Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    The Development of Mechanised Pipe Jacking in the United Kingdom

    Pipe Jacking has been a recognised method of tunnelling in the U.K. since the early 1950's, although I understand that pipes were pushed blind by the soldiers in the first World War from tren

    Jan 1, 1987

  • AUSIMM
    Managing Expectations – From Buyer Beware to Buyer Be Aware

    By P J. Fairfield

    "This paper reflects on the author’s experiences in undertaking mining studies and reviewing mining projects and technical reports, particularly over the past five years, and the impact of recent chan

    Mar 8, 2016

  • AUSIMM
    The Hydrothermal Fluid Chemistry of Orogenic Gold Deposits and Implications for Ore Genetic Models

    The source and origins of the hydrothermal fluid of orogenic, or quartz-vein lode-gold deposits remain uncertain and disputed: Resolution would likely have a significant affect on exploration strategy

    Jan 1, 2002

  • AUSIMM
    Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and Reconciliation

    An integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore

    Jan 1, 1990

  • AUSIMM
    New Zealand Offshore Gold Exploration - The Harvester Project

    By N G. Corner

    A sea bed sampling programme by CRA Exploration Pty Limited over an area of 12 000 km offshore from Westland, Southland and Otago, New Zealand, led to the discovery of the Harvester Prospect, an area

    Jan 1, 1990

  • AUSIMM
    A Preliminary Investigation into Electro-strengthening of Tailings for Surface and Underground Disposal

    By B Chappell

    Backfill in the form of mine waste tailings has inherent problems associated with attaining adequate strengths upon placement. Fines are usually removed to ensure adequate drainage, which lowers the c

    Jan 1, 1998

  • AUSIMM
    DeGrussa Copper Mine – mine closure experience

    By M Bellamy

    The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first

    Mar 29, 2023

  • AUSIMM
    Recent Changes in ERA - Ranger Mine Acid Leach Circuit

    By M W Kearns

    The ERA - Ranger Mine ore processing operation consists of a sulphuric acid leach followed by counter current decantation and solvent extraction circuits. The most expensive unit processing operatio

    Jan 1, 1994

  • AUSIMM
    Optimisation of Steam and Energy Usage in a Nickel Refinery

    The nickel refinery at Yabulu consumes an average of 118,000 kg/h of low pressure steam in stripping operations to-recover ammonia and carbon dioxide from product liquor and ore tailings streams. The

    Jan 1, 1985

  • AUSIMM
    Planning of Air Cooling Systems in Mines and Tunnels

    By J Walasiak

    In the climate planning of mines and tunnelling with anticipated poor climatic conditions, and especially in case of longer working shifts, the main question is whether it can be reliably prevented th

    Jan 1, 2005

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    The Separation of Natroalunite from Kaolin by Selective Flocculation

    By Liu H, Chen S

    Natroalunite is one of colouring minerals in kaolin. In this investigation, natroalunite, on which Ca(II) was adsorbed, was flocculated by HPAM and kaolin was depressed in suspension. The adsorption

    Jan 1, 1993

  • AUSIMM
    Rotary Drilling Automation Increasing Operator Productivity and Drilling Quality

    By L Eriksson, D Penn, J Appelgren

    Atlas Copco, a leading supplier of equipment and services to the mining and construction industries, is consistently pursuing its strategy to offer the most productive and economical solutions by cont

    Sep 18, 2012

  • AUSIMM
    Independent Decline Haulage at Kanowna Belle Gold Mines

    In May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w

    Jan 1, 2002

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving Mines

    By G Pizarro, O Miranda, D Rosales

    In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i

    May 9, 2016

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    Development of the Ernest Henry Underground Mine – The Challenges and the Solutions

    By T Purvis

    Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp

    Mar 21, 2011