Sulphur Compounds and Metal removal using Bioprocess TechnologyBy Andre L. De Vegt, Cees J. N. Buisman
"For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous st
Jan 1, 1997
-
Metallogenic overview of the Nain Province, northern LabradorBy Derek H. C. Wilton
"The Nain Province (NP) of northern Labrador is a >600 km long by =100 km wide Archean craton that has undergone relatively little mineral exploration until economically signifcant concentrations of o
Jan 1, 1996
-
Use of the Latest Technology to Overcome the Demands of Mill OperationBy Tatiana Ravani von Ow, Leandro Bomvisinho
"The size of mills driven by ring-gear or by a gearless solution has significantly increased in the last years. This has created additional challenges for the driven equipment. The requirements for th
Jan 1, 2010
-
Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan OperationBy Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau
"In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha
Jan 1, 2008
-
Capturing unrealized capacityBy M. W. Lewis
A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th
Jan 1, 2004
-
Capturing unrealized capacityBy M. W. Lewis, B. Sambirsky, J. Werner
A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh
Jan 1, 2004
-
Participative Management at the Golden Giant Mill, A Co-Ordinators PerspectiveBy K. Barr, F. Grenier, J. Hettinger
"To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build
Jan 1, 1988
-
Hydraulic Hoisting & Long Distance Pumping of CoalBy R. E. McElvain
"Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.
Jan 1, 1978
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
An Economic and Environmental Case for Re-processing Gold Tailings in South AfricaBy James A. Brown, Marius Botha, Christopher A. Fleming
"The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig
Jan 1, 2010
-
The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical ProjectBy Jan E. Nesset, Phillip J. Mackey
"Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain
Jan 1, 2003
-
A History of Improvements at the Kemess ConcentratorBy Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman
"Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments
Jan 1, 2005
-
Fine Grinding Applications Using the Metso Vertimill® Grinding Mill and the Metso Stirred Media Detritor (SMD) in Gold ProcessingBy Graham Davey
"Low speed stirred milling has been employed for many years in the metalliferous and industrial minerals industries. High speed stirred milling is a relatively new method of grinding in the metallifer
Jan 1, 2006
-
Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard MineBy Véronique Falmagne
The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling
May 1, 2003
-
Dynamic hydraulic shovel simulator for improved machine performanceBy S. Frimpong
Hydraulic shovels are widely used for primary production in surface mining operations. Variability in material diggability, unstructured mining environments and limited space and operator inefficiency
Jan 1, 2005
-
Modelling and Resource Estimation of a Thin-Layered Lignite DepositBy Ioannis K. Kapageridis
The lignite deposits of the Kozani-Ptolemais-Amyntaio basin in western Macedonia (North-West Greece) present a difficult modelling problem. Each deposit consists of several thin lignite layers ranging
Oct 1, 2009
-
Monitoring the Burner Emission Spectrum in a Commercial Flash Furnace Using a Novel Optical ProbeBy G. Stokreef, B. R. Davis, M. Kadiyski, Alvear Montenegro, H-P. Loock, V. Montenegro
An optical probe for burner monitoring in copper flash smelting, first developed at the University of Concepcion, is being industrially tested in a collaboration between Kingston Process Metallurgy, A
Jan 1, 2019
-
Continuous Vat Bio-Oxidation of a Refractory Arsenical Sulphide ConcentrateBy P. Brad Marchant
"To properly evaluate bioleaching as a commercial alternative for sulphide concentrate oxidation, to enhance cyanidation response, it was necessary to define and optimize critical operating variables
Jan 1, 1985
-
Mine Site Hydrogen Storage and Delivery ModelBy M. C. Bétournay
Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A
May 1, 2007
-
Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick GoldstrikeBy M. Rantapaa
Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the
Jan 1, 2005