  • AUSIMM
    Proposals for A Better System of Mining Tenure

    There is very little in Australian mining law that sets out the rights of mining tenement and exploration licence holders as against other parties who wish to carry out ground or aerial surveillance o

    Jan 1, 1996

  • AUSIMM
    CanadaÆs Program for Innovations in Mining Technology in the 21st Century

    The Canadian mining industry was in turmoil in the early 1980s. The post-war era based on reconstruction faded away after the high demands for minerals in the 1950s and 1960s. Also, the industry ha

    Jan 1, 1988

  • AUSIMM
    The Osborne Deposit

    The Osborne copper-gold deposit (within the Trough Tank project area) is located in the Cloncurry Shire about 195 kilometres south-east of Mount Isa. It is hosted by Proterozoic metasediments of the E

    Jan 1, 1993

  • AUSIMM
    The Place of Oil and Gas in Future Energy Patterns in Australia

    Average annual growth in consumption of primary energy in Australia over the past 10 years has been 5·5 per cent compared to a world average of 4·1 per cent.Over the next 10 years growth rat

    Jan 1, 1971

  • AUSIMM
    Mechanisms of Metal Immobilisation in Mine Drainage Treatment Wetlands ù A Sustainability Perspective

    There are a number of different mechanisms by which wetlands can immobilise the metals in mine drainage. Here, the biogeochemistry behind four of these mechanisms (adsorption, biological uptake, preci

    Jan 1, 2003

  • AUSIMM
    Correcting for the Dilution of Rakes Processed Sequentially from Multiple Mines at the BHP Billiton Iron Ore Newman Joint Venture Operations

    By T J. Howard

    At BHP Billiton Iron Ore operations, run of mine ore from the several Newman Joint Venture (NJV) mines is railed in 12 kt rakes to Port Hedland. Rakes are processed sequentially, with the lump and fin

    Jan 1, 2007

  • AUSIMM
    No Dam Leaks: The Challenge of Blasting the Warragamba Dam Auxiliary Spillway

    By P Walton, L W. Armstrong, D P. Blair

    Sydney is the capital city of NSW and has a population of approximately four million people. Eighty per cent of the cityÆs water is supplied by Warragamba Dam, which is situated some 75 kilometres sou

    Jan 1, 2001

  • AUSIMM
    Australian Hot Dry Rock Geothermal Energy Potential and a Possible Test Site in the Hunter Valley

    By Somerville M, Muray A, Bocking M

    Australia has an extremely large total hot dry rock (HDR) resource above a depth of 5 km, equivalent to 7500 times its present annual energy consumption, of which 80 per cent underlies the Great Art

    Jan 1, 1995

  • AUSIMM
    Interpreting the Story of the Mining Landscape - Using Geotourism for Sustainable Community Development

    Landscape interpretation, geology and mining history are being successfully used to explore options for sustainable community tourism product development. Recent work by the author in Europe and Austr

    Jan 1, 2009

  • AUSIMM
    Dealing With Demands of Technical Variability and Uncertainty Along the Mine Value Chain

    By M Noppe, I Glacken

    There are many critical nodes along the mine value chain, from orebody to mineral product, and inter-disciplinary input is required to analyse the variability and uncertainty at each node in order to

    Jan 1, 2002

  • AUSIMM
    Geology and Blasting Objectives - Starting at Both Ends

    A key premise to this paper is that most people involved in the design and implementation of drilling and blasting operations could benefit from a greater understanding of the geological materials, de

    Jan 1, 1999

  • AUSIMM
    Survey of the Sea Bottom in Connection with Working Coal Under Tidal Waters

    The paper deals with the taking of soundings in connection with coal mining operations under part of the Pacific Ocean adjoining John Darling Colliery.INTRODUCTIONIn the early days of mining in the Ne

    Jan 1, 1947

  • AUSIMM
    Stope Filling at the North Mine, Broken Hill

    North Broken Hill Limited came into prominence as a producing mine at· the commencement of the present century, when a great many of the disabilities experienced in earlier mining operations th:r

    Jan 1, 1940

  • AUSIMM
    Close-Out - The Risk of Too Much Water

    At many locations in Australia the decommissioning of mining operations will require the disposal of excess water. If the water is contaminated its disposal may be restricted by government guideline

    Jan 1, 1994

  • AUSIMM
    Project Evaluation by Sensitivity, Scenario and Risk Analysis

    By J D. van Wees

    Preliminary project evaluation is relevant to the evaluation process of the decision makers (or executives) prior to making the critical business choices. Important to the assessment is an integrated

    Jan 1, 2003

  • AUSIMM
    Semi-Autogenous Grinding At The Paddington Goldmine

    The SAG milling circuit at Paddington was designed on limited bench testwork and since commissioning with the exception of some mechanical problems has performed well.

    Jan 1, 1987

  • AUSIMM
    A Mine Planning Model to Satisfy Long-Term Grade Targets

    By M Rimes

    This paper describes a technique to predict achievable head grades and likely variances from target grade for the Shovelanna Iron Ore Project, in the Pilbara region of Western Australia. The block mod

    Jan 1, 2007

  • AUSIMM
    Improving Quality Assurance and Quality Control Practices - Basic Methodology Using Worked Examples

    By P Stoker

    The need for quality assurance and quality control (QA/QC) in the sampling and assaying of minerals is fundamental to the reliability and confidence of a mineral resource estimate, reserve estimate an

    Jan 1, 2009

  • AUSIMM
    A Miner’s Journey

    By S Coughlan

    "A personal account of my journey from a student from suburban Melbourne in the 1970s through 40 odd years in and around the mining industry including the important events that have moulded my thinkin

    Mar 24, 2014

  • AUSIMM
    Rapid Reconnaissance Trench Sampling for the Exploration Industry

    The increasing use of Ditch Witch trenching to define gold ore bound- aries in supergeme enriched near surface open cut mines has led to the consideration of using this technique for other sampling p

    Jan 1, 1988