Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Caijiaying Dry Tailings Storage

    By R Jia, J T. Waldram

    "The Caijiaying lead zinc mine is located in China, north-west of Beijing, in Hebei Province. The region experiences severe winters, below -35°C, and warm summers, up to 30°C. The mine and con

    Oct 10, 2016

  • AUSIMM
    Adaptive management in deep sea mining – looking like you know what you’re doing when it’s never been done before

    By R L. Grogan

    Regulators of deep-sea mining projects are becoming increasingly hesitant about the concept of adaptive management as a tool to facilitate compliance and continuous improvement. Adaptive management is

    Jul 25, 2018

  • AUSIMM
    Tunnel Boring Machines in Mines – A?Brief Review of Past Use with a Status Report on Use Today in Australia

    By M Rauer

    With a worldwide growing population the demand for higher living standards, food and the development of new technology is rapidly rising. To allow for a continuous growth, larger quantities of mineral

    Sep 17, 2014

  • AUSIMM
    The Use of Risk Analysis in the Selection of a Mining Method

    It is very rare in the underground hard rock environment to find a deposit that is ideally suited to a specific mining method. Usually the irregular shape of the orebody will allow the deposit to be e

    Jan 1, 1998

  • AUSIMM
    Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter River

    By D Stacey, J Matthews

    Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The

    Jan 1, 2001

  • AUSIMM
    Why I don’t believe in reconciliation

    By S Dunham

    For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m

    May 24, 2023

  • AUSIMM
    Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLY

    The mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho

    Nov 25, 2010

  • AUSIMM
    Leadership in Projects – A Recipe for Success

    By A A. Roberts, R F. Dewhirst

    "Extensive literature surveys, research in the project environment and personal experiences both within and consulting to project teams have revealed some consistent ‘people factors’ that contribute m

    Mar 8, 2016

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    The use of Chemical and Metallurgical Parameters to Enhance the Economic Value of Kimberlite Resource Models

    By J Stiefenhofer

    "*This is an abstract only*Construction of geological models for kimberlites has historically largely been based on visual volcanic textures and features, with chemical data only collected on an ad-ho

    Sep 29, 2013

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Measured Resources and Proven Reserves – Are they still Relevant?

    By S Juras

    The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine

    Aug 22, 2011

  • AUSIMM
    Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging Junior

    By H Fletcher

    Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P

    Jul 11, 2011

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • AUSIMM
    Underground Auxiliary Ventilation Monitoring and Diagnostic System

    By S Viviers, G Ratner

    Ventilation is part of all underground mine operations and is undertaken in order to introduce fresh, cool air to the workings and to remove stale, affected air. It is problematic to obtain efficient

    Jul 1, 2013

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Integrating North American Shaft Sinking Practices into Australian Operations ù Telfer Hoist Shaft Development

    By P Bonniwell

    As a part of the Newcrest, Telfer Expansion Project, a consortium of Australian, Canadian and South African Mining Contractors in joint venture have been contracted to develop the hoisting shaft. The

    Jan 1, 2005

  • AUSIMM
    Quantitative Mineral Mapping – A Building Block for Geometallurgy at Olympic Dam

    By K Ehrig

    Two irrefutable facts in geology and metallurgy are: ore deposits are comprised of variable mixtures of minerals which are systematically distributed throughout the deposit, and mineralogy exert

    Sep 5, 2011

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    æGarnieritesÆ of Goro, New Caledonia

    By E R. Ramanaidou, C Tessarolo, M Verrall

    Garnierite mineralogy in saprolitic ore of the Goro lateritic nickel deposit, New Caledonia , was investigated using X-ray diffraction (XRD), optical and scanning electron microscopy (SEM) and electro

    Jan 1, 2008