Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Draw Control Optimisation along the Production Drift in Sublevel Caving Mines

    By A Gustafson, G Shekhar, P Boeg-Jensen

    The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend

    May 9, 2016

  • AUSIMM
    Trends in real‐time instrumentation and monitoring techniques for tailings dams

    By L Clarkson, D Williams, P Redcliffe, F van der Wal

    This research presents a snapshot and insight into the trends, patterns, and common considerations identified in the current standing of real-time tailings dam monitoring practice. Based primarily on

    Jul 1, 2021

  • AUSIMM
    Production Drill Optimisation at Telfer Underground - A Move Towards Automation

    By P F. Knights, P Boniwell

    This paper investigates the causes of low effective utilisation of the production drill fleet at the Telfer Underground Gold Mine, as measured by the percussion hours per shift. The first part of this

    Jan 1, 2008

  • AUSIMM
    Automatic Material and Boundary Layer Detection During the Process of Mining on a Bucket Wheel Excavator

    By V Gau, L Overmeyer, M Kesting

    Economically efficient mining processes can be significantly assisted by the implementation of sensor technologies for the detection of materials and boundary layers between materials inside the strat

    Sep 26, 2011

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    Legacy tailings dams – asset or liability? A case study on sub-aqueous tailings reclamation

    By M Jones

    Legacy tailings storage facilities exist within operating mine sites across Australia. These tailings storage facilities are often viewed as rehabilitation liabilities but with considered assessment m

    Sep 1, 2024

  • AUSIMM
    Mass Blasting for Mine to Mill ù The AT04 Mass Blast, Kanowna Belle Gold Mine

    By D Kay, M Lovitt

    Mass Blasts are generally required at the completion of longhole stoping cycles to maximise the recovery of ore from a specific orebody. During the course of mining, the practice is to leave pillars o

    Jan 1, 2002

  • AUSIMM
    Low Density Explosives - A Product that Requires Some Rule Changes

    The basic make-up of the majority of currently produced bulk explosives has changed little in the last 20 years. These explosives would be described as mature in a life cycle analysis. Therefore these

    Jan 1, 2007

  • AUSIMM
    Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865

    TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.

    Nov 25, 2010

  • AUSIMM
    Probabilistic Slope Design and its Use in Iron Ore Pit Optimisations

    The current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v

    Jan 1, 2009

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Paper No. 122. The Employment if Unskilled Labour in Mines And The Necessity For Training to The Miner's Occupation.

    The subject of my paper is one which, I am certain, has exercised the mind of every man on whom depends the safe and economical conduct of mining operations; particularly in this district where the en

    Jan 1, 1903

  • AUSIMM
    The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modelling

    By E Asakpo, S Chaffer, A Heath

    Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin

    Aug 29, 2018

  • AUSIMM
    Independent Decline Haulage at Kanowna Belle Gold Mines

    In May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w

    Jan 1, 2002

  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron Deposit

    By G Hall

    BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo

    Jan 1, 2002

  • AUSIMM
    The Pebble Copper-Gold-Molybdenum Porphyry Deposit, South-West Alaska, USA

    By C M. Rebagliati, J G. Payne, K Roberts

    The Pebble deposit, located in south-west Alaska, is one of the largest Copper- Gold-Molybdenum (Cu-Au-Mo) porphyry systems in the world, with a current resource of >8 billion tonnes which contain

    Jan 1, 2008

  • AUSIMM
    The Implementation of FloatStar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation Circuits

    By D Phillpotts, S M. Mantsho, P Strobos

    A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical

    Oct 29, 2012