Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Terrorism and the Mining Industry

    By A. Dale Wunderlich

    Since Sept. 11, 2001, the author has been asked by several mining companies and mining publications to share some of his insights on how the terrorist attacks on the World Trade Center (WTC) and Penta

    Jan 1, 2002

  • SME
    Dry Grinding Experience at the Cortez Gold Mine

    By Garry Keizer

    The Cortez gold mine is located in Lander County, NR, about 130 km (80 miles) southwest of Elko. Cortez Gold Mines (CGM) is a joint venture between Placer Dome US Inc. (60% operator) and Kennecott Cor

    Jan 1, 1993

  • SME
    Detection And Control Of Calcium Sulfate Precipitation In The Lead Circuit Of The Hilton Concentrator Of Mount Isa Mines Limited, Australia

    By P. L. M. Wong, N. W. Johnson

    Surface analysis by X-Ray Photoelectron Spectroscopy (XPS) of samples taken from the galena flotation section of the Hilton Concentrator of Mount Isa Mines Limited are presented. Flotation rate and pu

    Jan 1, 1995

  • SME
    National Western Mining Conference Attendance Mirrors Industry’s Upswing

    By Steve Kral

    For a state whose roots are in mining, most Colorado residents probably do not realize that the industry still contributes heavily to the state’s economy. In 2005, the industry contributed, directly

    Jan 1, 2006

  • SME
    A Review Of Tunneling Difficulties In Carbonate Sedimentary Rocks

    By D. P. Richards

    Tunneling in carbonate sedimentary rocks such as lime stones and dolomites can be difficult when solution channels or voids are anticipated. Addressing the risk aspects associated with these formation

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • SME
    Floodplain Aggregate Mining In Western Oregon (b3a583d5-3e7a-4dd2-84c0-16936e808842)

    By E. F. Schnitzer, P. J. Wampler

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an

    Jan 1, 1999

  • SME
    Piedras Verdes: Mexico?s Newest Copper Mine

    By P. J. Rua

    The Piedras Verdes copper mine is a new run-of-mine (ROM), heap leach, solvent-extraction/electrowinning (SX-EW) operation located 21 km (13 miles) north-northwest of the town of Alamos in the state o

    Jan 1, 2008

  • SME
    International education of mining engineers ? an update on the Australian experience and international opportunities for collaboration

    Collaboration between education providers is the key to long-term sustainability and improved quality in mining education. The mining industry is now, more than ever, an industry doing business on a g

    Jan 2, 2010

  • SME
    Semi-Autogenous Grinding (SAG) Mill Liner Design And Development

    By D. Royston

    SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic

    Jan 1, 2007

  • SME
    An Algorithm For Analyticalsolutions And Analysis Of Mineral Processing Circuits

    By A. Noble

    Traditional simulations of mineral processing circuits are solved by straightforward numerical techniques which require iteration to accommodate recirculating loads. Depending on the complexity of the

    Jan 1, 2012

  • SME
    Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? Introduction

    By I. Ocak

    Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme

    Jan 1, 2011

  • SME
    Longwall Control At Shoal Creek

    By Debasis Deb

    The first version of the longwall strata control and maintenance system (LSCMS) has been successfully developed by the Strata Control Re¬search Team at the University of Alabama. The system includes a

    Jan 1, 1997

  • SME
    Annual Review 2005 – Mining Review

    By P. A. Plunkert, D. E. Morse, L. McCartan, J. F. Papp

    The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several stages —basic (mining), intermediate processing, manufacturing of fini

    Jan 1, 2006

  • SME
    Queens Bored Tunnels, East Side Access, New York

    By David Smith, Bernie Martin

    The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr

    Jan 1, 2005

  • SME
    Industrial Minerals 2004 – Pumice and Pumicite

    By G. C. Presley

    Estimated domestic production of pumice and pumicite in 2004 increased about 23 percent since 2003, according to the U. S. Geological Survey (USGS). The USGS estimate of domestic production of 687 kt

    Jan 1, 2005

  • SME
    The Issue of Collecting and Reporting SD Indicators in the Minerals Sector from the Point of View of Small and Medium-Sized Companies and those not Publicly Traded

    By C. Sykes, E. Turner, M. Wyart-Remy

    This paper follows that of the Milos Conf, 2002 and examines the collection and reporting of SDIs in the industrial minerals industry in Europe. It compares the characteristics of the GRI Reporting Gu

    Jan 1, 2005

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • SME
    Use of Simulation to Validate Load And Haul Requirements at Cortez Gold Mines

    By W. L. Jacobsen, T. L. Dyer

    Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o

    Jan 1, 2006

  • SME
    Pump Phase Shift Control in the World’s Largest Iron Ore Concentrate Pipeline

    By Ralph van Rijswick, Erik Vlot

    "Anglo American operates 18 Weir GEHO piston diaphragm pumps (PD) in the two pump stations of the 52-km (32-mile) long Minas Rio iron ore concentrate pipeline. The pipeline is designed to transport 26

    Jan 9, 2017