Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Traffic and Emission Modelling for Surface Roads near the Lane Cove Tunnel Corridor
The Lane Cove Tunnel (LCT) is an important infrastructure link in New South Wales (NSW) and runs from the end of the Gore Hill Freeway at Artarmon at its eastern extremity, to the end of the M2 at Nor
Jan 1, 2008
-
Development of the 1 in 5.3 Conveyor Decline at Ridgeway Gold Mine
Located 350 km west of Sydney and 20 km outside Orange, NSW, lies the Ridgeway Gold Mine û NewcrestÆs flagship Underground Gold Mine. Key to success at Ridgeway has been the fast tracked development o
Jan 1, 2002
-
Aluminothermic production of silicon using different raw materials
By M Zhu, G Tranell, N Simkhada, K Jakovljevic, M Wallin
Silicon is a vital element in many products today, such as electronic components, solar devices, high-quality alloys, and many others. The growing global demand highlights the need for the development
Jun 19, 2024
-
Phosphorous Removal from Iron Ore with a Low Temperature Heat Treatment
By R R. Lovel, G J. Sparrow
Currently there are large reserves of good quality iron ore near to existing infrastructure that are not being developed because the phosphorous levels are above acceptable market specifications. Sinc
Jan 1, 2009
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study
By P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Quantitative airblast risk assessments for block and sublevel caves
By C Vejrazka1
The occurrence of airblasts is one of the principal mining hazards in caving operations between the time of cave establishment and breakthrough of the cave to surface. As such, it needs to be managed
Oct 12, 2022
-
Building AsiaÆs Latest Hard Rock Mine
By T J. V Duffy, L H. D Siahaan, P G. Albert
G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard
Nov 20, 2012
-
A 3D Discrete Event Simulation Model of a Truck-shovel Network System
By W Zeng, D Walker, D Cai, E Baafi
"The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv
Nov 15, 2016
-
Truck Fleet Utilisation and Fuel Saving in Aitik
Aitik, a Boliden owned and operated open pit mine located in northern Sweden, will expand production from 18 Mt per year today to 36 Mt per year copper ore during 2010. The challenge for the mine oper
Jan 1, 2007
-
Comparison of Multivariate Conditional Simulation Methods at the Yandicoogina Iron Ore Deposit
Geostatistical conditional simulation is a method to assess variability and risk in mineral deposits and the tool has wide potential applications in the iron ore industry. Correct reproduction of mult
Jan 1, 2007
-
Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator
In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi
Jan 1, 1991
-
Stope Cleaning - Historical Methods
In classical drill and blast underground mining methods, especially narrow vein operations economic quantities of broken ore can be left behind following normal mucking operations on the stope floors.
Aug 1, 2010
-
Gwalia Consolidated Ltd - Success Through Diversity in Strategic Metals and Industrial Minerals
Gwalia Consolidated Ltd has been in the mining industry for about 15 years, yet its key wholly owned Greenbushes Mine has a history dating back to the last century. Similarly Gwalia Consolidated&apo
Jan 1, 1996
-
Towards grade engineering using X-ray microtomography
By K Barbosa, G Wilkie, F Reyes, V Jokovic, C Evans
The idea behind Grade Engineering is to exploit the natural heterogeneity of an orebody (spatial, temporal) in order to divert low-value waste out of the mining value chain. Essentially, this involves
Aug 24, 2022
-
Value Impacts of Truck Limited Scheduling
By P G. Doig
Recent drops in commodity prices and economic uncertainty have seen many businesses re-evaluate their operational expenditure to ensure mine profitability. The high capital and operational cost of tru
Jul 16, 2014
-
Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD Modelling
By A Manzoori, M T. Shadloo
This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part
Jan 1, 2006
-
A Banker's View of Cash Flow Methods in Mineral Valuation
Banks' focus in using cash flow methods can differ markedly from that of equity investors. This paper attempts to explain and describe bankers' approach by: ò outlining the fundamental dif
Jan 1, 1994
-
Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand
By D Craw, P V. Angus
Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre
Jan 1, 1999
-
Ambient Temperature Oxidation of Enargite
By N J Welham
A commercial enargite concentrate was mechanically milled in inert and oxidising atmospheres for 10 hours. No substantial effect was observed in either an inert atmosphere or in air other than a broad
Jan 1, 2001
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia
By B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014