Bored Piles With Base Preloading By Grouting - The Polish ExperienceBy Bolestaw A. Ktosihski
Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr
Jan 1, 2006
-
Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant StructureBy Tsunenobu Nozaki
"AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr
Jan 1, 2014
-
Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983By Bengt Fellenius
The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast
Jan 1, 1984
-
Uplift Capacity Of Drilled Piers In Clay - SynopsisBy Braja M. Das
Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat
Jan 1, 1987
-
"Value Engineering" In United States Of AmericaBy Maral Papazian Bedian
Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng
Jan 1, 2002
-
Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in ClayBy John S. McCartney, Ismaail Ghaaowd
This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally
Jan 1, 2018
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place PilesBy Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Piling Problems - IntroductionBy D. Millgard
Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.
Jan 1, 1991
-
List Of DelegatesAUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)By Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2013
-
Load Testing High Capacity Drilled Shafts - SummaryBy Jorj O. Osterberg
Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a
Jan 1, 2002
-
Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In MarlBy Gregory J. Canivan
Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and
Jan 1, 2002
-
Soil Mixing - Title ? Table Of ContentsJan 1, 2001
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USABy Rudolph P. Frizzi
This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary
Jan 1, 2003
-
Structural And Geotechnical Aspects Of Long Driven Piles For Urmiyeh Lake Causeway BridgeBy Mohammad Eslami
The Tabriz-Urmiyeh Highway shortens the distance of north-western cities of Iran by about 130 km, resulting in improved access and efficient transit between Iran and Europe through Turkey. The highway
Jan 1, 2010
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Modulus of Elasticity in Deep Bored PilesBy Carlos Lam, Joram M. Amir, Erez I. Amir
"Abstract The modulus of elasticity of pile material (E) is an important parameter for the interpretation of both static and dynamic loading tests on piles. This value is commonly assumed to be consta
Jan 1, 2014
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban EnvironmentBy Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
Arbitration - The Tender TrapBy James Green
It has often been said that the best contracts written are by people who are suspicious of each other. The Spanish philosopher, Ortega y Gasset, said: "Every contract is an Act of Distrust." T
Jan 1, 1987