Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mocca: A Grinding Circuit Control Application

    By C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher

    "MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con

    Jan 1, 1991

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Precious-Metal-Bearing Volcanogenic Massive Sulphide Deposits, Campo Morado, Guerrero, Mexico

    By Robert Cluff

    The Campo Morado precious-metal-bearing, volcanogenic massive sulphide district occurs in a Lower Cretaceous felsic volcanic sequence in a northerly trending belt in the Guerrero Terrane in northeaste

    May 1, 2006

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    Overview of overburden removal at Syncrude Canada Ltd.

    By Y. P. Malhotra, JE. C. Carter

    "Syncrude's overburden removal requirement ranges from 20 million to 30 million bank cubic metres per year to meet tarsand demands for the production of 129,000 barrels of synthetic crude oil per

    Jan 1, 1983

  • CIM
    Metallurgy of the Mt. Milligan Porphyry Gold/Copper Deposit

    By A. B. Cron, R. MacPhail, L. Melis, K. Armstong

    "Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1

    Jan 1, 1991

  • CIM
    An Instrumented Laboratory Cell for Gold Cyanidation Modelling

    By M. Kane, B. Bissonnette, D. Hodouin

    "A laboratory cell has been designed for a careful investigation of gold ore cyanidation using mathematical modelling of the process kinetics. The cell is a stirred vessel with continuous monitoring a

    Jan 1, 1990

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    Corona Corporation Nickel Plate Mine

    By S. Haggarty

    "Wholly owned by Corona Corporation, the Nickel Plate Mine is an open pit, gold mining operation located near Hedley, 50 km west of Penticton, in Southern British Columbia.Milling capacity is 3,400 SD

    Jan 1, 1991

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Flotation of the Major Copper Sulphide Minerals – An Electrochemical Viewpoint

    By A. R. Barnes, N. O. Lotter

    Recoverable economic copper sulphide minerals such as chalcopyrite, bornite, chalcocite and covellite often occur together in varying proportions in the major copper-bearing ores, and have individual

    Jan 1, 2016

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Particle Composition Distribution: Measurement and Prediction in Mineral Processing

    By G. Barbery

    "Particle composition distribution is an essential feature of materials processed by physical separation methods. The amenability to segregate a feed material in a concentrate and a tailings stream de

    Jan 1, 1986

  • CIM
    Sulphur Compounds and Metal removal using Bioprocess Technology

    By Andre L. De Vegt, Cees J. N. Buisman

    "For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous st

    Jan 1, 1997

  • CIM
    Expert System Technology at the Polaris Mine

    By G. A. Kosick, C. A. Harris

    "Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr

    Jan 1, 1988

  • CIM
    Oxidation, Weight Gain and Self-Heating of Sulphides

    By J. E. Nesset, J. A. Finch, Rosenblum. F., S. Somot

    "In a previous presentation at the CMP, evidence was shown for the formation of hydrogen sulphide (H2S) in self-heating experiments on pyrrhotite-rich samples (Somot and Finch, 2006). Oxidation of H2S

    Jan 1, 2009

  • CIM
    Géologie et géochimie de la mine Lamaque, Val d'Or, Québec

    By Paul Bedard, Réal Daigneault, Guy Perrault

    "La mine Lamaque est située a Val d'Or, Québec; les roches hônes appartiennent au groupe de Malartic, partie supérieure, et sont des andésites et des pyroclastites. On y retrouve deux formes d&ap

    Jan 1, 1983