Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical TechniquesBy D J. Bradshaw, B Lottermoser, A Parbhakar-Fox
"Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency
Sep 29, 2013
-
Application of Optimisation Technology to Resource Planning Within BHP Billiton Iron OreBy D Xu
BHP Billiton Iron Ore is one of the world’s premier suppliers of iron ore. It currently has operations in Western Australia and Brazil and also has some iron ore interests in West Africa.BHP Billiton’
Jul 11, 2011
-
Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)By M P. Murphy, C M. D Barton
When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t
May 24, 2023
-
Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG MillBy R A. Pax, B Cornish
"Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly
Oct 10, 2016
-
Muck Pile Shaping for Draglines and Dozers at Surface CoalminesBy M Nagarajan, S Esen
This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang
Aug 24, 2015
-
Evolution of rock fill consolidation at Pajingo Gold MineBy J Carswell, K McTyer
The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product
Nov 30, 2018
-
Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the PitBy D Gerrard, J Begelhole, J Gerber
The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir
Jul 13, 2015
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
Justifying Slope Design Risks and CostsBy N M. Player, R P. Varden, E Jones
"An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t
Nov 15, 2016
-
ROES® – Automated Rock ExtractionBy I Gipps
A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur
Nov 22, 2011
-
Sampling for the percentage moisture in the iron ore industryBy M Fritz, B Ziegelaar
"For moisture samples, the International Standard for iron ore sampling states the following: Moisture samples shall be processed as soon as possible and test portions weighed immediately. If this
May 9, 2017
-
Redefining Competent Persons Criteria for Resource GeologistsBy J Coombes
There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an
Aug 18, 2014
-
The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold MinesBy D Hillier, A Giblett, K Parker, V Ramsell
Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo
Oct 29, 2012
-
Structural Aspects Of Cemented Fill BehaviourDesign of cemented fill in mining is often carried out without any consideration of the structure of the fill. The composition of cemented fills varies in the stopes due to the placement method, an
Jan 1, 1973
-
Direct Detection of Buried Orebodies Using GradiometryBy R Paterson, A Christensen
The routine use of gravity gradiometry for the detection of orebodies with no outcrop is now being undertaken. The commodities and orebody styles range from banded iron ore formations to volcanogenic
Sep 26, 2011
-
A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold MineBy M Brockman, M Cowan, A Robeson
"Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and
Nov 15, 2016
-
Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water QualityBy N Taylor, P Hewitt
The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet
Sep 17, 2014
-
Bulk carrier vessel tracking automation – the Dalrymple Bay use caseBy W Russell, P Wighton, J Franke
Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled
Nov 8, 2021
-
Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding CircuitsBy G Lane, M Bueno
In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing
Oct 29, 2012
-
Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian ExampleBy A Fitzpatrick
An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa
Jul 10, 2012