraction of copper concentrate are deposited in tailings
Aug 1, 2013
-
Investigation of Volatilization of Arsenic and Antimony from Tennantite/Tetrahedrite Ore by Roasting ProcessBy Kazutoshi Haga, Batnasan Altansukh, Yasushi Takasaki, Mohd Yazid Bin Abdul Razak, Atsushi Shibayama
"In this study, the volatilization behaviour of arsenic (As) and antimony (Sb) from arsenicantimony bearing minerals such as tennantite (Cu12As4S13)/tetrahedrite (Cu12Sb4S13) in copper ore was investi
Jan 1, 2016
-
Real Behaviour Of Thickened TailingsBy C. Cano
One of the main concerns within the mining industry is to minimize the impact of tailing facilities to the environment and nearby communities. Since the implementation of the first thickened tailings
Jan 1, 2007
-
Evaluation of Groundwater Leakage into a Dam Foundation Drainage TunnelBy J. M. Hong, H. K. Zheng, R. Hu, C. B. Zhou
The Jinping-I double curvature arch dam, located in the middle reach of the Yalong River and with a maximum height of 305 m, is the world highest dam of the same type that has been completed. Since th
Jan 1, 2015
-
Flotation Improvements at Placer Dome's Campbell MineBy J. A. Folinsbee, Andre Robitaille, Tony Y. Chong
"Conventional crushing and grinding is followed by gravity concentration to recover free milling gold. Refractory gold, finely disseminated within the pyrite and arsenopyrite matrix, is recovered by f
Jan 1, 1998
-
Modifying the Design of Drying Chamber Flights of the Gol-E-Gohar Pelletizing Plant Ball MillBy S. Banisi, A. R. Hasankhoei, Gh. Parsapour, A. R. Ghasemi
At the Gol-E-Gohar mining and industrial Company, a pelletizing plant, which includes two parallel dry closed grinding circuits and a pellet production circuit, produces 600 t/h. Each grinding circuit
Jan 1, 2016