  • DFI
    The Heritage of Swedish Foundation Engineering

    By Stefan Aronsson, K. Rainer Massarsch

    "ABSTRACT The geology of Sweden is characterized by the most recent glacial period with deposition of very soft clays and loose sand. Due to these difficult geotechnical conditions, new, innovative fo

    Jan 1, 2014

  • DFI
    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • DFI
    Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall Panels

    There are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration

    Jan 1, 2005

  • DFI
    Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - Introduction

    By W. J. van Niekerk

    Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st

    Jan 1, 2000

  • DFI
    High Capacity Drilled Cast-In-Place Piles, House Of Representatives Building, Lansing, Michigan - Summary

    By Robert C. Rabeler

    Soil and Materials Engineers, Inc. (SME) has utilized drilled cast-in-place (D-CIP) piles on a number of projects in the midwest. These foundation systems have typically consisted of drilling an 8 to

    Jan 1, 1999

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • DFI
    Underpinning A Crane Foundation

    By Donald R. McMahon

    This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man

    Jan 1, 2006

  • DFI
    Mini-Piling And Soil Anchors ? Introduction

    By Martin C. Jones

    This paper outlines the development of small diameter grouted piling, to deal with foundation problems in difficult soils conditions and in very restricted access areas. A number of applications are o

    Jan 1, 1987

  • DFI
    SFMOMA Expansion – Multiple Uses of Ground Improvement – A Case Study

    By Scott A. Walker, Frank L. Rollo

    "The San Francisco Museum of Modern Art (SFMOMA) in downtown metropolitan San Francisco, California, is supported on a mat foundation. Although the mat foundation of the original museum was designed t

    Jan 1, 2014

  • DFI
    Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway Station

    By Antonio Marinucci, Robin Mao

    The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con

  • DFI
    Auger Pressure Grouted Displacement Piles: An Acceptable Alternative

    By Osama El-Fiky

    There are many types of deep foundations currently being used in the San Francisco Bay Area, one of the most common being driven precast, prestressed concrete (PC/PS) piles. PC/PS piles are frequently

    Jan 1, 2002

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    South 196th/200th Street Corridor And Bridge Crossing, Kent, Washington

    By James Su

    The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta

    Jan 1, 1998

  • DFI
    Soil-Cement Columns For Building Foundations

    By Osamu Taki

    The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are

    Jan 1, 1992

  • DFI
    Conference Photographs

    [ ]

    Jan 1, 1994

  • DFI
    History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - Summary

    By James S. Graham

    Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area

    Jan 1, 2000

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989

  • DFI
    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014