Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    Stereolithography—a rapid prototyping technique for orebody modelling and mine design

    By A. Akerman, C. P. O’Connor, N. Vayenas

    "Stereolithography is a well-known rapid prototyping technique in the manufacturing sector. Essentially, it is a three-dimensional printing process that produces plastic prototype parts from standard

    Jan 1, 2006

  • CIM
    Fine Grinding of a Sparsely Disseminated Sulphide Ore

    By Augustine O. Orumwense, Micheline Boisclair

    "The use of stirred mill to complement tumbling mills in grinding fine grained minerals is increasingly becoming an attractive processing option. Parameters such as agitation speed, grinding media typ

    Jan 1, 2008

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    Scraper Loading and Scraper Conveying

    By J. B. Keast

    Introduction The last two or three decades have been marked by striking developments in methods of mining and tunnelling. In view .of increased competition and various economic factors, intensive &ap

    Jan 1, 1933

  • CIM
    Concentrator Operations at Whitehorse Copper Mines Limited

    By D. Linzey

    "History of Whitehorse Copper BeltThe first discovery of copper on the Whitehorse Copper Belt is reported to have been made by miners on their way to the Klondike in 1897. By 1899 the district had bee

    Jan 1, 1977

  • CIM
    Vanadium-bearing magnetite and ilmenite mineralization and beneficiation from the Sinarsuk V- Ti project, West Greenland

    By T. Grammatikopoulos, A. McKen, O. Christiansen

    Vanadium mineralization occurs in oxide-rich horizons within layered metagabbro zones of the Sinarsuk deposit, West Greenland. The main oxide minerals are vanadiferous magnetite and ilmenite, comprisi

    Jan 1, 2002

  • CIM
    Milling at Agnico-Eagle Gold Mines Limited

    By K. Mikulash

    "Agnico-Eagle Mines Limited is located at Joutel in North-Western Québec. The mine is about four miles north-west from the town on the left bank of the Harricana River. The present mining is 1,800 fee

    Jan 1, 1976

  • CIM
    The ACACIA Reactor Improving Gravity Recovery!

    By Ish Grewal

    The ACACIA Reactor - Introduction What is it? The Acacia Reactor is a fluidized bed high intensity cyanide leaching system. Purpose for its existence? The Acacia Reactor was developed to treat hig

    May 1, 2002

  • CIM
    A Liquefaction Incident in a Waste Pass: A Case Study

    By F. Hassani

    This Paper describes a sudden spill of rock waste used for backfilling from a waste pass at one of the underground mine in Canada thus causing a major failure/accident. The mine operator immediately

    May 1, 2003

  • CIM
    Gold Gravity Recovery in Copper Circuits at BHP Tintaya

    By Valentin Choquenaha Bombilla, Oscar Alvarez Muiloz

    "Tintaya’s basic production line is copper concentrate, which has an important gold content. The process used is flotation; the objective of the metallurgical department is to obtain the best results

    Jan 1, 2002

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    American Barrick Goldstrike Operation in Elko Nevada - A Summary of the Operation and Future Expansions

    By R. H. Colquhoun, A. W. Bolland, H. J. H. Pieterse

    "American Barrick Resources Corporation acquired the goldstrike property in north eastern Nevada in early 1987. Since that time, the company has undertaken an extensive development program. This paper

    Jan 1, 1992

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Managing Plant Data with the Millex Information Management System

    By L. K. Walker, G. A. Kosick, P. D. Young

    "MillEX is an information management system designed by mineral processors for mineral processors. The system utilizes ""cutting edge"" software technology to gather and store all automatically and ma

    Jan 1, 1992

  • CIM
    The Gravity Recoverable Gold Test and Flash Flotation

    By André Laplante, Robert C. Dunne

    "The role of flash flotation in precious metal recovery is reviewed. Interacting flash flotation and gravity recovery is discussed. The GRG test can be used, when linked to the behaviour of gold in gr

    Jan 1, 2002

  • CIM
    Recommended Practices for Application, Installation and Calibration of a Weightometer

    By D. G. MacBeth

    Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the

    Jan 1, 1975

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979