Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study
By P. Tsang
The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different
Jan 1, 1989
-
Subsidence prediction using a laminated linear model
By Miklos D. G. Salamon
If all stratifications are horizontal, the computation of surface deformation induced by coal mining involves the prediction of roof and floor convergence and then the transfer of the effects of this
Jan 1, 1989
-
Monitoring Subsidence Over Submarine Coal Mines In The Sydney Coalfield By Bathymetric Methods
By David Forrester
Subsidence beneath the land surface has traditionally been monitored using the most accurate surveying methods of the day. Over the several hundred years of subsidence investigation, these techniques
Jan 1, 1996
-
Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow Cylinder
By Gilles Rousset
This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh
Jan 1, 1989
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)
By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009
-
Analysis Of Rockbolt Performance At The Waste Isolation Pilot Plant
By Liane J. Terrill
Rockbolt failures at the Waste Isolation Pilot Plant have been recorded since 1990 and are categorized in terms of mode of failure. The failures are evaluated in terms of physical location of installa
Jan 1, 1995
-
Laboratory And Field Characterization Of Immediate Floor Strata In Illinois Basin Coal Mines
By Yoginder P. Chugh
The characteristics of weak floor strata associated with actively mined coal seams in Illinois are very important from ground stability point of view and, in many cases, are the governing factors in d
Jan 1, 1989
-
Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)
By A. T. Iannacchione
Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea
Jan 1, 2009
-
Research on the Interaction Between Roof Strata and Shield Supports
By Yuanwci Shi
This paper discusses the results of research on the interaction between roof strata and shield supports including the active and passive supporting functions of the shield supports which prevents roof
Jan 1, 1997
-
Ground Control and the Inundation of the Retsof Mine
By Vincent A. Scovazzo
On March 12, 1994, the 1,100-foot deep 2 Yard South panel of the 1l0 year-old Retsof Mine collapsed. At the time of this occurrence, the Retsof Mine was characterized as the world's largest, most
Jan 1, 1997
-
Effect Of Water On Stability Of Mine Roadways
The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many road
Jan 1, 1996
-
Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping Seam
By M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.
Jan 1, 1996
-
Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring
By Peter (Yunqing) Zhang
Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution
Jan 1, 2006
-
High Horizontal Movements In Longwall Gate Roads Controlled By Cable Support Systems
By Dennis R. Dolinar
Controlling coal mine roofs subjected to high-horizontal stress conditions has always been difficult and uncertain. Traditional supports such as wooden cribs and posts, concrete donut cribs, and stand
Jan 1, 1996
-
Effects of In-seam and Near-seam Conditions and Asymmetric Pillar Loading on Coal Pillar Strength
By Daniel W. H. Su
The importance of incorporating fundamental principles of rock material response and failure mechanics into a pillar strength design model has been demonstrated. To accurately assess pillar strength,
Jan 1, 1997
-
Failure mechanisms in ultra-close seam mining
By Yingxin Zhou
Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie
Jan 1, 1989
-
Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)
By Kray Luxbacher
Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.
Jan 1, 2007
-
Three-Seam Interaction: A Case Study
By N. P. Kripakov
Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath
Jan 1, 1996
-
Estimation of in-situ material strength
By Danell. R. E.
A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com
Jan 1, 1989
-
Recent UK Experience of Working above Previously Extracted Longwalls
By David Bigby
In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros
Jan 1, 2007