Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Two Stage Iron Purification of Zinc Plant Solutions

    By Kershaw MG

    At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec

    Jan 1, 1985

  • AUSIMM
    When Does Further Processing at the Mine Site Make Sense?

    By G Lane, S La Brooy

    A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L

    Jan 1, 2008

  • AUSIMM
    Variogram of a Continuous Flow ù A Tool for Designing Sampling Increments

    By J Koppe, J F. Costa

    A fundamental error of sampling occurs when a sample is extracted from a larger mass of ore or lot. The act of sampling requires that all particles belonging to the lot have an equal chance of being e

    Jan 1, 2005

  • AUSIMM
    Flotation in the Minerals Industry ù Some Observations

    By J P. Moodie

    Recent trends in flotation technology are briefly reviewed. These show that considerable development has been made as the operators, suppliers and technologists have responded to the challenges of the

    Jan 1, 2005

  • AUSIMM
    Capillary Filtration - The Harnessing of Natural Forces to Serve the Process Industry

    By Haartti J

    Generally when equipment is chosen for solving a dewatering problem, the equipment is based on one of following physical methods: gravity (sedimentation, screens), vacuum (vacuum drum and disc filt

    Jan 1, 1993

  • AUSIMM
    From Principles to Core Business ù Some Approaches to Sustainability

    The integration of economic, cultural, social and environmental decision-making has increasingly become globally recognised as the only acceptable way of doing business consistent with sustainable dev

    Jan 1, 2002

  • AUSIMM
    Reshaping Minerals Tertiary Education in Australia

    University education in Australia is changing, driven by greater market orientation, reduced funding available per student, especially in the higher-cost minerals industry disciplines, and the call fo

    Jan 1, 2000

  • AUSIMM
    The Bacterial Oxidation (BACOX) Plant at Laizhou Shandong Province China ù The First Three Years of Operation

    By F Jiao, J Wang

    By the year 2000, China was the sixth largest gold producer in the world, with about one-quarter of total production being derived from refractory or semi-refractory deposits. Although bacterial oxida

    Jan 1, 2004

  • AUSIMM
    Paper No. 125. Notes on The Desulphurisation of Slimes by Heap Roasting as Conducted by The Broken Hill Proprietary Company, Limited.

    Before proceeding to the main portion of the above subject, a few remarks as to the general question of our mill slimes seem called for, and, with this in view, it is intended to briefly refer to the

    Jan 1, 1903

  • AUSIMM
    Development of Design Criteria for Upgradeable Friction Hoists

    Future depth and production limitations of an ore hoisting system are fixed by its initial design criteria. There is little scope to extend these limitations once installation is completed. Depth and

    Jan 1, 2005

  • AUSIMM
    Solid Electrolytes ù New Techniques in Metal Refining

    By D E. Langberg, J S. J va, D R. Swinbourne

    Specifications on the types and levels of impurities tolerable in metals are becoming increasingly stringent, and are pushing the limits achievable with conventional refining technologies. Particularl

    Jan 1, 2000

  • AUSIMM
    Chlorination of Titaniferous Feedstocks

    By H Aral, L Malishev

    The carbothermic chlorination of titaniferous materials such as rutile, synthetic rutile (SR), upgraded slag and ilmenite in a fluidised bed is an established commercial process. In this work, ilmenit

    Jan 1, 2000

  • AUSIMM
    Case Studies on the Performance and Characterisation of the Froth Phase in Industrial Flotation Circuits

    By S R. Grano, M Vera

    This paper deals with two separate case studies investigating the froth phase performance and characterisation of two industrial rougher/ scavenger flotation circuits. Froth phase performance was quan

    Jan 1, 2005

  • AUSIMM
    Opportunities and Technologies to Reduce the Energy and Water Impacts of Deteriorating Ore Reserves

    While the potential for the discovery of new high grade resources exists, it is almost inevitable that the ore resources used to provide society's ongoing demand for primary metals will deteriora

    Jun 1, 2010

  • AUSIMM
    Flotation of Chromite ù A Review With Applications to Upgrading Chromium-Contaminated Ilmenite

    By W J. Bruckard

    In Australia, ilmenite is produced from beach sand deposits. These deposits contain varying quantities of the valuable minerals zircon, rutile and ilmenite, along with a variety of other minerals. The

    Jan 1, 2001

  • AUSIMM
    The REFDIST Method for Design and Analysis of Plant Trials

    By Briggs D

    Comparing the results of a plant trial by averaging performance measures collected during the trial with measures collected before and after the trial is often quite subjective because of the impact

    Jan 1, 1997

  • AUSIMM
    Geostatistics Applied in Mine Production Planning

    By Markic S, Subelj A

    Long-term plan for lignite mine Velenje has been made by using technical parametrisation method where the basis for periodical, middle- term and short-term plans as well as for scheduling has been al

    Jan 1, 1998

  • AUSIMM
    Manpower Planning - A paradigm Shift?

    One does not need to travel too far back in time to find that the manpower requirements for new projects were focused mainly on: ò plentifulness of supply; ò cheapness of use; and ò fitness for us

    Jan 1, 1991

  • AUSIMM
    The Ewen-Kalkadoon Granite Time Relationship in Northwest Queensland

    The Kalkadoon Granite is regarded as composite in character with at least two different phases. The older phase is considered older than the sediments of the Western Geosyncline, and the younger phase

    Jan 1, 1967

  • AUSIMM
    Maintenace Of Diesel Equipment Underground

    The successful operation of diesel equipment underground does not entirely depend on selection of robust, reliable, easily maintained machines. Results are also heavily influenced by the following

    Jan 1, 1977