Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine Project

    By Roger Payne, John R. Goode, Feng Gao, James Brown

    The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific

    Jan 1, 2014

  • CIM
    Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore Tailings

    By X. S. Yuan

    With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha

    Jan 1, 2006

  • CIM
    Determining Ore Breakage Characteristics using the Steel Wheel Abrasion Test

    By Tapiwa Chenje, Victor Olivas, Peter Radziszewski

    "Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device

    Jan 1, 2011

  • CIM
    The Automatic Burning of Coal

    By A. Ignatieff

    "Demonstrations of Automatic Coal Burning EquipmentAT THE 1951 and 1952 Annual Coal Research Conferences sponsored by the Dominion Coal Board and attended by delegates from the Dominion and Provincial

    Jan 1, 1953

  • CIM
    The Mechanical Departments of the Hudson Bay Mining and Smelting Company, Limited

    By J. E. Ryan

    General Description Due to the extreme cold weather experienced in Flin Flon during the winter months, thought and precaution were necessary in the design of the plant buildings. The machine shop, ca

    Jan 1, 1935

  • CIM
    Arsenic Management and Stabilization

    By K. Lundholm, A. E. Mäkinen

    "Ore grades are declining and getting more complex around the world which not only complicate the ore processing but also produce new type of requirements to manage the produce waste streams. One spec

    Jan 1, 2014

  • CIM
    Mettop´s New Ionic Liquid Cooling Technology is the Safest Way to Cool a Furnace

    By Stefan Wallner, Andreas Filzwieser, Stefan Konetschnik, Reinhard Preiss, Iris Filzwieser

    "Process Safety Management for METTOP means avoiding risks as far as possible - but also dealing with the residual risk by using all existing management tools or external assistance, if required. The

    Jan 1, 2014

  • CIM
    Evaluation of Ventilation On Demand (VOD) in Sudbury Mines

    By G. Lyle

    Since its inception CEMI (Centre for Excellence in Mining Innovation) has focused on facilitating innovative solutions to the mining industry in six strategic research areas; GeoRisk, ConstructMine, V

    Oct 1, 2010

  • CIM
    Model of a Decision

    A mathematical model of a decision is represented by the table in Figure 4. The numbers in the matrix are a measure of the effectiveness of each alternate for an objective. In this case, it is the per

    Jan 1, 1964

  • CIM
    Lessons Learned from Measuring and Monitoring the Social License to Operate

    By Ian Thomson

    The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac

    Aug 1, 2013

  • CIM
    Laser-MIG Hybrid Welding of Maraging Steel

    By K. V. Phani Prabhakar, G. Padmanabham1, L. Subashini

    Laser-arc Hybrid Welding (LAHW) is a relatively recent concept which effectively combines the advantages of laser welding such as the high depth of penetration, low heat input, high welding speed and

    Jan 1, 2014

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    A New ERA Tool for State of the Art Metallurgical Balance Calculations

    By Frédéric Flament, Luc Lachance

    "The important task of metallurgical accounting that used to be done manually is being more and more automated. Currently available solutions can generate accounting reports without human intervention

    Jan 1, 2011

  • CIM
    The Use of Centrifuge Technology in the Removal of Crud and Fine Particles in Mineral Processing

    By Derek Ettie

    "In the Hydrometallurgical processes, the presence of the so-called "crud" is a constant challenge in solvent extraction. Crud is a stable emulsion which forms along the interface between the aqueous

    Jan 1, 2014

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed and massive f

    Jan 1, 2012

  • CIM
    Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by Surfactant

    By H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank

    Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen

    Jan 1, 2014

  • CIM
    Summary Of The EU Voluntary Copper Risk Assessment

    By K. Delbeke

    Within the framework of the EU Existing Substance (93/793/EEC) and REACH regulations EC/1907/2006), the copper industry initiated in 2000 a comprehensive Voluntary Risk Assessment of copper and severa

    Jan 1, 2007

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • CIM
    Financing From the Perspective of Mining Companies

    By Eric Low

    Raising capital by issuing debt or equity is necessary in almost every corporation. In the field of corporate finance, the raising of capital is a heavily-studied topic. However, some of what is studi

    May 1, 2011

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007