Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • DFI
    I - 280 / San Francisco Pile Load Test Results And Seismic Design Guidelines - 1. Earthquake Loading Of Structures - A Brief Overview - 1.1 The 1989 Loma Prieta Earthquake - 1.1.1. CSMIP Records - Recorded Time-History Data

    By James A. Mason

    The State of California has instrumented numerous buildings, bridges, and dams throughout the state with earthquake recording devices. These accelerometers are strategically placed to measure the resp

    Jan 1, 1993

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • DFI
    Environmental Considerations For Foundation Construction In The Boston Area - The New MCP

    By James V. Errico

    On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts

    Jan 1, 1994

  • DFI
    [Halliburton / Brown & Root Report] - Brown & Root Civil - GeoJet Foundation System - I. Introduction

    By Gordon] [Reavis

    Halliburton Services and Brown & Root have developed a unique foundation system that blends oilfield and construction technologies to construct deep foundations which offer significant advantages acro

    Jan 1, 1993

  • DFI
    Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program

    By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols

    Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou

    Jan 1, 2018

  • DFI
    Maritime Structures

    By D. Waite

    The Chairman opened the session by wondering why so few papers on Maritime Structures had been received for this conference. Perhaps because the marine environment is so hostile and the access so diff

    Jan 1, 1991

  • DFI
    New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End Bearing

    By J. Osterberg

    A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward

    Jan 1, 1989

  • DFI
    The Bawang Pile ? A New Type Of Pile ? Synopsis

    By B. Broms

    The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b

    Jan 1, 2010

  • DFI
    Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall

    By D. A. Bruce

    To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic

    Jan 1, 1989

  • DFI
    Deep and Extra Deep Diaphragm Walls in Shanghai – Increasing Demand for Infrastructure in Megacities Drives the Requirement of Increasing Depth for Diaphragm Walls

    By Wu Jie Mei, Li Yao Liang, Franz-Werner Gerressen, Arthur Bi

    Diaphragm walls (D-walls) are known as underground structural elements commonly used for retention systems and permanent foundation elements. In addition, they are also quite often used as deep ground

    Jan 1, 2018

  • DFI
    Numerical Simulation Of Quasi-Static Pile Load Test

    By N. Q. Huy

    This paper describes the application of finite element analysis to simulate the static and quasi-static pile load tests in different drainage conditions. The possible effect of excess pore water press

    Jan 1, 2006

  • DFI
    Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project

    By Gray Mullins

    A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade

    Jan 1, 2003

  • DFI
    Deep Foundations In The Challenging Geology Of Central Florida

    By Gary Kuhns

    Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo

    Jan 1, 2003

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    Helical Foundations And Tiebacks: Quality Control, Inspection And Performance Monitoring

    By John S. Pack

    The last 25 years have seen rapid expansion in the use of helical screw pile foundations and tiebacks for new and retrofit construction of buildings and earth retention structures. An estimated $100 m

    Jan 1, 2003

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • DFI
    Application Of Hydrofracture Principles To Grouting In Deep Foundation ? Synopsis

    By Z. M. Zhang

    Fracture grouting is a particular technique which can be used in soils and rocks with low permeability to increase groutability and penetration rates and to solve some special foundation problems by i

    Jan 1, 2010

  • DFI
    Soil Plug in Open Ended Pipe Piles Embedded in Sand

    By Mohammed Y. Fattah, Wissam H. S. Al-Sudani

    "During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration

    Jan 1, 2014