Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design of the West Fork Mill

    The West Fork project is located in Reynolds County, Missouri, in the mineralized zone referred to as the Viburnum Trend. The West Fork orebody has a calculated ore re- serve of 13 600 000 tonne (1

    Jan 1, 1978

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York City

    By A Fareth

    Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri

    Jan 1, 2008

  • AUSIMM
    Overseas Research Directions

    The Australian Mineral Industry's growth in the last two decades is directly related to the skill and experience of its consultants in mining, metallurgy, geology, finance, management, marketing

    Jan 1, 1986

  • AUSIMM
    Inferred Mineral Resources and Gold Veins - Discussion and Case Studies

    Classification within the Inferred Resource category is based on geological judgement and the balance of extrapolation versus interpolation that the Competent Person is prepared to accept. These resou

    Jan 1, 2006

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • AUSIMM
    Textural Characterisation of Manganese Minerals to Improve the Geometallurgical Characterisation of Ferromanganese and Iron Ores

    By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi

    The occurrence and deportment of manganese in a number of ferromanganese and Mn-bearing iron ore samples from supergene-upgraded deposits, as well as from magnetite banded iron formation (BIF) and mag

    Aug 12, 2013

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    A generalised form of Gy’s equation for gold ores – empirical evidence

    By R C. A Minnitt

    The two methods for calibrating the parameters K and (alpha) for use in Gy’s equation for the fundamental sampling error (FSE), the duplicate sampling analysis (DSA) and the segregation fractionalised

    May 9, 2017

  • AUSIMM
    Olympic Dam Operations Review

    The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y

    Jan 1, 1998

  • AUSIMM
    A Flotation Study for Effective Separation of the Heavy Mineral Sands

    By Takiuchi T, Kurita M, Owada S

    This paper describes the possibility of the application of flotation to the separation of monazite from xenotime and of columbite from ferberite, which have been said to be difficult with generally

    Jan 1, 1993

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011

  • AUSIMM
    Newmont Tanami Operations – Tailings Storage Facilities

    By S Thacker, M Noakes

    The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and

    Jul 27, 2015

  • AUSIMM
    Public reporting – new standards or no standards?

    By J Coombes, R Sterk

    The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating

    Sep 20, 2017

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    Geology and Mineral Potential of the Ranger Project Area, Northern Territory

    The Ranger Project Area covers 78.6sq km and is approximately six km east-west by 14km north-south (Fig. 1). The area is known to con- tain two uranium orebodies, Ranger No. 1 and No. 3, two uraniu

    Jan 1, 1984

  • AUSIMM
    Mining of the Fitzpatrick Orebody, North Mine, Broken Hil, NSW

    By Kidman B. E

    The Fitzpatrick area is the deepest section of the North Mine, with the orebody located between 1450 and 1800 m below the surface and some 600 m NE of the main No. 3 Shaft orebody and separated fr

    Jan 1, 1988

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004