Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The economics of diamond projects in the Canadian Arctic (bbedb282-085a-4c62-8fa2-4245fef0430a)

    By W. Bullen

    A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions applicable t

    Jan 1, 2006

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    New Technologies for Improved Processing of Base and Precious Metals Containing Ores

    By J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio

    "Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.

    Jan 1, 2013

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    Improving Quality Control and Combustion in Pyrometallurgical Processes using Multivariate Image Analysis of Flames

    By Gianni Bartolacci, Patrice Nadeau, Szatvanyi. Gerard, Carl Duchesne, Claude Chrétien

    "Combustion is used throughout the mineral processing industry to produce steam in boilers, to dry concentrates in rotary dryers, and to apply heat treatments in pyrometallurgical furnaces. Tight comb

    Jan 1, 2005

  • CIM
    Metallurgical Testwork on Harmony Project Ore

    By K. Gie Tan, Frank Wright

    "Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res

    Jan 1, 2000

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    Understanding the Relationship: Bitumen Production and the Athabasca River

    Overview ?Oil Sands Background ?Water Use in Surface Mining ?Tailings Disposal ?Water Balance for Surface Mining ?Implications of Emerging Regulations ?Water Management Framework ?Tailings P

    May 1, 2009

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • CIM
    Research into high density backfill placement methods by the Ontario Division of Inco Limited

    By B. Goard

    "IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between

    Jan 1, 1987

  • CIM
    Assessing the Performance and Efficiency of Fine Grinding Technologies

    By Jan E. Nesset, Colin Hardie, Peter Radziszewski, Donald P. Leroux

    "The successful introduction of new high intensity stirred milling technologies (e.g. IsaMill, SMDetritor) to the mining industry in recent years prompted Noranda-Falconbridge to initiate a study comp

    Jan 1, 2006

  • CIM
    Benchmarking Red Dog Ores using Modal Analysis and its Correlation with Observed Metallurgy

    By David Lin

    "Modal data from Red Dog Main Pit ores were collected and analysed on a size-by-size basis. The Main Pit data were compared to data from composite samples of Red Dog Aqqaluk ores. The data revealed th

    Jan 1, 2002

  • CIM
    SAG Mill Operation at Cortez: Evolution of Liner Design from Current to Future Operations

    By Raj K. Rajamani, Sanjeeva Latchireddi, Dave Plummer, Stieger. Julius

    "The Cortez SAG mill liner design was recently modified to improve the mill operating energy efficiency. In addition to the expected benefits, the design change unexpectedly played a significant role

    Jan 1, 2007

  • CIM
    A hydrometallorgical process for the extraction of copper

    By W. A. Ahrens, J. H. McNamara, J. G. Franek

    "An economical, pollution-free process has been developed for the hydrometallurgical extraction of copper from sulphide ores. The extracted copper, in the form of cuprous chloride (CuC/), is converted

    Jan 1, 1980

  • CIM
    Mechano-Column Flotation

    By Turgut Yalcin

    "High-grade concentrates are achieved in flotation columns primarily due to the use of thick froth layers and wash water, both of which facilitate the drainage of hydrophilic minerals from the froth.

    Jan 1, 1997