Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Extra Deep Cut-Off at 250 m Depth - A Case StudyBy Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
The Role Of Real-Time Instrumentation In Large Infrastructure ProjectsBy J. G. La Fonta
The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be
Jan 1, 2006
-
Execution of Diaphragm and Cut-Off-Walls in Rock – Applications, Performance and LimitsBy Albert Neumann, Franz-Werner Gerressen, Giancarlo Santarelli
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. In addition they are also quite often used as deep groundw
Jan 1, 2016
-
St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge ConstructionBy Bryan C. Field
The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department
Jan 1, 2009
-
Indicator Pile Program at Port of Oakland, CaliforniaBy Partha Sircar
"For Berth 22 modifications at the Port of Oakland, nearly 600 octagonal 24-inch ‘diameter’ precast-prestressed concrete piles were driven, some piles over 160 feet long. Prior to production pile driv
Jan 1, 2015
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky RiverfrontBy Theodore W. Vogelpohl
Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,
Jan 1, 2005
-
Remedial Method for Collapse Soil Foundation of Mosul DamBy Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
Drilled Displacement Piles - An Innovative Alternative to Typical Steel Driven PilesBy Patrick Granitzki, Alicia Plinio, Janitha Batagoda, Peter Howell
The City of Newark is making a comeback with new mixed-use multi-storied Residential Development projects. The majority of developers tend to use driven H-pile deep foundation systems to support their
Sep 8, 2021
-
Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile FoundationsBy Christian B. Woods, Joe C. Drumheller
"Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe
Jan 1, 2015
-
The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep FoundationsBy Beim Jorge, Piscsalko George
"Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi
Jan 1, 2015
-
Performance Specifications For Drilled PilesBy Dan Brown
Deep foundation contracting for transportation projects in the United States has typically followed the design-bid-build model in which contractors bid on a specific work product according to relative
Jan 1, 2006
-
Wet Soil Mixing For Foundation Support and Liquefaction Hazard Mitigation for the Ventura Cancer CenterBy Thang V. Nguyen, Lisheng Shao, Gary E. Taylor
"The Community Memorial Hospital of Ventura, California, proposed to build a new state-of-the-art Cancer Treatment Center with radiation shielding walls and roof. The loose silty soils at the site had
Jan 1, 2015
-
Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase IiBy Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.
The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris
Nov 1, 2022
-
Pile-Supported Raft Foundation System (fd70e68a-eb6f-470f-9fd8-5fc4c0cc8d20)By Mohab Sabry, Emre Biringen
"Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howev
Jan 1, 2017
-
Session 32 "Grout Mixtures and Materials 3"By Lois G. Schwarz
I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of
Feb 10, 2003
-
Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne InterchangeBy Travis Coleman, Elvis Ishimwe
Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic
-
Deep Foundation Support for the Iconic New York WheelBy Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran
"This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor
Jan 1, 2016
-
Behavior Of Pile Groups Arrangement Adjacent To A Sand Slope Under Lateral LoadBy Mohamed A. Sakr
An experimental study on the behavior of pile group's arrangement under lateral load was carried out in the level ground and at crest of sand slope 3H: 2V. Tests were conducted on single pile and
Jan 1, 2010
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002