Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Corporate Governance and Risk Management in the Mining Industry

    In the late-1990s, and into the 2000s, many industries, including the mining industry, have seen significant transaction activity by way of acquisitions, floats, joint ventures and major capital proje

    Jan 1, 2003

  • AUSIMM
    A decision framework for comparison of coal void rehabilitation options

    By A Hocking, S Henderson

    Commonwealth of Australia (2016) defines rehabilitation as comprising “the design and construction of landforms as well as the establishment of sustainable ecosystems or alternative vegetation, depend

    Jul 25, 2018

  • AUSIMM
    Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre Reinforcement

    By R Winterberg

    Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special

    Mar 8, 2011

  • AUSIMM
    Learning from Simulation at Boddington Gold Mine

    Various methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity

    Sep 26, 2011

  • AUSIMM
    Historical Challenges, Modern Solutions at Ballarat East

    By M Sykes

    Gold was initially discovered at Ballarat in 1851. After initial alluvial mining, underground quartz mining commenced in 1853, continuing until 1918. The historic miners were considered to be capable

    Jan 1, 2008

  • AUSIMM
    BHP Port Hedland wind fence – innovations in dust control

    By R Peiffer, L van Wyk

    The Port of Port Hedland is the largest bulk export terminal in the world and is one of Australia’s most important pieces of economic infrastructure. BHP is the largest Port user to support the export

    Sep 18, 2023

  • AUSIMM
    Operational Management of Underground In-Seam Drilling Sites

    By ZáWang, F Hungerford, T Ren

    Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov

    Jul 1, 2013

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • AUSIMM
    Insights from evidence-based safety analyses

    By M Hassall

    There is a plethora of activities that have been, and continue to be, performed to improve the health, safety and well-being of workers involved in resource industry activities. These activities inclu

    Apr 16, 2024

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    Mine Closure Guidelines for Western Australia and Consultation Process

    By X T. Nguyen

    Western AustraliaÆs Mining Act 1978 was amended in 2010 to provide for the requirement of a mine closure plan to be submitted to the Department of Mines and Petroleum (DMP) for approval, as part of a

    Jul 10, 2012

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    Rewriting the rule book – geology organisational design

    By T McLeod, B Catto

    AngloGold Ashanti Australia’s (AGAA) Tropicana gold mine (TGM) geology department seized the rare opportunity of building a new geology department for a new operation: the philosophy, the people and t

    Sep 20, 2017

  • AUSIMM
    Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington

    The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the

    Jan 1, 2002

  • AUSIMM
    The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

    By C Czerny, T Elkington, L Lorenzen

    The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha

    Sep 29, 2013

  • AUSIMM
    Application of Newly Developed Shield Tunnelling Machine for Intensive Curve

    By Yoshii Y

    Many kinds of shield machines are being driven in the soft ground of Tokyo metropolitan area. Tunnel alignments for underground power transmission lines are generally planned to pass under public r

    Jan 1, 1987

  • AUSIMM
    Vaporization During the Combustion of a Complex Copper Concentrate

    A laminar-flow furnace technique was used to study the combustion of 37-53 µm size fraction of Woodlawn copper concentrate containing 7.4 per cent zinc, 5.0 per cent lead and 22.5 per cent copper

    Jan 1, 1985

  • AUSIMM
    Assessment of phase evolution in CaO–MgO–Al2O3–SiO2 system with varied Al2O3/SiO2 ratio using in situ high-temperature Raman spectroscopy and X-ray scattering

    By G King, Q Shu, W Cao, F Gyakwaa, H Singh, S Wang, M Huttula, T Fabritius

    Metallurgical slag, such as refining slag, is essential to enhance or promote steel cleanliness. The CaO–MgO–Al2O3–SiO2 system is the primary source of oxides-based inclusions. It plays a vital role i

    Jun 19, 2024

  • AUSIMM
    Treatment and Utilisation of Hilton Mine Water

    By Teague JWS, Jung RF, Kadletz O, Jones DR, Jones CJ

    A study of the passive treatment system for Hilton minewater revealed that it consists of four main process steps. The water, which contains soluble and particulate iron and zinc and is supersaturat

    Jan 1, 1988