Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Towards more effective simulation of CIP and CIL processes. 3. Validation and use of a new simulatorBy L. Woollacott, R. P. King
This paper presents data collected from full-scale plants in order to verify the predictions of a new simulator of CIP or CL operations. Good agreement was found between the experimental data and the
Jan 1, 1990
-
The production of steel for flat products in large ultra-high-powered furnacesBy B. Strohmeier
The role of large, ultra-high-powered arc furnaces in a fully integrated steelworks for the production of flat products is outlined, and an account is given of the technological improvements that have
Jan 1, 1985
-
Note: Melting techniques in the iron foundryBy J. T. Davies
Note: Melting techniques in the iron foundry by J. T. DAVIES* INTRODUCTION The selection of melting equipment for use in an iron foundry has for several years been the subject of numerous discussions,
Jan 7, 1976
-
The use of small cooling plants on a mineBy N. Thorp, S. J. Bluhm
It has long been recognized that the provision of an acceptable thermal environment minimizes the danger and the adverse effect of heat stress, which is directly linked to decreased productivity, incr
Jan 1, 1986
-
The effect of stope backfilling on the construction and operation of slimes dams in the gold-mining industryBy J. A. Wates
Stope backfilling in South African gold mines uses the coarser cyclone fraction of the gold tailings. The disposal of the overflow from the cyclones, which is finer and of higher moisture content than
Jan 1, 1988
-
Phase equilibria and thermodynamics in the lead-lead sulphide systemBy M. Timucin
High-temperature phase relations in the Pb-PbS system were established by the quenching of samples equilibrated in evacuated and sealed silica capsules. The liquid-miscibility gap seen in some previou
Jan 1, 1988
-
Energy changes in a rockmass containing multiple discontinuitiesBy J. A. L. Napier
SYNOPSIS Many tabular mining problems can be modelled effectively by displacement-discontinuity techniques, which can be extended directly to represent fracturing on discrete planes and movements on
Jan 1, 1991
-
Weakness Correlation and the Size Effect in Rock Strength TestsBy J. P. G. Pretorius
The size effect in tests of the compressive strength of coal specimens differs from predictions based on the Weakest Link theory. Predictions of the size effect in tensile tests on lengths of cotton y
-
The use of gravity and magnetic separation to recover copper and lead from Tsumeb flotation tailingsBy J. Svoboda, W. J. C. Venter, R. N. Guest
The use of gravity or magnetic separation followed by upgrading on a shaking table recovered about 25 per cent of the copper and lead minerals, at a combined metal grade of 20 per cent, from the final
Jan 1, 1988
-
Centenary Conference - AusIMMReviewer: P.R. Janisch The progress of mining and metallurgy in Australia and their contribution to that nation's economy closely parallel those of South Africa. Australia's was the se
Jan 1, 1993
-
The effect of cost and price fluctuations on the optimum choice of mine cutoff gradesBy J. A. L. Napier
An analytical solution to the best choice of cutoff grade for a mine is deduced for an assumed model of selective mining. It is found that this choice is determined by the constancy of a special funct
Jan 1, 1983
-
Biogeographical/Geobotanical and Biogeochemical Investigations Connected with Exploration for Nickel-Copper Ores in the Hot, Wet Summer/Dry Winter Savanna Woodland EnvironmentBy Monica M. Cole
The Empress nickel/copper deposit west of Gatooma in Rhodesia occurs within gabbro and amphibolite, disposed at the contact of a granodiorite stock (Barebottom Hill) and the surrounding greenstones of
-
The stability and design of yield pillars located at shallow and moderate depthsBy M. U. Ozbay
The stability of pillars is analysed on the assumption that pillars shed load in a stable manner if the slope the strata load-deformation relation is steeper than that of pillars in the post-peak regi
Jan 1, 1989
-
Cooling Power of Underground EnvironmentsBy Austin Whillier, Duncan Mitchell
The problem of heat stress underground in the gold mines is approached on the basis of the heat transfer between the human body and the underground environment. Experimental measurements of radiant an
-
Project-Finance Risks - Due Diligence Matters (3839e4bf-ab09-41fa-8ef1-1a8274c7f825)By R. Tinsley
Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/
Jan 1, 2007
-
Reply To The Comments Made By F.S.A. De Frey On The Paper 'Design Of Merensky Reef Crush Pillar'By B. P. Watson
The discussion written by Dr de Frey suggests that mine design should be based on closely spaced stability pillars. However, this concept leads to low extraction ratios at depth. The concept of `crush
Jan 1, 2011
-
Theory of Cold-Blast Iron Production with Stack-Gas of Low Nitrogen ContentBy Wm. Bleloch
SYNOPSIS The feasibility of rejection of nitrogen from stack gas by recycling of top-gas with cold-blast 95 to 98 per cent oxygen is assessed. It is concluded that nitrogen could be removed to a leve
-
The Assessment Of Seismic Hazards In MinesBy A. Kijko, C. W. Funk
Methods for the analysis of seismic hazards in mines are reviewed as illustrations of the techniques that are being used in some South African mines. The classical parameters that describe a hazard ar
Jan 1, 1994
-
Reef development with a tunnel boring machine on a South African platinum mineBy P. Horrell, K. Rhodes, G. Harrison, J. Dean, D. Sammons, M. Stander
Anglo Platinum have perceived a need to increase the rate of reef development both for new mechanised stoping technology and on conventional new developing mines. The Research and Development Division
Sep 1, 2001
-
Iron-Ore Sinter Produced From A Mix Containing Waste MaterialsBy P. A. Botha
The production of iron and steel generates various types of waste materials containing oxides, carbon, and flux material. Usually, these materials are land-filled at the plant site or are hauled away
Jan 1, 1993