    Undersea Tunnel Design with Reference to the Channel Tunnel

    Design and construction techniques used to develop two highway tunnels in inaccessible mountainous terrain are described. Measures used to adapt the design to the unusual geology and topography are

    Jan 1, 1976

  • AUSIMM
    Construction and Commissioning of the Lebong Tandai Gold Mine and Treatment Plant

    By West RF, Pooley RH

    An underground mine, a treatment plant and supporting facilities have been constructed at Lebong Tandai in Sumatra, Indonesia by PT Lusang Mining. Throughput is initially 50,000 tonnes per annum

    Jan 1, 1986

  • AUSIMM
    An Overview of the Telfer 10 Mtpa Dump Leach Operation

    By Mitchell I, Gelfi P, Dunne R, Pyper R

    Dump leaching at Teller in its present form began in the fourth quarter of 1988 as an adjunct to milling operations. Initial plans called for a dedicated dump leach facility capable of processing o

    Jan 1, 1994

  • AUSIMM
    Integrating North American Shaft Sinking Practices into Australian Operations ù Telfer Hoist Shaft Development

    By P Bonniwell

    As a part of the Newcrest, Telfer Expansion Project, a consortium of Australian, Canadian and South African Mining Contractors in joint venture have been contracted to develop the hoisting shaft. The

    Jan 1, 2005

  • AUSIMM
    HydroCopper<sup>«</sup> ù A New Method for Treating Copper Concentrates

    By E Yll÷, O HyvSrinen

    Outokumpu has developed a new chloride leach process, called HydroCopper«, to treat copper concentrates. Chalcopyrite is quite refractory in leaching and in sulfate milieu an autoclave of high tempera

    Jan 1, 2005

  • AUSIMM
    Mineralogical Face-Mapping Using Hyperspectral Scanning for Mine Mapping and Control

    By L Whitbourn, K Yang, P C, E Ramanaidou

    The potential of hyperspectral mineral mapping within a mine environment is demonstrated. Central to this capability has been the development of portable or vehicle-mounted, hyperspectral mine face-ma

    Jan 1, 2006

  • AUSIMM
    Some Applications of Two-Colour Pyrometry to Pyrometallurgical Research

    A very sensitive high-speed two-colour pyrometer was built to measure the temperature of single particles of sulphide mineral, typi- cally 50 pm in diameter, as they burnt while entrained in a hot

    Jan 1, 1984

  • AUSIMM
    Sustainable Use of Bauxite Residue Sand (Red Sand) in Concrete

    By H Nikraz, E Jamieson, D Cooling

    The use of red sand as fine aggregate in concrete manufacture has been investigated as well as the use of fly ash as a cement replacement. The experimental work consisted of casting various concrete m

    Jan 1, 2006

  • AUSIMM
    A 29 MW Ice System for Mine Cooling

    Projected cooling requirements for ERPM led to the first proposals for the large- scale use of ice for mine cooling in the early 1980&apos;s. Following successful research into ice conveying and ic

    Jan 1, 1988

  • AUSIMM
    Selection of an Ore Haulage System for Telfer Deeps

    By P J. Ellen

    The selection of the ore haulage system is a key decision made in the development of an underground mine. The haulage system is one of the components that define a mineÆs ability to respond to changes

    Jan 1, 2005

  • AUSIMM
    Tailings Disposal Practice at Waikato North Head Minesite

    Tailings facilities tell a story to the public about how the mining industry manages its activities. They also create a risk that must be managed for the long term. All the knowledge and technology is

    Jan 1, 2004

  • AUSIMM
    Development of Lancefield Panel Stoping

    A combination of highly structured, fissile stope hangingwalls and high ground stresses have caused difficult mining conditions in the Main Lode Deeps at Lancefield Gold Mine. Cyclic reviews of grou

    Jan 1, 1995

  • AUSIMM
    The Design of the Rosebery (Tasmania) Concentration Mill - Factors Influencing Choice of Equipment

    BECAUSE of the attention given in recent years to the flotation process, there is an extensive range of equipment available to any staff detailed for: the design of a flotation mill. This statement ap

    Jan 1, 1929

  • AUSIMM
    Operational Excellence in Rock Blasting - From a European Point of View

    By R Lurf, C Weber

    In the frame of this paper a holistic dynamic process model approach is presented in order to introduce operational and technical excellence in drilling and blasting. Both on a macro and micro level t

    Jan 1, 2007

  • AUSIMM
    The Carbonatite-Hosted Apatite Deposit of Jacupiranga, South- East Brazil û Styles of Mineralisation, Ore Characterisation and Association with Mineral Processing

    The carbonatite-hosted apatite deposit at the Cajati open pit mine in the Jacupiranga igneous-carbonatite complex is located in south-eastern Brazil. The major styles of apatite mineralisation include

    Jan 1, 2008

  • AUSIMM
    Slope Stability Radar for Monitoring Mine Walls

    Slope stability is a critical safety and production issue for open cut mines. The æslope stability radarÆ has been developed to remotely scan a rock slope to continuously measure the movement of the f

    Jan 1, 2003

  • AUSIMM
    Recoverable Resource Estimation - A Comparison Using Constrained and Unconstrained Geology Models - Anwia Gold Deposit

    By D Clarke, R Simpson

    The Main lode in the Anwia Gold deposit is difficult to interpret due partly to the fact that three separate grid and drill hole orientations exist over the area and partly due to a lack of understand

    Jan 1, 2006

  • AUSIMM
    Modelling Shear Development at the Macraes Mine, Otago Schist

    By D Craw

    The Hyde Macraes Shear Zone is a mineralised low-angle shear within the Otago Schist traceable for ~30 km with a NW strike. It is been actively mined along 12km of this strike, producing &gt;6 Moz of

    Jan 1, 2007

  • AUSIMM
    A Modified Cable Bolt System For The Support Of Underground Openings

    By Worotnicki G, Tillmann V. H

    Past experience with fully bonded cable dowels placed as a means of reinforcement in highly stressed crop pillars at the New Broken Hill Consolidated Limited (NBHC) mine indicated such support was

    Jan 1, 1983

  • AUSIMM
    Geotechnical Investigation of the South Wall, Mt Whaleback Pit a Case Study - How Goetechnology can Pay its Way

    By Parker RJ, Swindells CF

    The authors have used the geotechnical study for design of the South Wall of Mt. Newman Mining&apos;s Mt. Whaleback Mine to illustrate how geotechnical studies can be economically justified. This

    Jan 1, 1986