Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Golden Blocks Goldfield

    By G D. Price

    The Golden Blocks Goldfield is located in the Slaty Creek area,North West Nelson, about 20 km west of Collingwood. Alluvial gold was discovered in Slaty Creek in 1861. Gold was mined from quartz veins

    Jan 1, 2004

  • AUSIMM
    Assessment of Ecotoxicology and Health Risk from Bioaccumulation in Fish of Heavy Metals and Metalloids from Historical Mine Practices in the Leichhardt River, Queensland, Australia

    By T Huynh, V Matanitobua, J Zheng, B N. Noller, J C. Ng, H H. Harris

    A risk assessment was undertaken of the aquatic ecosystem and bioaccumulation of metals and metalloids in fish at the Leichhardt River, Mount Isa, Queensland. Residual contamination of metals and meta

    Jul 16, 2014

  • AUSIMM
    Metallurgical Factors Affecting the Throughput and Efficiency of Mount Isa Heavy Medium Plant

    By Scott IA, Jefferson C, Dipasquale S

    This paper describes the use of modelling and simulation techniques in the analysis of the heavy medium plant at the Lead/Zinc Concentrator of Mount Isa Mines Limited. The objective of the study i

    Jan 1, 1987

  • AUSIMM
    Report on the Council of Mining and Metallurgical Institutions

    It is my role at this juncture to report to you on behalf of the Council of Mining and Metallurgical Institutions itself. In essence, the Council is an orbital body - a little like Halley's C

    Jan 1, 1986

  • AUSIMM
    Hilton - The All Electric Mine

    By Todd W, Stone C

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Three Dimensional Graphics Modelling as Applied to Longhole Stoping Design

    By Woodlands W. K

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Biohydrometallurgy of Gold: Present-Day Status and Future Prospects

    By Groudeva VI

    The biohydrometallurgy of gold is based on different processes which could be grouped into four main groups (Attia, Litchfield and Vaaler, 1985; Karavaiko et al, 1988; Groudev, 1990): 1. bacterial o

    Jan 1, 1993

  • AUSIMM
    Distal Air-Fall Tuffs: Examples from the Late Triassic of Southeast Queensland

    Distal air-fall ashes are widespread deposits that may record volcanism many hundreds of kilometres from their source. They are characteristically thin, fine-grained and have a low preservation po

    Jan 1, 1987

  • AUSIMM
    Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Selection of Mining Method for Anomaly No 3 of Gol-Gohar Iron Mine of Iran

    By M Heidari, M Ataei

    Today, the selection of a mining method is a multi-criteria decisionmaking process, with many factors in this process connected to each other. These trends do not have a high degree of confidence. In

    Jan 1, 2003

  • AUSIMM
    The Preparation of Ultra-Low Ash Coals

    By Smitham J. B, Keast-Jones R

    Six Australian coals were selected to determine their potential to produce, ultra low ash (less than 2 per cent) coal by progressive size reduction followed by density separation and/or froth flotatio

    Jan 1, 1987

  • AUSIMM
    Tailings governance

    By T Alexieva

    Since the early 1900s the geotechnical community has investigated every significant failure of a tailings dam, improved our knowledge of the behaviour of the tailings storage facilities, developed ana

    Jul 23, 2018

  • AUSIMM
    Economic Factors

    A minimum target of economic growth in Australia has been set at 5% per annum growth in G.N.P. at constant prices (Vernon Committee). 2. The core of the problem of sustaining steady growth at this o

    Jan 1, 1971

  • AUSIMM
    Some Reflections on Uncertainty, Decisions, Models and People

    By S H. Begg

    "*This is an abstract only*Most technical and economic analyses are performed to reduce uncertainty to help make decisions. Decision-making is about ranking alternatives - rarely are precise predictio

    Sep 29, 2013

  • AUSIMM
    Power Development at Mount Isa Mines Limited

    The development of Mount Isa Mines Limited power supply is traced through the history of the mine operations. As would be expected, growth of the power supply system follows closely the increase in mi

    Jan 1, 1961

  • AUSIMM
    The Lead-Zinc Mineralization at Box Hole Bore, Georgina Basin, Northern Territory

    The common notion that the Box Hole Bore mineralization represents a variant of the Mississippi Valley type, has not been supported by the present investigation. Most of the common characteristics

    Jan 1, 1984

  • AUSIMM
    Correcting for the Dilution of Rakes Processed Sequentially from Multiple Mines at the BHP Billiton Iron Ore Newman Joint Venture Operations

    By T J. Howard

    At BHP Billiton Iron Ore operations, run of mine ore from the several Newman Joint Venture (NJV) mines is railed in 12 kt rakes to Port Hedland. Rakes are processed sequentially, with the lump and fin

    Jan 1, 2007

  • AUSIMM
    Technical note-a laboratory scale rotary kiln simulator

    By Field R. V, Graieg O, George T. J

    The design, construction and operation ofa laboratory scale rotary pot kiln are outlined. Charges ofup to 3 kg can be heated to temperatures up to 1200°C in a controlled atmosphere. Some examples

    Jan 1, 1986

  • AUSIMM
    Integrating Srata Control with Coal Winning Systems

    Under South Africanncoalmining conditions, in the majority of instances coal is won using the bord and pillar system without pillar extraction. Examples demonstrate that strata control policy has an

    Jan 1, 1971

  • AUSIMM
    An Approach to Coping with Unstable Pit Walls

    In any open pit mine some slope instability may be expected. This can range from small scale sliding on individual benches to large scale overall slope failure. This paper presents two case histori

    Jan 1, 1986