Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sumps Aids The Broken Hill Proprietary Company Limited In Saxonvale Feasibility Study (4f6b06bb-7b16-41b9-9052-ce170d293140)

    By Kukla G. T

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine plannin

    Jan 1, 1980

  • AUSIMM
    Continuous Vacuum Treatments of Molten Metals and Alloys

    By Fitzgerald DE, Taverner MG

    The principles, fields of application and equipment design concepts of several new approaches to continuous vacuum treatments of molten metals and alloys are discussed. Partic- ular attention is pa

    Jan 1, 1972

  • AUSIMM
    The Use of Customer Operated Bulk Emulsion Systems for Improved Productivity at the Tara Underground Operations

    By A Suokas

    Boliden Tara Mines Ltd, located in County Meath Ireland, produce in excess of 2.5 million tonnes per annum of ore from the underground resource located 40 miles north west of Dublin. The zinc-lead ore

    Jan 1, 2005

  • AUSIMM
    Mine Access Road Slope Failure: A Case Study from the Ok Tedi Mine

    A case study of a landslide, which threatened vital infrastructure essential for the continuous operation of the Ok Tedi copper mine is presented. The paper presents a detailed description of the la

    Jan 1, 1997

  • AUSIMM
    Optimisation of Overburden Blasting Mount Thorley Colliery

    By Mckenzie CK, Scott A

    The injection of coal as an auxiliary fuel in ironmaking blast furnaces has been introduced on many furnaces worldwide. This paper examines the present practice of coal injection and discusses fut

    Jan 1, 1987

  • AUSIMM
    Optimisation of the Milling Design of the Chessy Project Near Lyon, France

    By Gallet M, Watsford R. M S

    The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and

    Jan 1, 1991

  • AUSIMM
    Case Examples of Stability on Surface Mining Projects

    Stability on surface mining projects is primarily controlled by five factors. These include structural geology, the most important of the factors, the existence of weak layers, primarily clayey go

    Jan 1, 1986

  • AUSIMM
    The Application of Oxygen Isotope Studies To The Occurrence Of Gold Mineralization In Estern Australia

    By Wilson A. F

    The use of stable isotopic measurements as a technique for elucidating the origin and history of the water in hydrothermal fluids is relatively new. Recent studies have emphasized the importance of

    Jan 1, 1980

  • AUSIMM
    Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.

    This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h

    Jan 1, 1956

  • AUSIMM
    Mesozoic-Cenozoic Tectono-Magmatic Evolution and Metallogeny of the East China Continental Margin (7df45351-23c9-4945-b5f6-c1cd3c0acf88)

    By Peirong C, Pei N, Shouxi H, Hongzhong X

    Indosinian (T) orogeny amalgamated the Mongolia-Xingan fold zone, the North China continent, the Yangtzi platform and the SE China fold zone into a unified continent. The early to middle Yanshanian (

    Jan 1, 1995

  • AUSIMM
    Impact of Blast Fragmentation on Crushing and Screening Operations in Quarrying

    By McKenzie C, Michaux S

    Modern quarrying operations focus attention on blasting operations as a critical component in the overall cost-effectiveness of quarrying. Generally, optimisation of blasting has been linked to the

    Jan 1, 1995

  • AUSIMM
    Rediscovery and Development of the Kambalda-St Ives Gold Deposits

    By Gresham J. J

    The rapid and successful development by Western Mining Corporation Limited (WMC) of a gold mining industry based on the deposits of the Kambalda-St Ives group, was the final chapter in a story that

    Jan 1, 1991

  • AUSIMM
    A Review of the Coal and Iignite Resources of Western Australia

    By Wilson AC

    Permian coal from Western Australia's only producing coalfield at Collie is the dominant fuel used in generating electricity for the State's interconnected grid. Collie coal is sub-bitum

    Jan 1, 1986

  • AUSIMM
    Economical and Environmental Operation of Open Cut Mines

    Mining is a high risk, high capital and potentially high reward undertaking. A large proportion of the risk comes from a lack of definition of the orebody (which also provides some of the potential) a

    Jan 1, 2003

  • AUSIMM
    Full-Scale Testing of the PCF Rock Excavation Method

    A small-charge rock excavation method based upon the Penetrating Cone Fracture (PCF) technique has been demonstrated to be capable of excavating the hardest of rocks. The PCF technique involves drilli

    Jan 1, 1993

  • AUSIMM
    Chloridisation of Zinc Ferrite in a HCI/H2O Atmosphere

    By Van Weert G

    Ferrous chloride solution pyrohydrolysis is a successful IICI regeneration process which is carried out in either a spray roaster or a fluid bed. Pyrohydrolysis is not restricted to ferrous chloride

    Jan 1, 1993

  • AUSIMM
    Experiences with Computer-Based Monitoring Systems in Polish Coal Mines

    A modular computer-based monitoring system for mines is dis-cussed. The system consists of the following modules : production moni-toring system HADES, methane monitoring system CMC, seismoacoustic an

    Jan 1, 1985

  • AUSIMM
    Theoretical and experimental approaches to determine the mass transfer coefficient in the steel/slag/refractory system

    By S K. Michelic, M Schickbichler, A Kharicha, E Karimi-Sibaki

    The requirements for the controllability of metallurgical processes are increasingly becoming the focus of both industry and research. Advances in this field of research not only impact the stability

    Aug 21, 2024

  • AUSIMM
    Recent Developments in Strata Bolting in National Coal Board Mines in the United Kingdom

    Strata bolting/dowelling reinforcement techniques are being reintroduced into the mines of the National Coal Board. There are strong reasons for the selection of the full hole anchorage principle o

    Jan 1, 1971

  • AUSIMM
    Installation of an Automatic Truck Despatch System at Bougainville Copper Limited

    In early 1985, Bougainville Copper Limited commissioned an automatic truck despatch system to control its fleet of 44 trucks and 9 shovels. Productivity gains in the past have been the result of i

    Jan 1, 1986