Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021

  • AUSIMM
    Ventilation Considerations for the New Level Mine Project Access Tunnels

    By E Acu±a, B Prosser, R Alvarez, K Wallace

    This paper describes the ventilation analyses performed for the access tunnels at the New Level Mine project (NLMP) at CodelcoÆs El Teniente operation outside of Rancagua, Chile. This new mine is anti

    Jul 1, 2013

  • AUSIMM
    Why Reinvent the Wheel when there are Established Methodologies to Aid the Design and Assessment of Restored Natural Ecosystems on Mined Land?

    By R N. Humphries

    The aim of this paper is to question the need to develop bespoke monitoring and assessment methodologies and criteria, thereby ‘reinventing the wheel’, when designing and assessing the success of impo

    Jul 16, 2014

  • AUSIMM
    Development of State-of-the-art Connection Types for Pipe Umbrella Support Systems

    By G M. Volkmann

    Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l

    Sep 17, 2014

  • AUSIMM
    Inclined Troughed Belt Conveyor Systems for Underground Mass Mining Operations

    By A G. L Pratt

    Inclined troughed belt conveyors are more frequently being selected from a range of alternatives, which include shafts and trucks for ore haulage in underground mass mining projects. Belt conveyor hau

    Jan 1, 2008

  • AUSIMM
    Stakeholder Engagement – Who Are You, What Do You Stand for and Why?

    By R M. Lonsdale, M D. Goodz

    "With an ever-increasing dynamic business environment, successful stakeholder engagement is becoming more fundamental to achieving desired outcomes in today’s mineral resource industries. It is impera

    Jun 22, 2016

  • AUSIMM
    Reviving the Inglewood Goldfield in Central Victoria û Exploration and Operations

    The Inglewood Gold Project consists of several titles in and around the Inglewood and Wedderburn Goldfields which were purchased from Strata Mining Corporation (now Excalibur Mining Corporation). The

    Jan 1, 2008

  • AUSIMM
    Segregating tailings – effects on density and water retention

    By K Seddon

    Segregation of tailings on deposition can occur as a result of a) sub-aqueous deposition, and b) sub-aerial deposition at lower solids concentrations (i.e. when the solids concentration is less than t

    Jul 23, 2018

  • AUSIMM
    Moving mORE for Less

    By G Brudek, P Elestedt

    Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck

    May 9, 2016

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricades

    By M Revell, B Sainsbury, D Sainsbury

    This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c

    Nov 29, 2022

  • AUSIMM
    Tailing Thickener Operability and Control Improvements at ProminentáHill

    By J Lombardi, M Weidenbach

    "OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township

    Oct 29, 2012

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Shifting the Cultural Paradigm for the Prevention of Catastrophic and Fatal Events

    By R Russell

    The relative infrequency of fatalities and other serious events can give them an appearance of being random, of being beyond any reasonable degree of anticipation and prevention. In fact, the vast maj

    Nov 20, 2012

  • AUSIMM
    Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)

    By D Bruce, D Cox

    The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock

    Mar 15, 2021

  • AUSIMM
    Creating the Optimal Coal Working Section

    By P Lukic

    The definition of the working sections that will be used in a mine is usually initially made in the field by the geologist supervising the drilling program. These initial definitions are often made on

    Sep 26, 2011

  • AUSIMM
    A Geostatistical Contribution to Assess the Risk Embedded in Resource Classification Methods

    By J F. C L Costa, J C. Koppe

    It is recognised by the major international codes that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological and grade con

    Jan 1, 2009

  • AUSIMM
    The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine Tunnels

    By E P. O’Dwyer

    Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust

    Sep 17, 2014

  • AUSIMM
  • AUSIMM
    Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in Queensland

    By T R. Anderson, A R. Butler

    Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis

    Jun 28, 2016