Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quantitive Geophysical Log Interpretation for Geotechnical and Geological Assessment of Coal Measure Rocks

    By R Turner, P Hatherly, T Medhurst

    Borehole geophysical logging data are routinely acquired during exploration of coal deposits in Australia. These data are commonly used qualitatively to identify and correlate coal seams and geotechni

    Jan 1, 2006

  • AUSIMM
    DeGrussa Copper Mine – mine closure experience

    By M Bellamy

    The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first

    Mar 29, 2023

  • AUSIMM
    Safety Support Functions for Underground Network Communications

    By A Noack

    Today underground infrastructures, like tunnels and especially wide spread underground mines, are often equipped with ethernet based communication systems. These networks are used for the unified comm

    Sep 26, 2011

  • AUSIMM
    Use of Field Portable X-Ray Fluorescence Spectrum Analysers for Grade Control ù A Presentation of Case Studies

    By S Ramsay, D Povey

    This paper presents recent case study data collected by field portable x-ray fluorescence spectrum analysers (FPXRF) as part of grade control activities at three separate (nickel, copper and copper/go

    Jan 1, 2003

  • AUSIMM
    Technology integration for tailings storage facility construction

    By A R. Hollis, M Heddon

    The safe life cycle of a Tailings Storage Facility (TSF) is founded on the fundamentals of proper design, construction, operation and closure. Leinster Nickel Operations (Leinster) utilises four activ

    Jul 1, 2021

  • AUSIMM
    Mobile Miner MM130 - A Mining Innovation

    The Mobile Miner MM130 (Figure 1) is designed to tunnel or mine in hard rock. It has a 4.1 m diameter cutterhead mounted on a horizontal axis which in turn is perpendicular to the line of the machine.

    Jan 1, 1993

  • AUSIMM
    El Teniente New Mine Level Project

    By R Pozo, F Reyes

    Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo

    Jan 1, 2008

  • AUSIMM
    Notes on Black Star Copper Orebody

    In this paper is given a general description of the Black Star copper orebody, its relation to the lead orebodies and the controlling factors in the mineralisation.Copper ore, in the form of chalcopyr

    Jan 1, 1953

  • AUSIMM
    The Loy Yang Overburden System

    The Loy Yang Overburden System initially consists of a 60 000 tonne/day Bucket Wheel Excavator (BWE) (No. 14), a 2 m wide Conveyor System and a Travelling Stacker (No. TS4). The paper discusses deta

    Jan 1, 1982

  • AUSIMM
    Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project

    By D P. Sainsbury, J Western, B L. Sainsbury, V Mutton, P E. Petrie

    Remnant rib pillars at Castlemaine Goldfields Ltd’s Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-vi

    Nov 5, 2014

  • AUSIMM
    Gold Particle Characteristics in Narrow Vein Deposits - Implications for Evaluation and Metallurgy

    By I M. Platten, Y Xie

    Narrow vein gold mineralisation generally contains both fine (<100 ¦m) and coarse (>100 ¦m) gold particles. The in situ size and shape, deportment, distribution and abundance of the particles co

    Jan 1, 2008

  • AUSIMM
    The Characteristics And Interpretation Of Regional Magnetic And Gravity Fields In The Broken Hill District

    One of the most praninent Bouguer anomaly features in the Broken Hill District is the long wavelength high of 10-15 ngals above background which forms a northeast trending, oval zone sane 15 km by

    Jan 1, 1983

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Structural Geology of the Emily Ann Nickel Deposit and Implications for the Mining Process

    By R Buerger, D Barrett, P Hodkiewicz

    The Emily Ann nickel mine is owned and operated by LionOre Mining International Ltd. The deposit was discovered during 1997 and is blind, concealed beneath 25 m of transported cover and a further 100

    Jan 1, 2003

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Improvements to Reinforcement Systems Through Dynamic Testing

    By A Thompson, E Villaescusa

    The Western Australian School of Mines (WASM), Kalgoorlie, has been performing dynamic testing of reinforcement systems as part of the Minerals and Energy Research Institute of Western Australia (MERI

    Jan 1, 2008

  • AUSIMM
    Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-extraction in the South Deep Section, Western Areas Gold Mine

    By S Z. Petho

    The South Deep surface shaft system is being sunk to a final depth of 2750 m below surface and on completion will be the deepest single drop shaft in the world. The shafts will intersect the target re

    Jan 1, 1998

  • AUSIMM
    Bulk Explosives go Tunnelling in Hong Kong

    The constructionhunnelling industry in Hong Kong has taken an upturn during the last few years due to the commencement of works to relocate the International Airport to Chek Lap Kok Island. The Airp

    Jan 1, 1994

  • AUSIMM
    Setting new standards at Kanmantoo – effective grade control procedures

    By M Reid, H Arbon

    Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an

    Sep 20, 2017

  • AUSIMM
    Australian Mining Legislation - A Land Management Concept

    The Australian Mining Industry Council (A.M.I.C.) was established in 1967 as a body to co-ordinate the interests of the mining industry on a nation-wide basis. Its member- ship now embraces the grea

    Jan 1, 1974