Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The quality of backfilling of abandoned lignite mines on ground settlement under static and dynamic conditions

    By O Aydan, K Sugiura, A Sakamoto

    It is well known that some sinkholes or subsidence take place from time to time in the areas where abandoned room and pillar type mines exist. The authors have been involved with the stability of aban

    Nov 30, 2018

  • AUSIMM
    The Role of Gravity and Intensive Cyanidation in Processing Preg-Robbing Gold Ores - ABSTRACT ONLY

    A flow sheet has been developed to treat a high tonnage highly preg-robbing gold ore. The ore is low grade and fine grained with a high proportion of very fi ne free gold. The key components of the fl

    Aug 1, 2010

  • AUSIMM
    From paper to bytes – digital mapping implementation

    By A Whaanga

    The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr

    Mar 22, 2022

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    Optimising Underground Mining Strategies

    By A M. Ebbels

    "Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi

    Mar 8, 2016

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021

  • AUSIMM
    Preliminary 3D geological model and structural analysis of the Neoarchean to Palaeoproterozoic Hamersley Basin, Pilbara, Western Australia

    By D McB Martin, A Piechocka, M Jessell, M Lindsay, E Ramanaidou

    The Hamersley Basin of Western Australia, approximately 500 km long by 200 km wide, is recognised globally for its rich endowment of iron ore resources. Two types of bedded iron ore mineralisation are

    Nov 8, 2021

  • AUSIMM
    Sedimentary Structures in Lower Proterozoic Rocks, Barrier Ranges, N.S.W.

    During mapping in the Bijerkerno area (Fig. 1), well-preserved sedimentary structures were found at three separate localities. The structures are of four varieties, which are 1. small-scale cross-bedd

    Jan 1, 1971

  • AUSIMM
    Water treatment in perpetuity – or not?

    By R J. Higgins, M Edraki

    What is the meaning of the Life of a Mine (LOM) if that mine results in a requirement for water treatment in perpetuity? ‘In perpetuity’ is of course a duration with no relationship to a Life-of-Mine

    Jul 25, 2018

  • AUSIMM
    Differential Flotation at Warrego Concentrator

    Warrego copper ore characteristically contains 0.05-0.2% bismuth, which on upgrading produces a concentrate of approximately 1.3% bismuth. Early smelting of this concentrate (1973) was accomplishe

    Jan 1, 1984

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, Queensland

    By B Young

    Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine

    Aug 22, 2011

  • AUSIMM
    Assessment of ground support requirements in coal burst-prone mines

    By J Watson, C Zhang, I Canbulat, C Wei

    Coal burst is defined as a dynamic release of energy within the rock or coal mass in underground coalmines that causes violent rock or coal ejection in the vicinity of mine excavations. It poses one o

    Nov 29, 2022

  • AUSIMM
    High-Speed Motion Picture Photography Analysis in 3D - A New Approach to Analyzing Full Scale Blasts

    By Vanderberg B

    A 3D, PC based computer program is currently under development by Blasting Analysis International, Inc., to analyze the kinetics of full scale blasts with two or more high-speed motion picture camer

    Jan 1, 1990

  • AUSIMM
    Planning Effective Management of Gas Emissions in an Underground Coalmine

    By D J. Black

    The process of excavating and mining coal causes fractures in the overlying and underlying strata. The fractures provide pathways for gas released from coal seams and other gas-bearing strata to flow

    Jun 28, 2016

  • AUSIMM
    Determining the Pressure Pulse for an Air Blast

    By M A. Tuck

    Air blasts or wind blasts as they are termed in underground coal mining, occur in a number of types of underground mining where a void develops and the overlying or adjacent rock fails rapidly to allo

    Jul 1, 2013

  • AUSIMM
    The Bougainville Copper Project (b41e643c-f615-4b3e-a2a5-02f0ca84f6ba)

    The mIning operations of Bougainville Copper Pty. Limited are located at Panguna on the Island of Bougainville which is part of the Territory of Papua and New Guinea.C.R.A. Exploration Pty. Limited fi

    Jan 1, 1971

  • AUSIMM
    Plant Trial of an Under-belt Capacitance and Gamma-Ray Backscatter Gauge for on-Belt Determination of Moisture in Coal

    A non-contacting under-belt capacitance and gamma-ray backscatter technique has been developed for the on-line measurement of moisture in coal. In this technique, moisture was correlated with radio fr

    Jan 1, 1989

  • AUSIMM
    The impact of classification efficiency on comminution and flotation circuit performance

    By J J. Frausto, G R. Ballantyne, M S. Powell, R Cruz, K Runge

    Hydrocyclones are the most widely used device for classification in a grinding circuit. However, even the most efficient hydrocyclone has a bypass of fines from the feed to the underflow which reduces

    Sep 11, 2017