Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Spatial Planning and Interface Issues for Mechanical and Electrical Facilities in Road Tunnels

    Mechanical and electrical (M&E) systems in road tunnels are constrained by the traffic envelope and the construction profile. Whilst these spatial constraints are often ælocked inÆ early in the de

    Jan 1, 1999

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Monitoring of M10000 IsaMill™ Process Performance by Passive Acoustic Emissions

    By A McEwan, J Masters, C A. Jackson, A Catanzano, V Sharp, M Millen, S Rainey, S J. Spencer, G Roberts

    A passive acoustic emission (AE) monitoring system has been developed and trialled on two M10000 IsaMillsTM. The analyser detects AE stress waves generated by grinding media impacts with the mill line

    Sep 1, 2014

  • AUSIMM
    Design of Equipment for Dynamic Burden Measurements

    By D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer

    The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa

    Aug 24, 2015

  • AUSIMM
    Regulation of Overland Flow in Queensland - Implications for the Mining Industry

    By K Marler

    The Water Act 2000 includes provisions to manage the take of overland flow water. Overland flow water is water that runs across the land after rainfall either before it enters a watercourse, after it

    Jan 1, 2006

  • AUSIMM
    Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processing

    By S Fityus, K Koosmen, J Simmons

    The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for

    Jul 1, 2021

  • AUSIMM
    Design of a Steel Fibre Reinforced Concrete Segmental Tunnel Lining - City West Cable Tunnel Project, Sydney, Australia

    By A Kuras

    Segmental tunnel linings are becoming more common in Australia. One current project employing a segmental lining is the City West Cable Tunnel (CWCT) in Sydney. The project has been commissioned by En

    Jan 1, 2008

  • AUSIMM
    Urban Tunnelling Challenges - Mechanised Tunnelling to Improve Life Quality in Cities

    By U Rehm

    The biggest hard rock double-shield tunnel boring machine (TBM) in the world, with a diameter of 12.4 m, is currently excavating the North-South Bypass, which includes a crossing under the Brisbane Ri

    Jan 1, 2008

  • AUSIMM
    The Perseverance Gold Deposit ù The Next Step at Peak

    By R Berthelsen

    The Peak Gold Mines Pty Ltd (PGM) operations are located approximately 9 km south of Cobar, NSW. PGM currently mines and treats ore from three separate orebodies within 5 km of the original plant. Pro

    Jan 1, 2004

  • AUSIMM
    Preparing for Uncertain Mineral Futures - A Survey of AusIMM Members on the Future Issues and Drivers for the Australian Minerals Industry

    By C Mason, A Littleboy

    This paper presents the results of a large scale survey of The Australasian Institute for Mining and Metallurgy (AusIMM) membership. This survey aimed to understand and define the key issues and drive

    Jan 1, 2009

  • AUSIMM
    The Selection of Granular Activated Carbon for use in a Carbon-in-Pulp Operation

    By Tumilty JA, Douglas WD

    With a view to characterising activated carbons with respect to their ability to adsorb gold from cyanide solutions, an attempt was made to establish correlations between the equilibrium capacity co

    Jan 1, 1982

  • AUSIMM
    Current Studies of Practical Rock Mechanics in Underground Mining in Australia

    By K J ROSENGREN

    Underground rock mechanics was initiated as a formal discipline in Australia by early studies for underground structures for the Snowy Mountains Scheme in the 1950s. These techniques were quickly e

    Jan 1, 1992

  • AUSIMM
    Feature if the New Lead Refinery at Port Pirie

    A new lead refinery with a. capacity of 230,000 tons per year com-menced operation at*Port'Plsie in October, 1959. This plant' superseded the refinery which had operated from 1933 with the a

    Jan 1, 1963

  • AUSIMM
    Development of Inhibitors to Reduce the Spontaneous Heating Susceptibility of Indian Coals

    By R S. Sing, M D. Yadav, G Udaybhanu

    This paper presents the results of the first part of a research project to study the effect of various inhibitors to reduce the spontaneous heating susceptibility of some highly susceptible Indian coa

    Jan 1, 2005

  • AUSIMM
    Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project

    The purpose of the Lower Lea Valley Cable Tunnel project is to relocate the overhead power lines circuits, which currently cross the proposed site for the 2012 London Olympics in East London. This was

    Jan 1, 2008

  • AUSIMM
    Project Selection and Process Development for Mining Juniors

    By L Lorenzen, H Muller

    "Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th

    May 24, 2012

  • AUSIMM
    Design, Construction, Commissioning And Operating Of the Elura Concentrator

    By Morrison R. D

    This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co

    Jan 1, 1983

  • AUSIMM
    Geometallurgy – Beyond Conception

    By L O’Connor, S C. Dominy

    "Geometallurgy is an important addition to any evaluation project or mining operation. As a discipline, it seeks to maximise the net present value (NPV) of an orebody while minimising technical and op

    Jun 15, 2016

  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    Research on in situ recovery technology of hot-dip galvanised dross

    By X Li, R Chu, X Deng

    The hot-dip galvanising industry is the largest consumer of zinc, with over 40 per cent of the world’s total annual production of zinc used for galvanised steel. The dross generated in the hot-dip gal

    Jun 19, 2024