Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Process Mineralogy of the Refractory Gold Part of the Lapa Ore Deposit

    By S. Mathieu, R. Mennillod-Blondin, P. Cousin, N. Valle, H. Bouzahzah, P. Marion

    The gold deposit of the Lapa mine has a complex mineralogical gold state with coarse and fine native gold, aurostibite and submicroscopic gold within arsenopyrite. A specific mineralogical characteriz

    Jan 1, 2011

  • CIM
    Large Underground Excavation Support for Ore Exploitation

    By R. Lapcevic, P. Lokin

    "Among other components, ore body „T“ was discovered in the Bor pit copper mine at a depth of app. 500m. The ore body is relatively small: 60-65m long, 40-45m wide and up to 50m high, but with an extr

    Jan 1, 2015

  • CIM
    Robotic systems development for mining automation

    By S. Flewelling, M. Scobie, G. R. Baiden

    "SynopsisA feasibility study to develop a research program, the Mine Automation Plan (MAP), was recently completed. This was undertaken by a team comprised of Inco Ltd., Falconbridge Limited, the Cana

    Jan 1, 1994

  • CIM
    Successful Application of a Diesel Particulate Filter System at Vale’s Creighton Mine

    By C. Allen, V. Hensel, J. S. Stachulak

    "Vale has been actively evaluating new technologies to curtail diesel emissions. This paper discusses the selection, installation, operation, and evaluation of the MANN+HUMMEL SMF®-AR diesel particula

    Jan 1, 2015

  • CIM
    Briquetting in the Beneficiation of Fine Coal

    By E. Swartzman

    This paper presents a general re-view of the various methods of briquetting coals, with and without the aid of a binder, with special reference to the production of a suitable briquette from Nova Scot

    Jan 1, 1959

  • CIM
    Mineralogical, Fluid Inclusion, and Stable Isotope Study of Wenyu-Dongchuang Gold Deposits in the Xiaoqinling Mt. Area, West Henan, China

    By Jiuhua Xu, Yuling Xie, Fenglei Bie, Neng Jiang

    "Abstract - The Xiaoqingling Mt. area is one of the most productive gold districts in China. The gold-bearing quartz veins are controlled by a series of east-west shear zones within the Archean Taihua

    Jan 1, 1998

  • CIM
    The Capture, Concentration and Conversion of Waste Heat to Electricity in Pyro-Metallurgical Industries

    By M. Al-Khawaja, F. Hassani, F. Mucciardi, N. Razavinia

    "In today’s economy many industries are becoming aware of the need to recover some of the waste heat they create. Industrial processes release, on a global scale, over 100 tera-Joules (i.e. 1014 J) of

    Jan 1, 2012

  • CIM
    Metal Mine Ventilation (5a66f77a-e32a-4b69-828a-81ebc3b32b9e)

    By D. Harrington

    Ventilation of underground workings consists in establishment of such control of air currents that the underground workers may work in safety, with maximum comfort and efficiency, and without impairme

    Jan 1, 1933

  • CIM
    Reduction Kinetics of Fe(III) on Chalcopyrite up to 110 °C

    By E. Asselin, G. K. Yue

    "In the present study, electrochemical measurements, especially cathodic potentiodynamic polarization (CPC) and cyclic potentiodynamic polarization (CPP), have been employed to study the kinetics of f

    Jan 1, 2012

  • CIM
    Post Crunch Financial Management ?the Role of Agency Debt

    By Douglas Macaulay

    "The Work contains the personal views and opinions of the Author and in no manner should it be construed as reflecting the official position of Export Development Canada. The Author makes no represent

    May 1, 2010

  • CIM
    Copper Roast Segregation Process: A Promise to be Fulfilled and a Challenge for Material Handling Technology

    By A. del Campo A.

    The roast segregation process, which was patented in 1974, makes use of a set of chemical reactions that are different from the traditional sequential oxidation of iron and copper sulfides used by all

    Jan 1, 2007

  • CIM
    Etudes de libération des minerais à I'Université Laval (Quebec)

    By J. C. Marchand, M. A. Berube

    "L'objectif principal recherché lors du broyage d 'un minerai est de libérer adéquatement ses valeurs utiles en vue de leur concentration ultérieure. La pratique courante consiste à tenter d

    Jan 1, 1983

  • CIM
    A Method of Appraising Lost Production for Mined-Through Coal-Bed Methane Wells

    By Philip W. Johnson, Charles D. Haynes

    "Abstract - The coalbed methane industry has become a prominent source of domestic natural gas, with its technology having evolved over the past 30 years. Whereas most coalbed methane wells are able t

    Jan 1, 2006

  • CIM
    Arsenic Stability and Characterization of CESL Process Residues

    By K. Mayhew, R. Bruce, A. Heidel, G. P. Demopoulos

    "Teck and Aurubis are working together to commercialize a technology for the processing of copper arsenic sulphide concentrates that is economic and sustainable with regards to the environment and com

    Jan 1, 2012

  • CIM
    The Behavior of Rocks when Exposed to Microwave Radiation

    By N. Gharib, F. Hassani, P. Nekoovaght

    "Novel rock breakage techniques are becoming more viable and attractive to industry. Microwave energy, as a thermal energy capable of inducing micro cracks through differential heating (therefore expa

    Jan 1, 2015

  • CIM
    Economics of Primary Iron and Steel Production on the West Coast from Local Iron Ores via the "H-Iron" Direct Reduction Process

    By W J. Dyck

    Past attempts to establish an integrated steel industry on the West Coast of Canada have been unsuccessful for at least three reasons: (a) insufficient reserves of a suit-able iron ore supply; (b) a r

    Jan 1, 1963

  • CIM
    Optimization of clean coal specifications

    By L. X. Li

    Coking coal producers often encounter variations in clean coal quality when mining multiseam deposits containing coals with different washability and coking properties. This paper describes how, for a

    Jan 1, 2014

  • CIM
    Overview of overburden removal at Syncrude Canada Ltd.

    By Y. P. Malhotra, JE. C. Carter

    "Syncrude's overburden removal requirement ranges from 20 million to 30 million bank cubic metres per year to meet tarsand demands for the production of 129,000 barrels of synthetic crude oil per

    Jan 1, 1983

  • CIM
    A Thermo-Chemical Model of the Peirce - Smith Copper Converter: Part I. Slag Making Stage

    By M. Aushouri, S. H. Mansouri, N. Aminizadeh

    A thermo-chemical model of the Peirce-Smith copper converter has been developed to predict the molten temperature. The primary assumption of the model was that all matte, slag and gaseous phases in th

    Jan 1, 2007

  • CIM
    Kupol Mill Leach Operation In 2008-09

    By G. Kolosay, J. Rajala, G. Deschênes, A. Romanov

    ABSTRACT: The Kupol project, located in Far East Russia, treats a high-grade, free-milling ore containing 25.5 g/t Au, 298.3 g/t Ag, and 0.5% pyrite,with a P70of 53 microns. Most of the gold occurs as

    Jan 1, 2011