Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1998
-
Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of StructuresBy A. A. Gupte
Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use
Jan 1, 1989
-
Composite Foundations For Uplift And Compression In Soft Soils And Swampy Terrain ? SynopsisBy H. S. Radhakrishna
Foundations supporting power transmission and communications towers are subjected to both compression and uplift loads, often of a cyclic nature. Some novel foundations, combining the beneficial featu
Jan 1, 2010
-
Bearing And Friction Design Capacity Software For Helical Anchors And PilesBy Gary L. Seider
Chance, a Division of Hubbell Power Systems, Inc., in conjunction with Sailors Engineering, Inc. has updated its Helical Design Capacity Software. This latest version, ?HeliCAP® v2.0?, is a state-of-
Jan 1, 2007
-
Newest Developments in Quality Control and Soil Mixing for Actual and Future DemandsBy Franz-Werner Gerressen
"New developments are required day by day. On the one hand site to improve the actual situation, on the other hand site to create the future and to ensure that future demands can be fulfilled. This re
Jan 1, 1900
-
Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern ThailandBy Narong Thasnanipan
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me
Jan 1, 2002
-
Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of PilesBy Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008
-
Innovation In South East Asia - SynopsisBy Brian Littlechild
Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting
Jan 1, 2000
-
Optimization Of Pile Length Using Decision Analysis With Information From Load Tests During ConstructionBy Jiun-Yih Chen
Pile load tests are regularly used to verify pile capacities. Sometimes, they are used to optimize pile designs. This paper presents a case study based on a real project, in which the information ob
Jan 1, 2009
-
Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital StructuresBy Frank Borda
Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re
Jan 1, 2004
-
The Resonant Driver: Ultra High Frequency Pile And Casing InstallationBy Matthew Janes
The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c
Jan 1, 2008
-
Investigation Of Bearing Behavior Of Pile Raft Foundation Using Numerical ModelingBy A. Ghorbani
The analysis of Combined Pile Raft Foundation (CPRF) is very complex due to involved interactions among components of CPRF system. Many researchers made efforts to develop sufficient methods including
Jan 1, 2007
-
Osterberg Cell Tests Confirm In-Situ Pier Capacity In Colorado - IntroductionBy William Siegel
Kleinfelder provided foundation analysis and design for an expansion to a cement plant in Florence, Colorado. The expansion was a conversion from a horizontal wet process to a vertical dry process, a
Jan 1, 2007
-
Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.By Jim Bruce
This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss
Jan 1, 2004
-
Augered Cast-In-Place Pile Installation, Grand Forks, North DakotaBy Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Design And Performance Of Helical Screw Piles In Collapsible And Expansive Soils In Arid Regions Of The United StatesBy David R. Black
Foundation problems due to collapsible and expansive soils are well known throughout the arid western United States. Millions of dollars are spent annually to counteract the effects of such soils for
Jan 1, 2002
-
Alignment Control Of Drilling Rods For Jet Grouting By Integrated MicrochipsBy Mousaab Majar, Nikolaus Schneider
The technical challenges for accurate drilling positions increase with deep underground structures in inner city areas. Designed for jet grouting, specific sensors have been developed to record the al
May 1, 2022
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
Tension Testing of the Grouted Anchorage Assembly for Multistrand AnchorsBy Lucian L. Bogdan
"SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the
Jan 1, 2005
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008