Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Toe Protection For H-Piles On Sloping Bedrock At Rainy River - SummaryBy Jon E. Bischoff
Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi
Jan 1, 1993
-
Seepage Barrier Mix Design Development, Installation, and EvaluationBy George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
How Well Do Helical Piles Resist Earthquakes as Foundation Systems? WHERE TO GO FROM HERE?By Amy B. Cerato, Shawn Allred, Tatiana Vargas
"Helical piles are deep foundation elements that resemble, and are installed like, a large steel soil screw — they have a slender steel shaft with one or more round helix bearing plates welded to the
Jan 1, 2017
-
Analysis of Three Axial Load Tests on Large Bored Grouted Deep FoundationsBy Hayel M. El-Naggar, Marawan M. Shahien
"Large capacity piles are important type of foundation elements that are needed in case of high column loads such as in tall buildings with large span between columns. In many projects, especially if
Jan 1, 2017
-
Marine Foundation Retrofi t for the Richmond - San Rafael BridgeBy Patrick E. Durnal, Henrik Dahl
"A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the
Jan 1, 2007
-
Simplified Model for Increased Lateral Resistance of Deep Foundations Using Soil MixingBy Hubert Law, Dan A. Brown, Kyle M. Rollins
"Soil mixing and jet grouting provide a means to significantly increase the lateral resistance of pile group foundations with relatively little investment of time, effort, and expense compared to the
Jan 1, 2015
-
Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
Harry Nice Bridge Geotechnical Instrumentation Case StudyBy Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.
Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans
Oct 1, 2022
-
Risks Associated With Finite Element Modelling Of Cut And Cover StructuresBy Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Jet Grouted Foundation for 57-Story TowerBy Robert Alperstein, Nidal AbiSaab, Joe Pastore
"This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit
Jan 1, 2016
-
Ideas To Improve Driven Pile Foundation Design And Installation ProceduresBy Armin W. Stuedlein, Steven R. Saye
The differences between calculated axial pile capacity and the capacity realized during and following installation has long presented a significant concern for foundation engineers and contractors. Su
-
CFA Pile Design Parameters in SandBy Stuart Coutts
"This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc
Jan 1, 1900
-
A Three-Stage Assessment Process To Predict Risk Levels Due To Subsurface ConstructionBy Julie Clarke
In 1939 Dr. Ralph Peck criticized the Civil Engineering community for taking a bifurcated approach to the prediction of building damage due to subsurface geo-technical works. Specifically, he observe
Jan 1, 2009
-
Errata (5268ac87-18a9-458e-b334-4f72060324e3)Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'
Jan 1, 1994
-
Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-ContractorBy Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas
"A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi
Jan 1, 2017
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Deep Excavation And Earth Retaining Structure ? SynopsisBy S. Y. Zhou
Excavation with earth retaining is one of the main technological means in deep foundations and underground engineerings. Several construction methods which have been used in China are introduced here
Jan 1, 2010
-
Construction Dewatering Challenges in Urban EnvironmentsBy Rafael A. Rivera
"Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re
Jan 1, 2017
-
A Review of Guidelines for Dewatering Design within the Abu Dhabi MunicipalityBy M. Melih Demirkan, Jared Deible, Michael Rosenmeier, Mazen Elias Adib, Juan J. Gutierrez, Raghav Ramanathan
Dewatering and groundwater control is required frequently for construction projects and needs to be accounted for and dealt with care during design and construction to complete the project successfull
Jan 1, 2016
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017