Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro MatosoBy T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza
The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s
Jan 1, 2004
-
Feasibility study of electricity generation from discard coalBy A. Engelbrecht, B. North, B. Oboirien
"There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d
Jan 1, 2015
-
Rhodax Inertial Cone GrinderBy J. C. Taylor
The Rhodax inertial cone grinder, designed by France?s FCB Group Fives, is the result of three years, theoretical and mechanical research in the field of compression grinding by the research staff of
Jan 1, 1998
-
Prediction Of SiO2-Al2O3-Croxcomplex Inclusions In Steel Containing 16 Per Cent Cr-Si-Al-MnBy P. C. -H. Rhee, H. -G. Lee, J. -H. Choi, D. S. Kim, S. -B. Lee
In order to predict the composition of inclusions and to ascertain a method to prevent inclusions from forming in liquid Fe-16 mass Cr alloy, a thermodynamic database was developed through a quantitat
Jan 1, 2004
-
An Investigation Into The Optimization Of Personnel Transportation To Level 15 And Below At Khuseleka No. 1 Shaft, Anglo Platinum ? SynopsisBy M. S. P. Rampedi
The paper reports on a vacation work project conducted at Khuseleka No. 1 Shaft, Anglo Platinum, where there was a need to optimize the transport of personnel to level 15 and below. Approximately 900
Jan 1, 2012
-
A fuzzy logic based rippability classification system - SynopsisBy H. Basarir
Due to the environmental constraints and the limitations on blasting, ripping as a ground loosening and breaking method has become more popular in both mining and civil engineering applications. Becau
Jan 1, 2007
-
Occupational health and safety management toolBy T. Güyagüler, A. Güngör
Labour protection, that is prevention of occupational disease and reduction in the frequency of accident, has always been a matter of major concern of mining industry. Management and the government sh
Jan 1, 2003
-
Risk Assessment: An Opportunity To Change Health And Safety PerformanceBy P. J. Foster
A common theme running through recently introduced mining health and safety legislation in many parts of the world is risk assessment. Most recently, risk assessment legislation has been introduced ac
Jan 1, 1998
-
A Long Hole Stoping System For Mining Narrow Platinum Reefs - IntroductionBy P. van Dorssen
In South African metalliferous mines, stoping operations are largely confined to narrow, tabular orebodies making mechanization extremely difficult. Limited flexibility in terms of stope width has nec
Jan 1, 2002
-
Measurement of induced stress under high rock stress by compact conical-ended borehole overcoring techniqueBy K. Sugawara, H. -S. Jeong, Y. Ishiguro, J. Otani, Y. Obara, A. Hirata
A series of measurements of induced stress by the Compact Conical-ended Borehole Overcoring (CCBO) technique was performed within rock mass around a tunnel excavated in a region that an underground po
Jan 1, 2003
-
Energy considerations in the current PGM processing flowsheet utilizing new technologies ? SynopsisBy C. M. Rule
Energy efficiency is currently a significant area of interest due to the Eskom power situation, which led to severe power impacts to the PGM, and indeed whole SA primary industries, in early 2008. An
Jan 1, 2009
-
Computational fluid dynamic modelling of two phase flow in a hydrocyclone - SynopsisBy M. J. Leeuwner
Computational fluid dynamic (CFD) modelling is used to research the complex flow structures that exist in a hydrocyclone. By simulation of a two phase (water and air) flow system, the internal flow an
Jan 1, 2008
-
Improving Financial Returns From Mining Through Geostatistical Simulation And The Optimized Advance Drilling Grid At El Tesoro Copper Mine ? SynopsisBy J. M. Ortiz
Grade control and short-term planning are usually based on the samples obtained from blastholes. These samples may carry a large sampling and sample preparation error. At El Tesoro copper mine in nort
Jan 1, 2012
-
Managing the Tap-Hole Life-Cycle at Five Submerged Arc Furnaces Producing Silicomanganese at TransalloysBy J. P. Gous, J. J. Sutherland
"Transalloys is a silicomanganese (SiMn) producer located in South Africa, and uses only local manganese ores to produce SiMn alloy. The plant operates five open submerged arc furnaces (SAFs) with an
Jun 1, 2019
-
Sampling - A Critical Component To Gold Mining Project Evaluation (60ce14f9-844a-41ea-89be-138917950365)Poorly designed sampling protocols generally result in high project risk by artificially increasing grade variability (ie the nugget effect). Sample collection, preparation and assay protocols that su
Jan 1, 2007
-
Kinetic gold leach monitoring including cyanide speciation - SynopsisBy P. W. Lotz
Traditionally, bottle roll tests have been used to optimize the extraction process for best gold extraction and recovery. Such tests typically involve exposing the ore to defined reagent concentration
Jan 1, 2009
-
Stope deformation measurements as a diagnostic measure of rock behaviour: a decade of research - SynopsisBy D. F. Malan
This paper presents an overview of work conducted over several years to investigate the continuous stope closure profiles recorded in tabular excavations and the use of this data as a hazard indicator
Jan 1, 2007
-
An analysis of the practical and economic implications of systematic underground drilling in deep South African gold minesBy D. G. Krige
Using chip sample data and spatial structure parameters from a large mined-out section of a South African gold mine the advantages to be gained from a regular underground borehole drilling programme h
Jan 1, 2003
-
A Comparison of Limit Equilibrium and Numerical Modelling Approaches to Risk Analysis for Open Pit MiningBy H. T. Chiwaye
Risk analysis is an important step in the design of rock slopes in open pit mining. Risk is defined as the product of the probability of slope failure and the consequences of the failure, and is gener
Jan 1, 2010
-
Improving processing by adaption to conditional geostatistical simulation of block compositions"Exploitation of an ore deposit can be optimized by adapting the beneficiation processes to the properties of individual ore blocks. This can involve switching in and out certain treatment steps, or s
Jan 1, 2015